Pillara
Pillara is a zinc, lead and base metals exploration project in the Shire of Derby-West Kimberley, Western Australia. Its 42 WAMEX reports were lodged by 6 companies between 1978 and 2020, most recently Lennard Shelf Pty Ltd in 2020. Of those, 6 declare a resource.
Who has explored here
Companies that lodged reports over Pillara, most active first.
Who controls this ground today
Today 7 live and pending tenements sit over the Pillara ground, held under 3 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Pillara
- Local government
- Shire of Derby-West Kimberley
- Commodities targeted
- Lead 33 · Zinc 33 · Base Metals 13 · Copper 4 · No Target Commodity 3 · Silver 3
- Work on record
- Diamond drilling 24 · Soil sampling 16 · Rock chip sampling 11 · IP surveys 9 · Gravity surveys 8 · Mineral resource estimate 6 · Rehabilitation 6 · Environmental management 5
- Resource declared
- Yes, in 6 reports: A68681 (2004), A66159 (2003), A64395 (2002), A60289 (2000), A47401 (1996), A40657 (1994)
- Downloadable data
- 24 of 42 reports include a digital package
- Reports with no exploration
- 8 of 42 record no work done
- Report types
- Annual 31 · Partial Surrender 9 · Final Surrender 1 · Non-statutory 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A123257 | 2020 | Lennard Shelf Pty Ltd | Annual Mineral Exploration Report for Combined Reporting Group C9/2011 - Pillara Project - 1 January 2019 to 3 |
| A119687 | 2019 | Lennard Shelf Pty Ltd | Annual Report – Pillara Group Report C09/2011 for the period 1st January 2018 – 31st December 2018, M04/118, M |
| A116629 | 2018 | Lennard Shelf Pl | Annual Report – Pillara Group Report C09/2011 for the period 1st January 2017 – 31st December 2017, M04/118, M |
| A112530 | 2017 | Lennard Shelf Pl | ANNUAL REPORT Pillara Group Report C09/2011 Inc M04/118, M04/205, M04/206 PILLARA Project Reporting Period 1st |
| A108311 | 2016 | Lennard Shelf Pl | Annual Report Pillara Group Report C09/2011 Inc M04/118, M04/205, M04/206 PILLARA Project Reporting Period 1st |
| A104992 | 2014 | Lennard Shelf Pl | Annual Report – Pillara Group Report (C09/2011) M04/118, M04/205, M04/206 for the period 1st January 2014 – 31 |
| A101703 | 2014 | Lennard Shelf Pty Ltd | Annual Report Pillara Group Report C09/2011 Pillara Project M04/118, M04/205, M04/206 for the period 01 Jan 13 |
| A97699 | 2012 | Lennard Shelf Pty Ltd | Annual Report – Pillara Group Report C09/2011, M04/118, M04/205, M04/206 for the period 1st January 2012 – 31s |
| A93423 | 2012 | Lennard Shelf Pty Ltd | Annual Report – Pillara Group Report C09/2011, M04/118, M04/205, M04/206 for the period 1st January 2011 – 31s |
| A77687 | 2008 | Lennard Shelf Pty Ltd | ANNUAL REPORT, Group Report C27/2006, Lennard Shelf Project, 01 Jan 07 to 31 Dec 07. |
| A74002 | 2007 | Lennard Shelf Pty Ltd | 4th Year Partial Relinquishment, E04/1204, 8 October 2002 to 1 October 2006, (Noonkanbah). |
| A74001 | 2007 | Lennard Shelf Pty Ltd | 4th Year Partial Relinquishment, E04/1205, 8 October 2002 to 1 October 2006, (Noonkanbah). |
| A74000 | 2007 | Lennard Shelf Pty Ltd | 4th Year Partial Relinquishment, E04/1206, 8 October 2002 to 1 October 2006, (Noonkanbah). |
| A71739 | 2006 | Teck Cominco Wa Pty Ltd | Annual Report Group Report C326/1997, Pillara Project, E04/601,1031,1036-1038,1204-1206,1209,M04/118,176,200,2 |
| A71155 | 2005 | Teck Cominco Wa Pty Ltd | Annual Report, Group Report C326/1997, Pillara Project, E04/601, E04/1031,E04/1036-E04/1038, 1204-1206, 1209, |
| A68681 | 2004 | Teck Cominco Wa Pty Ltd | Annual Report for the period 01/01/2003-31/12/2003 Pillara Project (C326/1997), E04/601, E04/1031, E04/1036, E |
| A66159 | 2003 | Western Metals Ltd | Annual Exploration Report 01/01/2002 to 31/12/2002 Pillara Project C326/1997: E4/601, 1031, 1036, 1037, 1038, |
| A64395 | 2002 | Western Metals Ltd | 2001 Annual Exploration Report. Pillara Project. Group Reporting C326/1997. Reporting Period: 01/01/01 to 31/1 |
| A62155 | 2001 | Western Metals Ltd | 2000 Annual Exploration Report Pillara Project reporting period 01/01/00 to 31/12/00 tenements E04/601, 1031, |
| A61678 | 2001 | Western Metals Ltd | Pillara Project, E04/1036, Partial Relinquishment Report Period 01/07/1996 to 18/12/2000. |
All 42 report numbers over Pillara
Other projects in the Shire of Derby-West Kimberley
What does the exploration record say about Pillara?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.