Pinjin Central
Pinjin Central is a gold exploration project in the City of Kalgoorlie-Boulder, Western Australia. Its 8 WAMEX reports were lodged by St Barbara Ltd between 2016 and 2020.
Who has explored here
Companies that lodged reports over Pinjin Central, most active first.
Who controls this ground today
Today 58 live and pending tenements sit over the Pinjin Central ground, held under 15 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Pinjin Central
- Local government
- City of Kalgoorlie-Boulder
- Commodities targeted
- Gold 8
- Work on record
- Aircore drilling 8 · Geochemical interpretation 5 · Rock chip sampling 5 · Ground gravity surveys 4 · Heritage survey 4 · RC drilling 4 · Geological reconnaissance 3 · Geophysical interpretation 3
- Resource declared
- Never on this record
- Downloadable data
- 8 of 8 reports include a digital package
- Report types
- Annual 5 · Final Surrender 2 · Partial Surrender 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A124701 | 2020 | St Barbara Limited | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2019 to 30 Jun |
| A124593 | 2020 | St Barbara Limited | E28/2447 - Partial Surrender Report for the Period 4 September 2014 to 24 June 2020, Pinjin Central Project |
| A124525 | 2020 | St Barbara Limited | E28/2218 - Final Surrender Report for the Period 3 August 2012 to 24 June 2020, Pinjin Central project |
| A124492 | 2020 | St Barbara Limited | Pinjin Central E28/2445 - Final Surrender Report for the Period 10 July 2014 to 24 June 2020 |
| A120891 | 2019 | St Barbara Limited | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2018 to 30 Jun |
| A117529 | 2018 | St Barbara Limited | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2017 to 30 Jun |
| A114571 | 2017 | St Barbara Limited | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2016 to 30 Jun |
| A109693 | 2016 | St Barbara Limited | Pinjin Central Project Combined Reporting Group C125/2015 - Annual Report for the Period 1 July 2015 to 30 Jun |
Other projects in the City of Kalgoorlie-Boulder
What does the exploration record say about Pinjin Central?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.