BHP Iron Ore (Jimblebar) Pty Ltd
BHP Iron Ore (Jimblebar) Pty Ltd holds 60 Western Australian tenements covering 60,470 ha. It is a subsidiary of BHP Group (ASX:BHP). It has lodged 9 open-file WAMEX reports between 2011 and 2015, mostly for iron ore.
Who owns BHP Iron Ore (Jimblebar)?
BHP Iron Ore (Jimblebar) is a subsidiary of BHP Group (ASX:BHP). The group is named as a holder on 761 live Western Australian tenements.
The other companies BHP Group holds ground through, with the live tenements each is named on:
From BHP Group's consolidated entity disclosure statement, as at 2026-06-30.
Who holds paper over BHP Group's ground?
BHP Iron Ore (Jimblebar) is part of the BHP Group group, so these are the group's connections.
26 of BHP Group's live titles carry a caveat or mortgage held by another party. BHP Group holds caveats or mortgages over 72 live titles of other companies. It holds 496 live titles together with another holder.
Caveats and mortgages over its ground
It holds caveats and mortgages over
and 3 more
Holds ground with
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What BHP Iron Ore (Jimblebar) holds today
BHP Iron Ore (Jimblebar) holds 60 tenements across 60,470 ha. The register records 44 titles transferred in, the latest in February 2014.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Iron 9
- Where they worked
- Shire of East Pilbara 9
- Work on record
- Flora 6 · Fauna 4 · Environmental impact surveys 2 · Heritage survey 2 · RC drilling 2 · Aboriginal site surveys 1 · Geological logging 1 · Geophysical logging 1
- Resource declared
- Never on this record
- Downloadable data
- 4 of 9 reports include a digital package
- Report types
- Annual 8 · Partial Surrender 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A106738 | 2015 | Dynasty | Partial Surrender Report for the period 14th March 2011 to 29th June 2015, Dynasty E52/2591 |
| A105217 | 2015 | Dynasty | Annual Report for the period 14th March 2014 to 13th March 2015, Dynasty E52/2591 |
| A104082 | 2014 | Shovelanna South | Shovelanna South E52/2238 Annual Report for the period 02th November 2013 to 1st November 2014 |
| A101740 | 2014 | Dynasty | Annual Report for the period 14th March 2013 to 13th March 2014, Dynasty E52/2591 |
| A100611 | 2013 | Western Ridge | Western Ridge E52/170, E52/2008 & ML52/901-906, 2013 Combined Annual Report C44/2013 Reporting Period 5th Dece |
| A98911 | 2013 | Dongardoo Well | Annual Report Dongardoo Well Project E52/1830 Reporting Period 22"d May 2012 to 21'1 May 2013 |
| A93753 | 2012 | Dongardoo Well | Annual report for the period 22nd May 2011 to 21st May 2012, Dongardoo E52/1830 |
| A90685 | 2011 | Western Ridge | Western Ridge Project E52/170 Reporting period:4th July 2010 to 3th July 2011 |
| A90601 | Dongardoo Well | Annual report for the period 22nd May 2010 to 21st May 2011, Dongardoo E52/1830 |
Named projects
Project names BHP Iron Ore (Jimblebar) Pty Ltd used in their reports, with the shire each sits in.
Watching what BHP Iron Ore (Jimblebar) Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.