Wilthorpe
Wilthorpe is a gold, copper and base metals exploration project in the Shire of Meekatharra, Western Australia. Its 32 WAMEX reports were lodged by 11 companies between 1996 and 2026, most recently Red Earth Minerals Limited in 2026. Of those, 4 declare a resource.
Who has explored here
Companies that lodged reports over Wilthorpe, most active first.
Who controls this ground today
Today 36 live and pending tenements sit over the Wilthorpe ground, held under 14 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Wilthorpe
- Local government
- Shire of Meekatharra
- Commodities targeted
- Gold 32 · Copper 10 · Base Metals 1
- Work on record
- RC drilling 7 · Rotary drilling 7 · Soil sampling 6 · Geophysical interpretation 4 · Mineral resource estimate 4 · Metallurgy 3 · Rock chip sampling 3 · Surface geochemistry 3
- Resource declared
- Yes, in 4 reports: A122930 (2020), A114011 (2017), A89548 (2011), A77385 (2008)
- Downloadable data
- 18 of 32 reports include a digital package
- Reports with no exploration
- 3 of 32 record no work done
- Report types
- Annual 25 · Final Surrender 4 · Partial Surrender 3
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A155044 | 2026 | Red Earth Minerals Limited | Partial surrender report for E52/4002 Wilthorpe for the period ending 11/06/2026. |
| A130357 | 2022 | Westgold Resources Limited | Partial Surrender Report Wilthorpe E52/2059 for the period ending 16/02/2022. |
| A127285 | 2021 | Resourceful Mining Group Pty Ltd | Final Surrender Report, E52/2627 Wilthorpe project for the period 26 November 2015 to 25 November 2020 |
| A126345 | 2021 | Kelro Pty Ltd | Final Surrender Report for Wilthorpe Project - E 52/3289 for the period 3 December 2015 to 20 November 2020 |
| A126069 | 2021 | Resourceful Mining Group Pty Ltd | Final Surrender Report, E52/3338 Wilthorpe Project for the period ending 17/11/2020 |
| A123310 | 2020 | Kelro Pty Ltd | Annual Report for Wilthorpe Project, E52/3289, 3 December 2018 to 2 December 2019 |
| A122930 | 2020 | Resourceful Mining Group Pty Ltd | Annual Technical Report, Wilthorpe Project: C259/2011 for the period 14 January 2019 to 13 January 2020 |
| A119811 | 2019 | Resourceful Mining Group Pty Ltd | Annual Report Wilthorpe Project C259/2011 for the period 14 January 2018 to 13 January 2019, E52/02627, E52/03 |
| A119636 | 2019 | Kelro Pty Ltd | Annual Report for Wilthorpe Project E52/03289 for the period 3 December 2017 to 2 December 2018 |
| A116913 | 2018 | Resourceful Mining Group Pty Ltd | Annual Report Wilthorpe Project C259/2011 For the Period 14 January 2017 to 13 January 2018, E52/02627, E52/03 |
| A115895 | 2018 | Kelro Pty Ltd | Annual Report for Wilthorpe Project E52/03289 for the period 3 December 2016 to 2 December 2017 |
| A114011 | 2017 | Resourceful Mining Group Pty Ltd | Annual Report Wilthorpe Project C259/2011 For the Period 14 January 2016 to 13 January 2017, E 52/02627, E 52/ |
| A112209 | 2017 | Kelro Pty Ltd | Annual Report for Wilthorpe Project E52/03289 for the period 03/12/2015 to 02/12/2016 |
| A109026 | 2016 | Resourceful Mining Group Pty Ltd | Annual Report Wilthorpe Project – C259/2011, E52/2627, M52/1067 and P52/1215 for the period 14 January 2015 to |
| A102098 | 2014 | Grosvenor Gold Pty Ltd | Wilthorpe Project E52/1832 Annual Technical Report for the period 16 March 2013 to 15 March 2014 |
| A98290 | 2013 | Grosvenor Gold Pty Ltd | Wilthorpe Project, Partial Surrender Report for the period 16th March 2009 to 15th March 2013, E52/1832. |
| A98289 | 2013 | Grosvenor Gold Pty Ltd | ANNUAL TECHNICAL REPORT FOR THE PERIOD ENDING 15 MARCH 2013 WILTHORPE TENEMENT NUMBER E52/1832 16th March 2012 |
| A89548 | 2011 | Meteoric Resources Nl | Annual Report, Wilthorpe Project, E52/2067, Meekatharra Shire, Western Australia, Reporting period 14 January |
| A77385 | 2008 | Meteoric Resources Nl | Wilthorpe Project Annual Report For the period 3 February 2007 to 2 February 2008 E 52/1453 |
| A74952 | 2007 | Meteoric Resources Nl | Wilthorpe Project E 52/1453, Peak Hill Mineral Field, WA, Annual Report For the Period 3 February 2006 to 2 Fe |
All 32 report numbers over Wilthorpe
Other projects in the Shire of Meekatharra
What does the exploration record say about Wilthorpe?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.