Jimblebar
Jimblebar is an iron ore, base metals and copper exploration project in the Shire of East Pilbara, Western Australia. Its 42 WAMEX reports were lodged by 9 companies between 1987 and 2020, most recently Atlas Iron Pty Ltd in 2020. Of those, 9 declare a resource.
Who has explored here
Companies that lodged reports over Jimblebar, most active first.
Who controls this ground today
Today 25 live and pending tenements sit over the Jimblebar ground, held under 11 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Jimblebar
- Local government
- Shire of East Pilbara
- Commodities targeted
- Iron 38 · Base Metals 4 · Gold 4 · Copper 3 · Platinum Group Elements 1
- Work on record
- RC drilling 24 · Caliper logging 10 · Magnetic susceptibility 9 · Mineral resource estimate 9 · Neutron logging 9 · Gamma gamma logging 7 · Gamma logging 7 · Geophysical interpretation 5
- Resource declared
- Yes, in 9 reports: A100794 (2014), A92923 (2012), A63967 (2001), A61119 (2000), A59000 (1999), A52804 (1997) and 3 more
- Downloadable data
- 18 of 42 reports include a digital package
- Reports with no exploration
- 1 of 42 record no work done
- Report types
- Annual 34 · Non-statutory 4 · Partial Surrender 3 · Final Surrender 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A122480 | 2020 | Atlas Iron Pty Ltd | Jimblebar Combined Annual Report (C121/2007) for the period ending 31 December 2019, E52/01772, E52/02303, M52 |
| A119480 | 2019 | Atlas Iron Limited | Jimblebar Combined Annual Report (C121/2007) for the period ending 31 December 2018, E52/01772, E52/02303, M52 |
| A116296 | 2018 | Atlas Iron Limited | Jimblebar Combined Annual Report (C121/2007) for the period 01 January 2017 to 31 December 2017, E52/01772, E5 |
| A108442 | 2016 | Atlas Iron Ltd | Jimblebar Project E52/1772-I, E52/2303-I, M52/211, M52/790, M52/799 Annual Technical Report To the Department |
| A107212 | 2015 | Atlas Iron Ltd | Jimblebar Project Partial Surrender Report to the Department of Mines and Petroleum for the Period 17 Septembe |
| A106228 | 2015 | Atlas Iron Limited | Jimblebar Project P52/1326-I Final Surrender Report to the Department of Mines and Petroleum for the Period 14 |
| A104629 | 2015 | Atlas Iron Ltd | Jimblebar Project C121/2007 Annual Technical Report to the Department of Mines and Petroleum for the Period En |
| A103704 | 2014 | Atlas Iron Ltd | Jimblebar Project Partial Surrender Report to the Department of Mines and Petroleum for the Period 29 Septembe |
| A100794 | 2014 | Atlas Iron Ltd | Jimblebar Project Annual Technical Report to the Department of Mines and Petroleum for the Period Ending 31 De |
| A96701 | 2013 | Atlas Iron Ltd | JIMBLEBAR PROJECT E52/1595-I, 1750-I,1772-I, 1823-I, 2303-I, M52/21, 790- 799, P52/1124-I ,1125-I,1238-I, 132 |
| A92923 | 2012 | Atlas Iron Ltd | Jimblebar Project C121/2007 Annual Report to DMP Period Ending 31 December 2011, E52/1595, 1750, 1772, 1823, 2 |
| A90461 | 2011 | Atlas Iron Ltd | Jimblebar Project P52/1326 Annual Report for the period ending 14th May 2011 |
| A89840 | 2011 | Atlas Iron Ltd | Annual Report to the Department of Mines and Petroleum for the period 01/01/10 to 31/12/10, Jimblebar, E52/159 |
| A70997 | 2005 | Bhp Coal Pty Ltd | Annual report, Carramulla E52/172 and E52/18, Reporting period 20 August 2004 to 19 August 2005 (East Jimbleba |
| A67199 | 2003 | Bhp Coal Pty Ltd | Annual Report, East Jumblebar, E52/172, Reporting period 20 August 2002 - 19 August 2003, (E52/18 not worked |
| A65579 | 2002 | Bhp Billiton Iron Ore Pty Ltd | Annual Reprot West Jimblebar E52/745 Period 2 January 2002 - 1 January 2003 |
| A64445 | 2002 | Sylvania Resources Ltd | Partial Surrender Report E52/1328 Jimblebar GSWA Ref No. M9739/1. |
| A63967 | 2001 | Bhp Billiton Iron Ore Pty Ltd | Annual Report West Jimblebar E52/745 period 2 January 2001 - 1 January 2002. |
| A63802 | 2001 | Sylvania Resources Ltd | Annual Report for the year ending June 2000 E52/1328 Jimblebar Project. |
| A63186 | 2001 | Sylvania Resources Ltd | Jimblebar Project E52/132B M52/211 Transient Electromagnetic Survey P. Mutton & W.S. Peters March 2001. |
All 42 report numbers over Jimblebar
Other projects in the Shire of East Pilbara
What does the exploration record say about Jimblebar?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.