Byro Exploration Pty Ltd
Byro Exploration Pty Ltd holds 6 Western Australian tenements covering 30,736 ha. It has lodged 12 open-file WAMEX reports between 2012 and 2020, mostly for iron ore, copper and nickel.
Who Byro Exploration holds ground with
It holds 6 live titles together with another holder.
Holds ground with
See Byro Exploration's whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Byro Exploration holds today
Byro Exploration holds 6 tenements across 30,736 ha. The register records 4 titles transferred in, the latest in March 2011.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Iron 12 · Copper 10 · Nickel 10 · Platinum Group Elements 9 · Gold 7 · Base Metals 4 · Chromite 2 · Cobalt 2
- Where they worked
- Shire of Murchison 12
- Work on record
- Geological mapping 6 · RC drilling 6 · Rock chip sampling 6 · Metallurgy 4 · Flora 3 · Geological reconnaissance 3 · Surface geochemistry 3 · Diamond drilling 2
- Resource declared
- Yes, in 2 reports: A105176 (2015), A105174 (2015)
- Downloadable data
- 11 of 12 reports include a digital package
- Report types
- Annual 10 · Partial Surrender 2
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A123900 | 2020 | Byro North | Byro E09/1552 Voluntary Partial Surrender for the period ending 11/2/2020 |
| A123880 | 2020 | Byro North | Byro E09/1637 Partial Surrender Report for the period ending 11/2/2020 |
| A122749 | 2020 | Byro North | Byro North Annual Report for Grouped Tenements C51/2010 for the period 23 November 2018 to 22 November 2019 |
| A119271 | 2019 | Byro South | Byro South E09/01938, M09/168 [C48/2011] Annual Report for the period 23 November 2017 to 22 November 2018 |
| A119191 | 2019 | Byro North | Byro North Project C51/2010 Annual Report for the period 23 November 2017 to 22 February 2019, E09/01507, E09/ |
| A112195 | 2017 | Byro North | C51/2010 Byro North Project Annual Report for the period 23 November 2015 - 22 November 2016, E09/1507, E09/15 |
| A105176 | 2015 | Byro North | Byro North Project, Annual Report for the period 23/11/2013 to 22/11/2014, E09/1507, 1552, 1637 & 1638. [C51/2 |
| A105174 | 2015 | Byro South | Byro South Project, Annual Report for the period 23/11/2013 to 22/11/2014, E09/1781, 1508, 1656, 1657 & 1938. |
| A101115 | 2014 | Byro North | BYRO NORTH PROJECT 2013 ANNUAL REPORT REPORTING PERIOD: 23 November 2012 TO 22 November 2013 C51/2010 Byro Nor |
| A101114 | 2014 | Byro South | BYRO SOUTH PROJECT 2013 ANNUAL REPORT REPORTING PERIOD: 23 November 2012 TO 22 November 2013 C48/2011 Byro Sou |
| A96878 | 2013 | Byro South | Annual Report Byro South Project C48/2011 for the period 23 November 2011 to 22 November 2012, E09/1508, E09/1 |
| A96879 | 2012 | Byro North | Byro North Project 2012 Annual Report for the period 23 November 2011 to 22 November 2012, E09/1507, E09/1552, |
Named projects
Project names Byro Exploration Pty Ltd used in their reports, with the shire each sits in.
Watching what Byro Exploration Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.