Drillers Ridge
Drillers Ridge is an iron ore exploration project in the Shire of Ashburton, Western Australia. Its 7 WAMEX reports were lodged by 2 companies between 2017 and 2022, most recently Hancock Prospecting Pty Ltd in 2022.
Who has explored here
Companies that lodged reports over Drillers Ridge, most active first.
Who controls this ground today
Today 17 live and pending tenements sit over the Drillers Ridge ground, held under 10 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Drillers Ridge
- Local government
- Shire of Ashburton
- Commodities targeted
- Iron 7
- Work on record
- Environmental management 3 · Aerial colour photography 2 · Aerial lidar surveys 1 · Aerial magnetic surveys 1 · Digital elevation modelling 1 · Geological interpretation 1 · Land access 1 · Other activities 1
- Resource declared
- Never on this record
- Downloadable data
- 5 of 7 reports include a digital package
- Reports with no exploration
- 1 of 7 record no work done
- Report types
- Annual 6 · Partial Surrender 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A133015 | 2022 | Hancock Prospecting Pty Ltd | E47/3453 Bee Gorge Partial Surrender Assessment Report for the period 20 September 2016 to 19 September 2022 |
| A125464 | 2020 | Hancock Prospecting Pty Limited | Drillers Ridge Project E47/3453 (Bee Gorge) Annual Report for the period ending 19/09/2020 |
| A122047 | 2019 | Hancock Prospecting Pty Limited | E47/3453 Bee Gorge Annual Report for the period 20 September 2018 to 19 September 2019 |
| A120275 | 2019 | Hancock Prospecting Pty Limited | Drillers Ridge Project C56/2017 Combined Annual Report for the period 02/03/2018 to 01/03/2019, E47/01607, E47 |
| A118768 | 2019 | Hancock Prospecting Pty Ltd | Drillers Ridge Project E47/3453 (Bee Gorge) Annual Report for the period 20 September 2017 to 19 September 20 |
| A116856 | 2018 | Hancock Prospecting Pty Ltd | Drillers Ridge Project C56/2017 Combined Annual Report for the period 2 March 2017 to 1 March 2018, E47/01607, |
| A115307 | 2017 | Central Pilbara South Iron Ore Pty Ltd | Drillers Ridge Project E47/3453 Bee Gorge Annual Report for the period 20 September 2016 to 19 September 2017 |
Other projects in the Shire of Ashburton
What does the exploration record say about Drillers Ridge?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.