Caspin Resources Limited
Caspin Resources Limited holds 7 Western Australian tenements covering 18,032 ha through 2 registered companies. It has lodged 7 open-file WAMEX reports between 2022 and 2026, mostly for copper, nickel and platinum group elements.
Companies Caspin Resources holds ground through
Caspin Resources (ASX:CPN) holds Western Australian ground through 2 registered companies, with the live tenements each is named on:
From Caspin Resources' consolidated entity disclosure statement, as at 2025-06-30.
What Caspin Resources holds today
Caspin Resources holds 7 tenements across 18,032 ha through its companies. The register records 2 titles transferred in, the latest in September 2021.
- Which tenements its companies hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Copper 6 · Nickel 6 · Platinum Group Elements 6 · Cobalt 4 · Lithium 3 · Palladium 1 · Platinum 1 · Base Metals 1
- Where they worked
- Shire of Victoria Plains 6, Shire of Chittering 1
- Work on record
- Soil sampling 5 · Surface geochemistry 5 · Aerial EM surveys 4 · Aerial gravity surveys 3 · Aerial magnetic surveys 3 · Diamond drilling 3 · Auger drilling 2 · Co-funded drilling 2
- Resource declared
- Never on this record
- Downloadable data
- 7 of 7 reports include a digital package
- Report types
- Partial Surrender 3 · Final Surrender 2 · Co-Funded Drilling 2
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A153894 | 2026 | Yarawindah Brook | Yarawindah Brook E70/5335 Final Surrender Report for the period ending 1/12/2025 |
| A148175 | 2025 | Yarawindah Brook | E70/5166 Partial Surrender Report - Yarawindah Brook Project for the period ending 31/01/2025. |
| A147636 | 2025 | Salvado | E 70/5374 Salvado Project Final Surrender Report for the period ending 28/11/2024 |
| A145180 | 2024 | Yarawindah Brook | E70/5116 Partial Surrender Report - Yarawindah Brook Project for the period 25/1/2018 to 30/08/2024 |
| A136292 | 2023 | Yarawindah Brook | Partial Surrender Report – E70/4883, Yarawindah Brook Project for the period ending 19/06/2023. |
| A135953 | 2023 | Yarawindah Brook | Yarawindah Brook - EIS R26 Co-Funded Drilling |
| A131954 | 2022 | Yarawindah Brook | Final Report - YAD0019 Yarawindah Brook Co-Funded drilling for the period ending 30/08/2022 (R23) |
Named projects
Project names Caspin Resources Limited used in their reports, with the shire each sits in.
Watching what Caspin Resources Limited does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.