Albion Resources
Albion Resources holds 14 Western Australian tenements covering 21,952 ha. It has lodged 9 open-file WAMEX reports between 2020 and 2025, mostly for copper, lead and zinc.
Who Albion Resources holds ground with
It holds 2 live titles together with another holder.
Holds ground with
See Albion Resources' whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Albion Resources holds today
Albion Resources holds 14 tenements across 21,952 ha. The register records 5 titles transferred in, the latest in July 2026.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Copper 9 · Lead 9 · Zinc 9 · Barite 8 · Fluorite 6 · Silver 3 · Base Metals 1 · Gold 1
- Where they worked
- Shire of Derby-West Kimberley 5, Shire of Halls Creek 4
- Also filed as
- Albion Resources · Albion Resources Limited
- Work on record
- Geological reconnaissance 3 · Diamond drilling 2 · Rock chip sampling 2 · Surface geochemistry 2 · Aerial magnetic surveys 1 · Aerial radioactivity surveys 1 · Wamex review 1
- Resource declared
- Never on this record
- Downloadable data
- 3 of 9 reports include a digital package
- Reports with no exploration
- 3 of 9 record no work done
- Report types
- Annual 7 · Final Surrender 2
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A149858 | 2025 | Pillara East | Pillara East Final Surrender Report E04/2637, E04/2672 for the period ending 31/08/2025. |
| A148118 | 2025 | Pillara East | Pillara East Annual Report C4/2021 for the period ending 31/03/2025. E 04/2637,E 04/2672 |
| A142916 | 2024 | Pillara East | Combined Annual Report C4/2021 Pillara East Project for the period ending 31/12/2023 |
| A138410 | 2024 | Sadler Ridge | Final Surrender Report for Sadler Ridge Project E80/5352 for the period ending 20/10/2023. |
| A134961 | 2023 | Pillara East | Pillara East Annual Technical Report C4/2021 for the period ending 31/12/2022. E04/02499,E04/02504,E04/02637,E |
| A129528 | 2022 | Pillara East | Pillara East Annual Technical Report |
| A127265 | 2021 | Pillara East | Pillara East C4/2021 Annual Technical Report for the period ending 30/12/2020 |
| A123881 | 2020 | Prices Hill | Prices Hill E04/02504 Annual Technical Report E04/02504 for the period 06/01/2020 |
| A123835 | 2020 | Virgin Hills | Virgin Hills Annual Technical Report E04/2499 for the period ending 12/3/2020 |
Named projects
Project names Albion Resources used in their reports, with the shire each sits in.
Watching what Albion Resources does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.