Sunrise Dam Group
Sunrise Dam Group is a gold exploration project in the Shire of Leonora, Western Australia. Its 5 WAMEX reports were lodged by Anglogold Ashanti Australia Ltd between 2013 and 2018. Of those, 1 declares a resource.
Who has explored here
Companies that lodged reports over Sunrise Dam Group, most active first.
Who controls this ground today
Today 9 live and pending tenements sit over the Sunrise Dam Group ground, held under 7 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Sunrise Dam Group
- Local government
- Shire of Leonora
- Commodities targeted
- Gold 5
- Work on record
- Diamond drilling 4 · Aircore drilling 3 · Portable XRF 3 · RC drilling 3 · Geotechnical logging 2 · Grab sampling 2 · Ground gravity surveys 2 · Rock chip sampling 2
- Resource declared
- Yes, in 1 report: A104898 (2015)
- Downloadable data
- 5 of 5 reports include a digital package
- Report types
- Annual 4 · Final Surrender 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A115940 | 2018 | Anglogold Ashanti Australia Limited | Sunrise Dam (C144/1995) Annual Report to the Department Mines and Petroleum For the Period 1 January 2017 to 3 |
| A112079 | 2017 | Anglogold Ashanti Australia Limited | Sunrise Dam Group (C144/1995) Annual Report to the DMP for the period 01/01/2016 to 31/12/2016 |
| A108112 | 2016 | Anglogold Ashanti Australia Limited | Annual Report for Sunrise Dam Group C144/1995 for the period 1 January 2015 to 31 December 2015 (M38/426, M38/ |
| A104898 | 2015 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group C144/1995 Combined Annual Report for the period 01/01/2014 to 31/12/2014, E38/2297....... P3 |
| A99226 | 2013 | Anglogold Ashanti Australia Ltd | Sunrise Dam Group Surrender Report for P39/5043 and P39/5044 for the period 01/04/2010 to 24/07/2013. |
Other projects in the Shire of Leonora
What does the exploration record say about Sunrise Dam Group?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.