Mardie
Mardie is an industrial minerals, salt and water exploration project in the City of Karratha, Western Australia. Its 15 WAMEX reports were lodged by 5 companies between 2012 and 2026, most recently Bci Minerals Limited in 2026.
Who has explored here
Companies that lodged reports over Mardie, most active first.
Who controls this ground today
Today 41 live and pending tenements sit over the Mardie ground, held under 8 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Mardie
- Local government
- City of Karratha
- Commodities targeted
- Industrial Minerals 6 · Salt 5 · Water 4 · Construction Materials 2 · Iron 2
- Work on record
- Feasibility studies 4 · Geological reconnaissance 3 · Geotechnical drilling 2 · Groundwater surveys 2 · Water bore drilling 2 · Aggregate 1 · Density 1 · Diamond drilling 1
- Resource declared
- Never on this record
- Downloadable data
- 12 of 15 reports include a digital package
- Reports with no exploration
- 4 of 15 record no work done
- Report types
- Annual 6 · Final Surrender 5 · Partial Surrender 4
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A154870 | 2026 | Bci Minerals Limited | Surrender Technical Report for E08/3050 (Mardie Project) for the period ending 14/04/2026 |
| A154680 | 2026 | Bci Minerals Limited | Final Surrender Technical Report for E 08/3205 Mardie Project for the period ending 21/2/2026 |
| A138148 | 2024 | Mardie Minerals Pty Ltd | Partial Surrender For E 08/2740 Mardie for the period ending 02/11/2023. |
| A130219 | 2022 | Bci Minerals Limited | E08/2836 Partial Surrender Technical Report for the period 21 November 2018 to 2 February 2022 |
| A130215 | 2022 | Bci Minerals Limited | E08/2741 Partial Surrender Technical Report for the period 10 February 2016 to 9 February 2022 |
| A130213 | 2022 | Bci Minerals Limited | E08/2740 Partial Surrender Technical Report for the period 16 November 2017 to 2 February 2022 |
| A125543 | 2020 | Mardie Minerals Pty Ltd | Annual Report P08/743 Mardie Project for the period ending 20/11/2020 |
| A125274 | 2020 | Mardie Minerals Pty Ltd | Annual Report for Mardie E08/2647 for the period ending 04/09/2020 |
| A125247 | 2020 | Bci Minerals Limited | Annual Report for Mardie P08/744 for the period 17 October 2019 to 16 October 2020 |
| A125175 | 2020 | Bci Minerals Limited | Annual Report For E08/2647 Mardie project for the period 5 September 2019 to 4 September 2020 |
| A122354 | 2020 | Bci Minerals Limited | Mardie Project Combined Annual Technical Report for the Period 21 November 2018 to 20 November 2019. C129/2013 |
| A118759 | 2019 | Bci Minerals Limited | Mardie Project C129/2013 Combined Annual Technical Report for the Period 21 November 2017 to 20 November 2018, |
| A105438 | 2015 | Bc Iron Ltd | Mardie Project E08/2399 Surrender Report For The Period 6th February 2013 to 5th February 2015 |
| A103559 | 2014 | Fortescue Metals Group Ltd | Surrender Mineral Exploration Report: E08/1624 Mardie 16 May 2011 to 5 June 2014 |
| A92950 | 2012 | Atlas Iron Ltd | MARDIE POOL PROJECT, E08/1773 FINAL SURRENDER REPORT FOR THE PERIOD 28 FEBRUARY 2008 TO 6 MARCH 2012. |
Other projects in the City of Karratha
What does the exploration record say about Mardie?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.