Gullewa
Gullewa is a gold, copper and iron ore exploration project in the Shire of Yalgoo, Western Australia. Its 64 WAMEX reports were lodged by 20 companies between 1974 and 2021, most recently Coventry Enterprises Pty Ltd in 2021. Of those, 9 declare a resource.
Who has explored here
Companies that lodged reports over Gullewa, most active first.
Who controls this ground today
Today 47 live and pending tenements sit over the Gullewa ground, held under 13 names.
- Which tenements sit over this ground, and who holds each
- The area they cover and when they expire
- The main holders here, by number of titles
- Whether that ground is meeting its expenditure commitments
- Dormant tenements and active forfeitures
- Mortgages, caveats and the expiry profile
Exploration record on Gullewa
- Local government
- Shire of Yalgoo
- Commodities targeted
- Gold 61 · Copper 25 · Base Metals 14 · Zinc 4 · Iron 4 · Lead 1 · Silver 1 · Kaolin 1
- Work on record
- RC drilling 26 · Diamond drilling 18 · Geological mapping 18 · Rock chip sampling 18 · Aerial magnetic surveys 14 · Soil sampling 14 · Geophysical interpretation 12 · Rotary drilling 10
- Resource declared
- Yes, in 9 reports: A101029 (2013), A96545 (2013), A92777 (2012), A74115 (2007), A71846 (2006), A69132 (2004) and 3 more
- Downloadable data
- 33 of 64 reports include a digital package
- Reports with no exploration
- 1 of 64 record no work done
- Report types
- Annual 42 · Non-statutory 11 · Partial Surrender 6 · Final Surrender 4 · Co-Funded Drilling 1
Exploration reports
| Report | Year | Operator | Title |
|---|---|---|---|
| A126263 | 2021 | Coventry Enterprises Pty Ltd | Annual Technical Report E59/2096 Gullewa Project for the period ending 06/01/2021 |
| A122828 | 2020 | Coventry Enterprises Pty Ltd | Annual Technical Report, Gullewa E59/2096, For the Period 6 January 2019 to 5 January 2020 |
| A119278 | 2019 | Coventry Enterprises Pty Ltd | Annual Technical Report E59/2096 Gullewa Project for the period 6 January 2018 to 5 January 2019 |
| A116348 | 2018 | Doray Minerals Limited | Annual Technical Report ending 31st December 2017 – Gullewa Project Group 2 Combined Report - C170/2017, E59/0 |
| A116263 | 2018 | Coventry Enterprises Pty Ltd | Annual Technical Report E59/2096 Gullewa Project for the period 06/01/2017 - 05/01/2018 |
| A114482 | 2017 | Doray Minerals Limited | DAG2016/00827515 (Round 13) - EIS Gearless Well Drill Program - Deflector Project |
| A113929 | 2017 | Deflector Mining Limited | Annual Technical Report for E59/1275 Gullewa Project For the Period 7 April 2016 to 6 April 2017 |
| A111929 | 2017 | Deflector Mining Limited | Gullewa Project Combined Report C15/1997 Annual Technical Report For the Period 1 January 2016 to 31 December |
| A108133 | 2016 | Doray Minerals Ltd | Gullewa Project Combined Annual Report - C15/1997, 1st January 2015 to 31st December 2015, E59/1240, E59/1241, |
| A106438 | 2015 | Doray Minerals Ltd | Surrender Report E59/1134 Gullewa Project for the period 11/01/2006 to 08/01/2015 |
| A104719 | 2015 | Mutiny Gold Ltd | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2014, E59/1134.....P59/1737 |
| A103423 | 2014 | Coventry Enterprises Pty Ltd | Annual Technical Report For the Period 21 June 2013 to 20 June 2014, Gullewa E59/1546 |
| A101029 | 2013 | Mutiny Gold Ltd | Gullewa Project, Annual Report for the period 01/01/2013 to 31/12/2013, E59/1134, 1240-1242 & 1274; M59/49, 68 |
| A99927 | 2013 | Gullewa Gold Project Pty Ltd | Partial Surrender Report for E59/1242 (Gullewa) for the period ended 9 July 2013 |
| A99926 | 2013 | Gullewa Gold Project Pty Ltd | Partial Surrender Report for Tenement E59/1241 (Gullewa) for the period ended 4 August 2013 |
| A99617 | 2013 | Coventry Enterprises Pty Ltd | Annual Technical Report for the period 21 June 2012 to 20 June 2013 Gullewa Project Exploration Licence E59/15 |
| A96545 | 2013 | Mutiny Gold Ltd | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2012, E59/1134.......P59/1737 |
| A94896 | 2012 | Minrex Resources Nl | Gullewa Project Annual Exploration Report E59/1657. 12/07/2011 – 11/07/2012 |
| A94623 | 2012 | Coventry Enterprises Pty Ltd | Gullewa Project E59/1546 Annual Report for the period 21 June 2011 – 20 June 2012 |
| A92777 | 2012 | Mutiny Gold Ltd | Gullewa Project C15/1997. Annual Technical Report for year ending 31 December 2011 |
All 64 report numbers over Gullewa
Other projects in the Shire of Yalgoo
What does the exploration record say about Gullewa?
NextMaps reads the WAMEX reports over a chosen area into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report. How the reports work.
Get the free report Open this ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.