Eastern Goldfields Exploration Pty Ltd
Eastern Goldfields Exploration Pty Ltd holds 1 Western Australian tenement covering 6,272 ha. It has lodged 39 open-file WAMEX reports between 1998 and 2020, mostly for gold, base metals and copper.
What Eastern Goldfields Exploration holds today
Eastern Goldfields Exploration holds 1 tenement across 6,272 ha.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Gold 31 · Base Metals 11 · Copper 9 · Nickel 6 · Manganese 3 · Platinum Group Elements 2 · Rare Earth Elements 1 · Lead 1
- Where they worked
- Shire of Mount Magnet 19, Shire of Ashburton 6, Shire of Upper Gascoyne 4, Shire of Wiluna 4, Shire of Meekatharra 4, Shire of Murchison 2
- Also filed as
- Eastern Goldfields Exploration Pty Ltd · Eastern Goldfields Exploration
- Work on record
- Rock chip sampling 14 · Aerial magnetic surveys 11 · Geophysical interpretation 11 · Soil sampling 10 · Aerial radioactivity surveys 8 · Surface geochemistry 8 · Geological reconnaissance 7 · MMI technique 7
- Resource declared
- Never on this record
- Downloadable data
- 27 of 39 reports include a digital package
- Reports with no exploration
- 1 of 39 record no work done
- Report types
- Annual 35 · Co-Funded Drilling 2 · Final Surrender 2
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A122631 | 2020 | South Magnet | Annual Technical Report for C120/2016 South Magnet for the period 30 December 2018 to 29 December 2019 |
| A120285 | 2019 | Jumbulyer Hill | Jumbulyer Hill P58/1707 Annual Technical Report for the period 06/09/2016 - 05/09/2017 |
| A120263 | 2019 | Jumbulyer Hill | Jumbulyer Hill P58/1707 Annual Technical Report 06/09/2017 - 05/09/2018 |
| A120197 | 2019 | Briars | Briars P58/1738 Annual Technical Report 21/03/2018 to 20/03/2019 |
| A120135 | 2019 | Britannia Well | M58/229 Britannia Well Annual technical Report for the period 03/04/2018 to 02/04/2019 |
| A119783 | 2019 | Britannia South | Annual Technical Report Britannia South P58/01774 for the period 23/01/2018 - 22/01/2019 |
| A118734 | 2019 | Water Tank Hill | Water Tank Hill P58/1675 Annual Technical Report for the period 26 November 2017 to 25 November 2018 |
| A118690 | 2019 | Christmas Well | Christmas Well P58/1769 Annual Technical Report for the period 20 November 2017 to 19 November 2018 |
| A118688 | 2019 | Olden South | Olden South P58/1768 Annual Technical Report for the period 09/11/2017 - 08/11/2018 |
| A118662 | 2019 | Olden South East | Olden South East P58/1761 Annual Report for the period 9 November 2017 to 8 December 2018 |
| A118651 | 2019 | Christmas Well South West | Christmas Well South West P58/1753 Annual Report for the period 29 September 2017 to 28 September 2018 |
| A118649 | 2018 | South Magnet | Annual Technical Report for C120/2016 South Magnet for 30 December 2017 to 29 December 2018, P58/01694, E58/00 |
| A118636 | 2018 | Paleo 4 | Paleo 4 Project E58/524 Annual Technical Report for 16/10/2017 - 15/10/2018 |
| A118631 | 2018 | Jumbulyer | Jumbulyer NW P58/01725 Annual Report for the period ending 5 January 2019 |
| A118628 | 2018 | Jumbulyer | Annual Technical Report Jumbulyer P58/1725 for the period ending 5 Jan 2018 |
| A116515 | 2018 | Coolaloo Hill | Annual Technical Report for Coolaloo Bore E58/473 For the Period 26 August 2016 to 25 August 2017 |
| A116233 | 2018 | South Magnet | Annual Technical Report South Magnet C120/2016 For the Period 1 October 2016 to 30 September 2017, P58/01694, |
| A112521 | 2017 | South Magnet | Annual Report 2016 South Magnet C120/2016 For the Period 1 October 2015 to 30 September 2016, E59/2182, E59/21 |
| A112455 | 2017 | South Magnet | Annual Report 2016 South Magnet Project C120/2016 For the Period 1 October 2015 to 30 September 2016 |
| A101599 | 2014 | Maroonah | Maroonah Project E08/1386 Final Report - EIS Co-funded Drilling 2013 for the period 1st March 2013 to 28th Feb |
Report numbers filed by Eastern Goldfields Exploration Pty Ltd
Named projects
Project names Eastern Goldfields Exploration Pty Ltd used in their reports, with the shire each sits in.
Watching what Eastern Goldfields Exploration Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.