Pelican
Pelican is a nickel, cobalt and gold exploration project in the Shire of Laverton, Western Australia. Its 14 WAMEX reports were lodged by 5 companies between 1998 and 2015, most recently Murrin Murrin Operations Pty Ltd in 2015. Of those, 1 declares a resource.
Who has explored here
Companies that lodged reports over Pelican, most active first.
Who controls this ground today
Today 22 live and pending tenements sit over the Pelican ground, held under 12 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Pelican
- Local government
- Shire of Laverton
- Commodities targeted
- Nickel 13 · Cobalt 10 · Gold 6
- Work on record
- RC drilling 3 · Geophysical interpretation 2 · Base metals 1 · Geological reconnaissance 1 · Mine planning 1 · Mineral resource estimate 1 · Nickel 1 · RAB drilling 1
- Resource declared
- Yes, in 1 report: A60152 (2000)
- Downloadable data
- 4 of 14 reports include a digital package
- Reports with no exploration
- 2 of 14 record no work done
- Report types
- Annual 13 · Final Surrender 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A106518 | 2015 | Murrin Murrin Operations Pty Ltd | Annual Report for the Pelican Project - M38/510 for the Period 8 July 2014 to 7 July 2015 |
| A103342 | 2014 | Murrin Murrin Operations Pty Ltd | ANNUAL REPORT FOR THE PERIOD: 8 July 2013 to 7 July 2014 Pelican Project M38/510 |
| A99451 | 2013 | Minara Resources Ltd | Annual Report for the period 8 July 2012 to 7 July 2013 Pelican Project M38/510 |
| A94891 | 2012 | Murrin Murrin Operations Pty Ltd | Annual Report, Pelican Project, M38/510 Report Period: 8 July 2011 to 7 July 2012 |
| A91359 | 2011 | Murrin Murrin Operations Pty Ltd | Annual Technical Report for the period 8 July 2010 to 7 July 2011M38/510, Pelican Project, M38/510 |
| A88084 | 2010 | Minara Resources Ltd | Annual Technical Report for M38/510, FOR THE PERIOD 8 July 2009 to 7 July 2010 - Pelican |
| A84205 | 2009 | Minara Resources Ltd | First Annual Technical Report, Pelican Project M38/510, 8th July 2007 to 7th July 2009 |
| A76289 | 2007 | Barrick Gold Of Australia Ltd | Annual Report Period 1 September 2006 - 31 August 2007 Pelican Project E38/1480, E38/1584 |
| A65566 | 2002 | Anaconda Nickel Ltd | Surrender report for 30 May 2002. Pelican Grid - Black Swan Project (Prendergast Well), E38/359 and E38/427. |
| A64767 | 2002 | Anaconda Nickel Ltd | Pelican Project ,Annual Technical Report, E38/427, E38/359, P38/2476, P38/2477, P38/2380, P38/2929, P38/2934, |
| A62927 | 2001 | Anaconda Nickel Ltd | Annual Report Pelican Project E38/427 E38/359 P38/2476 P38/2477 P38/2380 P38/2929 P38/2934 P38/2935 C22/1998 R |
| A60152 | 2000 | Anaconda Nickel Ltd | Annual Report on the Pelican Project E38/427,E38/359,P38/2476,P38/2477,P38/2380,P38/2929, P38/2934,P38/2935 C2 |
| A58407 | 1999 | Anaconda Nickel Ltd | Pelican Project 01/04/1998 - 31/03/1999 E38/427, 359, P38/2380, 2476, 2477 |
| A54480 | 1998 | Placer (Granny Smith) Pty Ltd | Pelican Project, Annual Report for the year ending 30/03/1998, E38/539 & E38/427; P38/2476-2477. [C22/1998] |
Other projects in the Shire of Laverton
What does the exploration record say about Pelican?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.