NextMaps›Exploration Projects›Shire of East Pilbara›Giles Maxi

Giles Maxi

Shire of East Pilbara

Giles Maxi is an iron ore exploration project in the Shire of East Pilbara, Western Australia. Its 8 WAMEX reports were lodged by 2 companies between 1991 and 2003, most recently Bhp Billiton Iron Ore Pty Ltd in 2003. Of those, 1 declares a resource.

Reports
8
Operators
2
companies on record
Worked
13yrs
1991 to 2003, 23 years ago
Main target
Iron
Free AI report on Giles Maxi
NextMaps reads the open-file WAMEX reports over this ground into one cited prospectivity assessment: the geology, past programs, drill intercepts and the gaps nobody tested. New accounts get one free.
Get the free reportStart the report
Explore on the live map
Giles Maxi in the Shire of East Pilbara
Ground extent20 × 6.3 km

Who has explored here

Companies that lodged reports over Giles Maxi, most active first.

Bhp Iron Ore Pty Ltd 6Bhp Billiton Iron Ore Pty Ltd 2

Who controls this ground today

Today 17 live and pending tenements sit over the Giles Maxi ground, held under 13 names.

Free account
  • Which tenements sit over this ground, and who holds each
  • The area they cover and when they expire
  • The main holders here, by number of titles
Create a free account
Premium
  • Whether that ground is meeting its expenditure commitments
  • Dormant tenements and active forfeitures
  • Mortgages, caveats and the expiry profile
See Premium

Exploration record on Giles Maxi

Local government
Shire of East Pilbara
Commodities targeted
Iron 8
Work on record
Caliper logging 5 · Magnetic susceptibility 5 · RC drilling 5 · Neutron logging 4 · Density 3 · Gamma gamma logging 3 · Gamma logging 2 · Geophysical logging 2
Resource declared
Yes, in 1 report: A35129 (1991)
Downloadable data
4 of 8 reports include a digital package
Report types
Annual 8
Reports by decade
51990s
32000s

Exploration reports

8 WAMEX reports filed over Giles Maxi.
Rather than open these one by one on the DMPE site, have the record over this ground read into one cited report, free for new accounts.
Most recent reports
ReportYearOperatorTitle
A67668 2003 Bhp Billiton Iron Ore Pty Ltd Annual Report, Ophthalmia, E47/24, Period 19/12/2002 -18/12/2003.
A64165 2002 Bhp Billiton Iron Ore Pty Ltd Annual Report Ophthalmia E47/24 period 19 December 2000 - December 2001.
A61512 2001 Bhp Iron Ore Pty Ltd Annual Report, Opthalmia, E47/24, period 18 December 1999 to 17 December 2000.
A59446 1999 Bhp Iron Ore Pty Ltd Annual Report, Ophthalmia, E47/24, Period 18 December 1998 to 17 December 1999.
A57015 1998 Bhp Iron Ore Pty Ltd Ophthalmia E47/24 18/12/97 - 17/12/98
A49856 1996 Bhp Iron Ore Pty Ltd Annual report Opthalmia E47/24 Period 18 December 1995 to 17 December 1996
A46522 1995 Bhp Iron Ore Pty Ltd Annual report Ophthalmia E47/24 Period 18 December 1994 to 17 December 1995
A35129 1991 Bhp Iron Ore Pty Ltd Report on E47/24; Ophthalmia 1991 Programme (Annual Report)

Other projects in the Shire of East Pilbara

What does the exploration record say about Giles Maxi?

NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.

Get the free reportStart the report Open this ground on the map
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.