Junction
Junction is an uranium exploration project in the Shire of Laverton, Western Australia. Its 7 WAMEX reports were lodged by Aura Energy Ltd between 2008 and 2011.
Who has explored here
Companies that lodged reports over Junction, most active first.
Who controls this ground today
See who holds the tenements over the Junction ground today, and whether that ground is being worked.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Junction
- Local government
- Shire of Laverton
- Commodities targeted
- Uranium 7
- Work on record
- Aircore drilling 4 · Aerial EM surveys 3 · Aerial radioactivity surveys 3 · Aerial magnetic surveys 2 · Aeromagnetic interpretation 1 · Co-funded drilling 1 · Environ 1 · Geophysical logging 1
- Resource declared
- Never on this record
- Downloadable data
- 7 of 7 reports include a digital package
- Reports with no exploration
- 1 of 7 record no work done
- Report types
- Annual 4 · Final Surrender 1 · Partial Surrender 1 · Co-Funded Drilling 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A89238 | 2011 | Aura Energy Ltd | E69/2263 Final Surrender report for the period 14th June 2007 to 8th November 2010 |
| A89234 | 2011 | Aura Energy Ltd | Partial Surrender report for the period 28th March 2007 to 8th November 2010 |
| A89262 | 2010 | Aura Energy Ltd | Annual report for the period 1st Jan 2010 to 31st December 2010 |
| A85697 | 2010 | Aura Energy Ltd | Junction Project C247-2007, E38/1920, E69/2263, Annual Report for the period 1st Jan 2009 to 31st December 200 |
| A89894 | 2009 | Aura Energy Ltd | Junction Project, JUNCTION PALAEOCHANNEL E38/1920 and E69/2263 URANIUM EXPLORATION DRILL PROGRAM EXPLORATION |
| A81150 | 2008 | Aura Energy Ltd | Annual report for the period 1st Jan 2008 to 31st December 2008, 1st Jan 2008 to 31st December 2008 |
| A77458 | 2008 | Aura Energy Ltd | Junction Project, Annual Report for the period 28th March 2007 to 31st December 2007,E38/1920 & E69/2263.(C24 |
Other projects in the Shire of Laverton
What does the exploration record say about Junction?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.