Dalaroo Metals Ltd
Dalaroo Metals Ltd holds 8 Western Australian tenements covering 43,316 ha. It has lodged 8 open-file WAMEX reports between 2022 and 2025, mostly for copper, nickel and platinum group elements.
What Dalaroo Metals holds today
Dalaroo Metals holds 8 tenements across 43,316 ha. The register records 7 titles transferred in, the latest in February 2022.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Copper 7 · Nickel 5 · Platinum Group Elements 5 · Gold 3 · Lead 3 · Silver 3 · Zinc 3 · Lithium 2
- Where they worked
- Shire of Upper Gascoyne 3, Shire of Three Springs 3, Shire of Moora 2
- Work on record
- Co-funded drilling 4 · Surface geochemistry 4 · Diamond drilling 3 · Geophysical interpretation 3 · Gravity surveys 3 · Ground gravity surveys 3 · Rock chip sampling 3 · Soil sampling 3
- Resource declared
- Yes, in 1 report: A150038 (2025)
- Downloadable data
- 8 of 8 reports include a digital package
- Report types
- Annual 3 · Final Surrender 2 · Co-Funded Drilling 2 · Partial Surrender 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A152872 | 2025 | Lyons River | Surrender Report - Lyons River Project E09/2102 for the period ending 14/7/2025 |
| A150038 | 2025 | Namban | Namban Project - Surrender Report E70/4694, E70/4928, E70/5604, E70/5702 for the period ending 21/05/2025 |
| A149141 | 2025 | Lyons River | Partial Surrender Report - Lyons River Report Lyons River Project E09/2304, E09/2305 and E09/2312 For the Peri |
| A145274 | 2024 | Lyons River | Lyons River Browns Prospect (R27) |
| A138939 | 2024 | Three Springs | Annual Report on Three Springs E70/5502 for the period ending 30/11/2023. |
| A137055 | 2023 | Namban Project | Namban Project EIS co funding Round 26 DAG2022/00874977 Final Report |
| A133570 | 2023 | Three Springs | Annual Report on Three Springs E70/5502 for thge period ending 30/11/2022 |
| A129848 | 2022 | Three Springs | Annual Report on E70/5502 Three Springs for the period ending 30/11/2021 |
Named projects
Project names Dalaroo Metals Ltd used in their reports, with the shire each sits in.
Watching what Dalaroo Metals Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.