Black Canyon Limited
Black Canyon Limited holds 25 Western Australian tenements covering 140,162 ha through 2 registered companies. It has lodged 20 open-file WAMEX reports between 2020 and 2026, mostly for manganese, copper and cobalt.
Companies Black Canyon holds ground through
Black Canyon (ASX:BCA) holds Western Australian ground through 2 registered companies, with the live tenements each is named on:
From Black Canyon's consolidated entity disclosure statement, as at 2025-06-30.
Who Black Canyon holds ground with
It holds 4 live titles together with another holder.
Holds ground with
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Black Canyon holds today
Black Canyon holds 25 tenements across 140,162 ha through its companies. The register records 11 titles transferred in, the latest in March 2024.
- Which tenements its companies hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Manganese 19 · Copper 2 · Cobalt 1 · Iron 1 · Tungsten 1 · Uranium 1
- Where they worked
- Shire of East Pilbara 18, Shire of Meekatharra 1, Shire of Upper Gascoyne 1
- Also filed as
- Black Canyon Limited · Black Canyon Pty. Ltd.
- Work on record
- Geophysical data processing 11 · Geological reconnaissance 6 · Wamex review 5 · Surface geochemistry 4 · Geological mapping 3 · Geophysical interpretation 3 · Rock chip sampling 3 · Aeromagnetic interpretation 2
- Resource declared
- Never on this record
- Downloadable data
- 14 of 20 reports include a digital package
- Reports with no exploration
- 5 of 20 record no work done
- Report types
- Annual 8 · Partial Surrender 6 · Final Surrender 4 · Co-Funded Drilling 1 · Co-Funded Geophysics 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A153255 | 2026 | Wandanya Project | E46_1407_EIS_2025_Final (R31) |
| A153174 | 2026 | Flanagans Bore | E46_1301 Flanagans Bore E46/1301 Partial Surrender Report for the period ending 19/09/2025 |
| A147958 | 2025 | Pickering Creek | E46_1404 Pickering Creek Project Partial Surrender Report for the period 11 April 2022 to 5 February 2025 |
| A147954 | 2025 | Balfour South | Balfour South E46/01396 Partial Surrender Report for the period 17 February 2022 to 5 February 2025 |
| A147952 | 2025 | Robin Bore | Robin Bore E46/01394 Partial Surrender for the period 17 February 2022 to 5 February 2025 |
| A147690 | 2025 | Davis North | E46/01406 Davis North Project Final Surrender Report for the period 19 July 2022 to 5 February 2025 |
| A147689 | 2025 | Billanooka | Billanooka E46/01488 Surrender Report for the period 4 July 2023 to 5 February 2025 |
| A145068 | 2024 | Fig Tree (V1) | EIS 2024 E46/1116 (Venture 1) |
| A143756 | 2024 | Davis North | E46/01406 Davis North Project Annual Report for the period ending 18/07/2024 |
| A143554 | 2024 | Billanooka | E46/1488 Billanooka Project Annual Report for the period ending 4 July 2023 to 3 July 2024 |
| A140745 | 2024 | Davis Creek | Partial Surrender E 46/1382 Davis Creek for the period 4 February 2022 to 3 April 2024 |
| A137093 | 2023 | Fig Tree | E46/01116 Fig Tree Partial Surrender Report 1 September 2017 to 31 August 2023 |
| A136256 | 2023 | Davis North | E46/1406 Davis North Project for the period ending 18/07/2023. |
| A135724 | 2023 | Braeside | E45_4958 Braeside Project Final SurrenderReport for the period 05/06/2018 to 04/06/2023 |
| A133146 | 2022 | Mount Lofty | Mt Lofty Project E52/3897 Surrender Report for the period ending 11/08/2022 |
| A131549 | 2022 | Oakover North Project | E45/4958_2022A Oakover North Project for the period ending 04/06/2022. |
| A130826 | 2022 | Oakover East | Oakover East Project E46_2145 Annual Report for the period ending 26/03/2022 |
| A130825 | 2022 | Oakover East | Oakover East Project E45_5145 Annual Report for the period ending 26/03/2022 |
| A128121 | 2021 | Braeside | Braeside (E45/4958) Annual Report for the period 5 June 2020 to 4 June 2021 |
| A123916 | 2020 | Ashburton | Annual Report for E09/2273 Ashburton project for the Period 10 January 2019 to 9 January 2020 |
Named projects
Project names Black Canyon Limited used in their reports, with the shire each sits in.
Watching what Black Canyon Limited does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.