Encounter Operations Pty Ltd
Encounter Operations Pty Ltd holds 7 Western Australian tenements covering 30,772 ha. It is a subsidiary of Encounter Resources (ASX:ENR). It has lodged 19 open-file WAMEX reports between 2016 and 2026, mostly for copper, lead and zinc.
Who owns Encounter Operations?
Encounter Operations is a subsidiary of Encounter Resources (ASX:ENR). The group is named as a holder on 15 live Western Australian tenements.
The other companies Encounter Resources holds ground through, with the live tenements each is named on:
From Encounter Resources' consolidated entity disclosure statement, as at 2025-06-30.
Who holds paper over Encounter Resources' ground?
Encounter Operations is part of the Encounter Resources group, so these are the group's connections.
8 of Encounter Resources' live titles carry a caveat or mortgage held by another party.
Caveats and mortgages over its ground
See Encounter Resources' whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Encounter Operations holds today
Encounter Operations holds 7 tenements across 30,772 ha. The register records 6 titles transferred in, the latest in October 2012.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Copper 19 · Lead 11 · Zinc 11 · Cobalt 7 · Gold 6 · Silver 2 · Manganese 1
- Where they worked
- Shire of East Pilbara 19
- Work on record
- Surface geochemistry 9 · Rock chip sampling 8 · Aerial EM surveys 7 · RC drilling 6 · Diamond drilling 5 · Magnetotelluric 5 · Soil sampling 5 · Aircore drilling 4
- Resource declared
- Never on this record
- Downloadable data
- 14 of 19 reports include a digital package
- Reports with no exploration
- 5 of 19 record no work done
- Report types
- Annual 10 · Partial Surrender 7 · Final Surrender 2
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A154601 | 2026 | Yeneena | Yeneena E45/5333 Partial Surrender for the period ending 31/3/2026 |
| A154548 | 2026 | Yeneena | Yeneena E45/4861 Final Surrender Report for the period ending 30/03/2026 |
| A154547 | 2026 | Yeneena Northwest | Yeneena Northwest E45/5334 Final Surrender Report for the period ending 29/03/2026. |
| A154349 | 2026 | Yeneena E45/5379 | Yeneena E45/5379 Partial Surrender Report for the period ending 11/03/2026. |
| A150104 | 2025 | Yeneena E45/2500 Partial Surrender | Yeneena E45/2500 Partial Surrender for the period ending 13/06/2025. |
| A150103 | 2025 | Yeneena E45/2502 Partial Surrender | Yeneena E45/2502 Partial Surrender for the period ending 13/06/2025. |
| A123240 | 2020 | PATERSON | Yeneena Combined Annual Report, Paterson Project, C293/2011, 1 January 2019 to 31 December 2019 |
| A122587 | 2020 | Sussex | Sussex Annual Report E45/4758 for the period 18 December 2018 to 19 December 2019 |
| A122583 | 2020 | Sussex | Sussex Annual Report E45/4757 for the period 19 December 2018 to 18 December 2019 |
| A119521 | 2019 | Paterson | C293/2011 Yeneena Combined Annual Report for the period 1 January 2018 to 31 December 2018, E45/02500, E45/025 |
| A119051 | 2019 | Sussex | Sussex Annual Report E45/4758 For the Period 19 December 2017 to 18 December 2018 |
| A119050 | 2019 | Sussex | Sussex Annual Report E45/4757 for the period 19 December 2017 to 18 December 2018 |
| A117852 | 2018 | Paterson | C293/2011 Paterson Project E45/2657, E45/2658, E45/2805 & E45/2806 Partial Surrender Report for the period 9 |
| A117405 | 2018 | Paterson | Paterson Project C293/2011 Partial Surrender Report E45/2500, E45/2501, E45/2502, E45/2561 for the period 15 J |
| A116340 | 2018 | Paterson | C293/2011 Yeneena Combined Annual Report for the period 1 January 2017 to 31 December 2017, E45/02500, E45/025 |
| A115896 | 2018 | Sussex | Sussex E45/04758 Annual Report for the period 19 December 2016 to 18 December 2017 |
| A115894 | 2018 | Sussex | Sussex E45/04757 Annual Report for the period 19 December 2016 to 18 December 2017 |
| A112445 | 2017 | Paterson | Paterson Project C293/2011 (Previously C103-2005) Combined Annual Report for the period 01/01/2016 to 31/12/20 |
| A109558 | 2016 | Paterson | Paterson Project Partial Surrender Report for the period 15 June 2005 to 10th June 2016, for tenements E45/250 |
Named projects
Project names Encounter Operations Pty Ltd used in their reports, with the shire each sits in.
Watching what Encounter Operations Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.