Bannockburn
Bannockburn is a gold, nickel and base metals exploration project in the Shire of Leonora, Western Australia. Its 70 WAMEX reports were lodged by 20 companies between 1970 and 2020, most recently Saracen Metals Pty Limited in 2020. Of those, 10 declare a resource.
Who has explored here
Companies that lodged reports over Bannockburn, most active first.
Who controls this ground today
Today 99 live and pending tenements sit over the Bannockburn ground, held under 25 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Bannockburn
- Local government
- Shire of Leonora
- Commodities targeted
- Gold 59 · Nickel 31 · Base Metals 21 · Copper 3 · Lead 2 · Zinc 2
- Work on record
- RC drilling 32 · Soil sampling 32 · Diamond drilling 26 · Ground EM surveys 19 · Aerial magnetic surveys 15 · Rotary drilling 14 · Geophysical interpretation 11 · Mineral resource estimate 10
- Resource declared
- Yes, in 10 reports: A120768 (2019), A117443 (2018), A106898 (2015), A73469 (2006), A68280 (2004), A38773 (1993) and 4 more
- Downloadable data
- 50 of 70 reports include a digital package
- Reports with no exploration
- 1 of 70 record no work done
- Report types
- Annual 51 · Final Surrender 12 · Non-statutory 4 · Partial Surrender 2 · Co-Funded Drilling 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A124588 | 2020 | Saracen Metals Pty Limited | Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2019 to 30 June 2020 |
| A120768 | 2019 | Saracen Metals Pty Limited; Pvw Resources Nl | Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2018 to 30 June 2019, E37/00907, M37/00135 |
| A120642 | 2019 | Talisman Nickel Pty Ltd | Final Surrender Report for Tenement E37/903 Bannockburn project for the period 22 September 2008 to 3 April 2 |
| A119599 | 2019 | Saracen Metals Pty Limited | Bannockburn Final Co-funded Drilling Report (R#16) |
| A117443 | 2018 | Saracen Metals Pty Limited | Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2017 to 30 June 2018, E37/00907, M37/00135 |
| A114600 | 2017 | Saracen Metals Pty Limited | Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2016 to 30 June 2017, E37/00907, M37/00135 |
| A112410 | 2017 | Saracen Metals Pty Limited | Bannockburn Project Prospecting Licence 37/7357 Final Surrender Report for the Period 18 November 2008 to the |
| A109645 | 2016 | Saracen Metals Pty Limited | Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2015 to 30 June 2016 |
| A108968 | 2016 | Saracen Metals Pty Limited | Prospecting Licences 37/7354, P37/7355, and P37/7356 Surrender Report for the Period 18 November 2008 to the 2 |
| A108964 | 2016 | Saracen Metals Pty Limited | Prospecting Licence 37/7318 (Bannockburn) Surrender Report for the Period 24 November 2008 to the 22 December |
| A106898 | 2015 | Saracen Metals Pty Limited | Bannockburn Project (C113/2005) Annual Report for the Period 1 July 2014 to 30 June 2015, E37/907, M37/135, M3 |
| A105469 | 2015 | Saracen Metals Pty Limited | Bannockburn Project E37/907 Partial Surrender Report for the period 18/11/2008 to 17/11/2014 |
| A102552 | 2014 | Xstrata Nickel Australasia Opertions Pty Ltd | Final Surrender Report for E37/852 and E37/853 (Bannockburn C1/2006) For the Period 28/10/2008 to 27/03/2014 |
| A102535 | 2014 | Stratum Metals Ltd | Final Surrender Report, Bannockburn Project , E37/1010, for the period 14th April 2010 to 2nd April 2014. |
| A102363 | 2014 | Xstrata Nickel Australasia Operations Pty Ltd | Bannockburn Project, Annual Report for the period 17/02/2013 to 16/02/2014, E36/581 & 650; E37/538, 852-853, 9 |
| A100798 | 2013 | Xstrata Nickel Australasia Operations Pty Ltd | Bannockburn Project, Final Surrender Report for the period 28/10/2008 to18/12/2013, P36/1714-1719; E36/581; M3 |
| A98611 | 2013 | Norilsk Nickel Wildara Pty Ltd | Annual Report on the Bannockburn Project Combined Report C113/2005 for the period 1 July 2012 to 30 June 2013 |
| A98148 | 2013 | Stratum Metals Ltd | Bannockburn Project, Annual Report for the period 14th April 2012 to 13th April 2013, E37/1010. |
| A98097 | 2013 | Xstrata Nickel Australasia Operations Pty Ltd | Bannockburn Project, Annual Report for the period 17th February 2012 to 16th February 2013, E36/581 & 650; E37 |
| A97333 | 2013 | T E Johnston & Assciates Pty Ltd | Bannockburn Project, Annual Report for the period 02/02/2012 to 01/02/2013, E37/943 & 1006. [C153/2010] |
All 70 report numbers over Bannockburn
Other projects in the Shire of Leonora
What does the exploration record say about Bannockburn?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.