Breaker Resources NL
Breaker Resources NL holds 10 Western Australian tenements covering 18,424 ha. It has lodged 87 open-file WAMEX reports between 2012 and 2023, mostly for gold, lithium and copper.
Whose ground Breaker Resources holds paper over
Breaker Resources holds caveats or mortgages over 1 live title of other companies.
It holds caveats and mortgages over
See Breaker Resources' whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Breaker Resources holds today
Breaker Resources holds 10 tenements across 18,424 ha. The register records 2 titles transferred in, the latest in September 2020.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Gold 87 · Lithium 3 · Copper 2 · Nickel 2 · Platinum Group Elements 2 · Base Metals 2 · Silver 1
- Where they worked
- Shire of Laverton 55, City of Kalgoorlie-Boulder 17, Shire of Menzies 8, Shire of Goomalling 5, Shire of Northam 2
- Work on record
- Auger drilling 37 · Soil sampling 30 · Aerial magnetic surveys 27 · Aircore drilling 25 · Geophysical interpretation 23 · Rock chip sampling 21 · Geological mapping 18 · Heritage survey 16
- Resource declared
- Yes, in 2 reports: A124723 (2020), A117242 (2018)
- Downloadable data
- 78 of 87 reports include a digital package
- Reports with no exploration
- 1 of 87 record no work done
- Report types
- Annual 44 · Final Surrender 20 · Partial Surrender 19 · Co-Funded Drilling 4
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A135051 | 2023 | Ularring Rock | Partial Surrender E70/4901 Ularring Rock for the period ending 16/3/2023 |
| A134826 | 2023 | Ularring | CO-FUNDED DRILLING REPORT DAG2022/00440466 (R24) |
| A130013 | 2022 | Lake Roe | Partial Surrender Report for E28/2556 Barling Project for the period ending 21/02/2022 |
| A129987 | 2022 | Lake Roe | Partial Surrender Report for Lake Roe Project E28/2555 for the period 22/06/2016 to 21/02/2022 |
| A129948 | 2022 | Lake Roe | Partial Surrender Report for Lake Roe Project E28/2551 for the period 04/02/2016 to 03/02/2022 |
| A127994 | 2021 | Lake Roe | Partial Surrender Report for Lake Roe Project E28/2515 For the Period 20 May 2016 to 19 June 2021 |
| A125396 | 2020 | Lake Roe | Lake Roe E28/2522 Annual Report foe the period ending 13/9/2020 |
| A124723 | 2020 | Lake Roe | Lake Roe Project (C46/2016) Annual Report for the period 20 May 2019 to 19 May 2020. E 28/02515,E 28/02551,E 2 |
| A124559 | 2020 | Lake Roe | Lake Roe Project Co-Funded Drilling Final Report (DAG2019/01562920), R19 |
| A124072 | 2020 | Ularring Rock | Ularring Rock (C106/2017) Annual Report for the period ending 16/03/2020 |
| A123311 | 2020 | Pinjin | E28/2629 Surrender Report Pinjin project for the period 18 January 2017 to 13 January 2020. |
| A122517 | 2020 | Dexter | Dexter Project (C60/2012) Final Surrender Report 2017, E 39/01611,E 39/01614,E 38/02695,E 38/02934 |
| A122256 | 2020 | Lake Roe | E28/2522 Annual Report 2019, Lake Roe Project, 14 September 2018 to 13 September 2019 |
| A120976 | 2019 | Attila West | E28/2530 Final Surrender Report for the period 22 July 2011 to 5 July 2017 |
| A120543 | 2019 | Lake Roe | Lake Roe Project (C46/2016) Annual Report for the period 20 May 2018 to 19 May 2019 E 28/02515,E 28/02551,E 28 |
| A120032 | 2019 | Ularring Rock | Ularring Rock Project (C106/2017) Annual Report for the period 17/03/2018 to 16/03/2019, E70/04686, E70/04901 |
| A119708 | 2019 | Pinjin | Pinjin E28/2629 Annual Report for the period 18 January 2018 to 17 January 2019 |
| A118325 | 2018 | Lake Roe | Lake Roe E28/2522 Annual Report for the period 14 September 2017 to 13 September 2018 |
| A117242 | 2018 | Lake Roe | Lake Roe Project (C46/2016) 2018 Annual Report for the period 20 May 2017 to 19 May 2018, E28/02515, E28/02551 |
| A116761 | 2018 | Ularring | Ularring Rock Project (C106/2017) Annual Report for the period 17 March 2017 to 16 March 2018, E70/04686, E70/ |
Report numbers filed by Breaker Resources NL
Named projects
Project names Breaker Resources NL used in their reports, with the shire each sits in.
Watching what Breaker Resources NL does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.