Tambourah - Soansville - Mercury Hill - Tank Hill
Tambourah - Soansville - Mercury Hill - Tank Hill is a gold, nickel and silver exploration project in the Shire of East Pilbara, Western Australia. Its 8 WAMEX reports were lodged by Haoma Mining Nl between 1998 and 2017.
Who has explored here
Companies that lodged reports over Tambourah - Soansville - Mercury Hill - Tank Hill, most active first.
Who controls this ground today
Today 134 live and pending tenements sit over the Tambourah - Soansville - Mercury Hill - Tank Hill ground, held under 48 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Tambourah - Soansville - Mercury Hill - Tank Hill
- Local government
- Shire of East Pilbara
- Commodities targeted
- Gold 8 · Nickel 3 · Silver 3 · Base Metals 2 · Copper 1 · Platinum Group Elements 1
- Work on record
- Rock chip sampling 3 · Aerial EM surveys 1 · Geophysical interpretation 1 · Metallurgy 1 · Mineral processing 1 · Multielement analysis 1 · RC drilling 1 · Soil sampling 1
- Resource declared
- Never on this record
- Downloadable data
- 2 of 8 reports include a digital package
- Reports with no exploration
- 2 of 8 record no work done
- Report types
- Annual 8
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A112488 | 2017 | Haoma Mining Nl | C283/1997 Soansville Project Annual Report for the period 01/12/2015 to 30/11/2016, E45/04174, E45/04175, E45/ |
| A93900 | 2012 | Haoma Mining Nl | Annual report for the period 1 December 2010 to 30 November 2011, Tambourah / Soansville / Mercury Hill / Tank |
| A89634 | 2011 | Haoma Mining Nl | Tambourah/Soansville/Mercury Hill/Tank Hill (Group 4), Annual Report for the Period 1 December 2009 – 30 Novem |
| A86382 | 2010 | Haoma Mining Nl | TAMBOURAH / SOANSVILLE / MERCURY HILL / TANK HILL (Group 4) - Annual Report for the period 1 December 2008 to |
| A78065 | 2008 | Haoma Mining Nl | TAMBOURAH/ SOANSVILLE/ MERCURY HILL/ TANK HILL (Group 4) Annual Report for the period 1 December 2006 - 30 Nov |
| A74316 | 2007 | Haoma Mining Nl | Tambourah/ Soansville /Mercury Hill/ Tank Hill (Group 4) M45/588,P45/2250,2269,2292-2298, Annual Report for th |
| A72848 | 2006 | Haoma Mining Nl | Tambourah/Soansville/Mercury Hill/Tank Hill(Group 4) M45/588,P45/2250,2269,2292-2298, Annual Report for the Pe |
| A54107 | 1998 | Haoma Mining Nl | Tambourah, Mercury Hill, Tank Hill, Soansville Annual Report, Period End: 11/1997 E45/1495, P45/2270, M45/558, |
Other projects in the Shire of East Pilbara
What does the exploration record say about Tambourah - Soansville - Mercury Hill - Tank Hill?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.