Pinjin South
Pinjin South is a gold exploration project in the City of Kalgoorlie-Boulder, Western Australia. Its 10 WAMEX reports were lodged by St Barbara Ltd between 2016 and 2020.
Who has explored here
Companies that lodged reports over Pinjin South, most active first.
Who controls this ground today
Today 11 live and pending tenements sit over the Pinjin South ground, held under 3 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Pinjin South
- Local government
- City of Kalgoorlie-Boulder
- Commodities targeted
- Gold 10
- Work on record
- Aircore drilling 8 · Geochemical interpretation 7 · Heritage survey 6 · Rock chip sampling 6 · Surface geochemistry 6 · Geological reconnaissance 4 · Geophysical interpretation 3 · Ground gravity surveys 2
- Resource declared
- Never on this record
- Downloadable data
- 10 of 10 reports include a digital package
- Report types
- Annual 5 · Final Surrender 3 · Partial Surrender 2
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A124697 | 2020 | St Barbara Limited | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2019 to 30 June |
| A124591 | 2020 | St Barbara Limited | E28/2446 - Partial Surrender Report for the Period 25 August 2014 to 24 June 2020 Pinjin South project. |
| A124585 | 2020 | St Barbara Limited | E28/2264 - Partial Surrender Report for the Period 2 April 2013 to 24 June 2020, Pinjin South project. |
| A124534 | 2020 | St Barbara Limited | E28/2357 - Final Surrender Report for the Period 10 July 2014 to 24 June 2020 Pinjin South project |
| A124532 | 2020 | St Barbara Limited | E28/2245 - Final Surrender Report for the Period 15 February 2013 to 24 June 2020, Pinjin South project. |
| A124524 | 2020 | St Barbara Limited | E28/2250 - Final Surrender Report Pinjin South project for the Period 22 March 2013 to 24 June 2020 |
| A120894 | 2019 | St Barbara Limited | Pinjin South Project Combined Reporting Group C124/2015 Annual Report for the Period 1 July 2018 to 30 June 20 |
| A117533 | 2018 | St Barbara Limited | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2017 to 30 June |
| A114577 | 2017 | St Barbara Limited | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2016 to 30 June |
| A109692 | 2016 | St Barbara Limited | Pinjin South Project Combined Reporting Group C124/2015 - Annual Report for the Period 1 July 2015 to 30 June |
Other projects in the City of Kalgoorlie-Boulder
What does the exploration record say about Pinjin South?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.