Maitland River
Maitland River is an iron ore, gold and sand exploration project in the City of Karratha, Western Australia. Its 23 WAMEX reports were lodged by 6 companies between 2009 and 2023, most recently Leichhardt Salt Pty Ltd in 2023. Of those, 2 declare a resource.
Who has explored here
Companies that lodged reports over Maitland River, most active first.
Who controls this ground today
Today 52 live and pending tenements sit over the Maitland River ground, held under 18 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Maitland River
- Local government
- City of Karratha
- Commodities targeted
- Iron 15 · Gold 8 · Sand 8 · Base Metals 2
- Work on record
- Geological mapping 6 · Geological reconnaissance 5 · Metallurgy 5 · Rehabilitation 4 · Core library 3 · RC drilling 3 · Rock chip sampling 3 · Diamond drilling 2
- Resource declared
- Yes, in 2 reports: A95872 (2012), A92064 (2011)
- Downloadable data
- 18 of 23 reports include a digital package
- Reports with no exploration
- 2 of 23 record no work done
- Report types
- Annual 18 · Core Library Drilling 2 · Final Surrender 2 · Partial Surrender 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A136733 | 2023 | Leichhardt Salt Pty Ltd | Maitland River Project - Selected Sampling of MRDDH0001 (P1558) |
| A123550 | 2020 | Bci Minerals Limited | Core Donation - Drillhole MRDDH0001 |
| A118695 | 2019 | Bci Minerals Limited | Maitland River C86/2011 Annual Report for the Period 11 November 2017 to 10 November 2018, E47/01537, E47/0237 |
| A118471 | 2018 | Bci Minerals Limited | Final Surrender Report For E47/2677 Maitland River Project for the period 27 June 2013 to 20 September 2018 |
| A117705 | 2018 | Bci Minerals Limited | Final Surrender Report E47/2505 2018, Maitland River, 27 August 2008 - 05 July 2018 |
| A117694 | 2018 | Bci Minerals Limited | Partial Surrender E47/1538 Maitland River, 11 November 2008 - 05 July 2018 |
| A115672 | 2018 | Bci Minerals Limited | Maitland River C86/2011 Annual Report for the Period 11 November 2016 to 10 November 2017, E47/01537, E47/0237 |
| A110607 | 2017 | Bc Iron Limited | Maitland River Project E47/1537, E47/2372, E47/2505 & E47/2677 Annual Report. 11 November 2015 to 10 November |
| A107632 | 2016 | Bc Iron Limited | Maitland River Project E47/1537, E47/2372, E47/2505 & E47/2677 Annual Report for the 11 November 2014 to 10 No |
| A106753 | 2015 | Alliance Contracting Pty Ltd | Annual Mineral Exploration Report for Mining Leases M47/66 for the period 16 August 2014 to 15 August 2015, Ma |
| A106752 | 2015 | Alliance Contracting Pty Ltd | Annual Mineral Exploration Report for Mining Leases M47/65 for the period 16 August 2014 to 15 August 2015, Ma |
| A104280 | 2014 | Iron Ore Holdings Ltd | Maitland River Project E47/1537, E47/2372, E47/2505 & E47/2677 Annual Report. 11th November 2013 to 10th Novem |
| A104161 | 2014 | Alliance Contracting Pty Ltd | Annual Mineral Exploration Report for Mining Leases M47/66 for the period 16 August 2013 to 15 August 2014, Al |
| A104160 | 2014 | Alliance Contracting Pty Ltd | Annual Mineral Exploration Report for Mining Leases M47/65 for the period 16 August 2013 to 15 August 2014, Al |
| A101024 | 2014 | Alliance Contracting Pty Ltd | Maitland River Project, Annual Report for the period 16/08/2012 to 15/08/2013, M47/66. |
| A101023 | 2014 | Alliance Contracting Pty Ltd | Maitland River Project, Annual Report for the period 16/08/2012 to 15/08/2013, M47/65. |
| A100228 | 2013 | Iron Ore Holdings Ltd | Maitland River Project E47/1537, E47/2372, E47/2505 & E47/2677 Annual Report. 11th November 2012 to 10th Novem |
| A95872 | 2012 | Iron Ore Holdings Ltd | Maitland River Project E47/1537 & E47/2372 Annual Report 11 November 2011 – 10 November 2012 |
| A95367 | 2012 | Boral Construction Materials | Annual Report for the period 15 July 2011 to 14 July 2012, Maitland River – Combined, M47/62; M47/313; M47/314 |
| A92064 | 2011 | Iron Ore Holdings Ltd | Maitland River Project, Annual Report for the period 11th November 2010 to 10th November 2011, E47/1537 & 2372 |
All 23 report numbers over Maitland River
Other projects in the City of Karratha
What does the exploration record say about Maitland River?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.