Talga Talga
Talga Talga is a gold, lithium and base metals exploration project in the Shire of East Pilbara, Western Australia. Its 26 WAMEX reports were lodged by 11 companies between 1969 and 2026, most recently New Age Exploration Ltd in 2026. Of those, 2 declare a resource.
Who has explored here
Companies that lodged reports over Talga Talga, most active first.
Who controls this ground today
Today 14 live and pending tenements sit over the Talga Talga ground, held under 8 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Talga Talga
- Local government
- Shire of East Pilbara
- Commodities targeted
- Gold 19 · Copper 7 · Nickel 6 · Base Metals 5 · Lithium 4
- Work on record
- Rock chip sampling 11 · Geological mapping 9 · Soil sampling 9 · Stream sediment sampling 6 · Aerial colour photography 4 · Surface geochemistry 4 · Diamond drilling 2 · Digital terrain modelling 2
- Resource declared
- Yes, in 2 reports: A107013 (2015), A24583 (1988)
- Downloadable data
- 12 of 26 reports include a digital package
- Reports with no exploration
- 2 of 26 record no work done
- Report types
- Annual 18 · Final Surrender 5 · Non-statutory 3
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A155328 | 2026 | New Age Exploration Ltd | Final Technical Report Talga Talga Project E45/5180 for the period ending 26/06/2026 |
| A150049 | 2025 | New Pilbara Gold Pty Ltd | ATR - Talga Talga Project (E45/5180) for the period ending 21/07/2025. |
| A146016 | 2025 | New Age Exploration Limited | E45/05180 Annual Report Talga Talga Gold Project for the period ending 21 July 2024 |
| A137340 | 2023 | New Age Exploration Limited | E 45/05180 - Talga AnnuaL Technical Report for the period ending 21/07/2023. |
| A125286 | 2020 | Beatons Creek Gold Pty Ltd | Annual Mineral Exploration Report for C235/2011 Talga Talga Project for the period ending 31/08/2020 |
| A121438 | 2019 | Beatons Creek Gold Pty Ltd | Annual Mineral Exploration Report - Talga Talga Project M45/618 for the period 1 September 2018 to 31 August 2 |
| A120572 | 2019 | Beatons Creek Gold Pty Ltd | Final Surrender Report for P45/2774 - Talga Talga Project for the period 15 July 2011 to 21 June 2019 |
| A120338 | 2019 | Beatons Creek Gold Pty Ltd | [C235/2011] Final Surrender Report for P45/2746 and P45/2747 Talga Talga Project for the period 15 April 2011 |
| A118222 | 2018 | Beatons Creek Gold Pty Ltd | Combined Annual Mineral Exploration Report C235/2011 Talga Talga Project for the period 1 September 2017 to 31 |
| A116728 | 2018 | Beatons Creek Gold Pty Ltd | Talga Talga Project C235/2011 Final Surrender Report for P 45/2689 - 2691 For the Period 19 March 2010 to 18 M |
| A116076 | 2018 | Beatons Creek Gold Pty Ltd | Combined Annual Mineral Exploration Report of the Talga Talga Project C235/2011 for the period 31/08/2016 - 01 |
| A110597 | 2016 | Beatons Creek Gold Pty Ltd | Combined Annual Mineral Exploration Report for the Talga Talga Project, Combined Reporting Group C235/2011 |
| A107013 | 2015 | Talga Gold Ltd | Talga Talga Project C235/2011, M45/618, P45/2689, P45/2690, P45/2691, P45/2746, P45/2747, P45/2774 for the per |
| A103518 | 2014 | Talga Gold Ltd | Talga Talga Project 2014 Annual Report for the period 1st September 2013 to 31st August 2014 Combined Reportin |
| A95692 | 2012 | Talga Gold Ltd | Talga Talga Project - Annual Report for the period 1/09/2011 to 31/08/2012, M45/618, P45/2689, P45/2690, P45/2 |
| A92013 | 2011 | Talga Gold Ltd | Talga Talga Project - 2011 Annual Report, 1/09/2010 to 31/08/2011, C235/2011, M45/618, P45/2689, P45/2690, P45 |
| A39551 | 1993 | Aztec Mining Co Ltd | Final Surrender Report, E45/1304, Talga Talga Project, Marble Bar, WA, 30 November 1992 to 19 October 1993. |
| A24583 | 1988 | Jlv Constructors Pty Ltd | Talga Talga Gold Prospect, Annual report, July 1988, M45/69, M45/150, GML45/1869-1870 |
| A20354 | 1986 | Thames Mining Nl | Report, Talga Talga Prospect, P45/691, 692, August 1986. |
| A17713 | 1984 | Saunders & Associates | Talga Talga, Annual report, November 1984, P45/691-692. |
All 26 report numbers over Talga Talga
Other projects in the Shire of East Pilbara
What does the exploration record say about Talga Talga?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.