Estrella Resources Limited
Estrella Resources Limited holds 11 Western Australian tenements covering 16,207 ha through 2 registered companies. It has lodged 8 open-file WAMEX reports between 2018 and 2024, mostly for nickel, copper and gold.
Companies Estrella Resources holds ground through
Estrella Resources (ASX:ESR) holds Western Australian ground through 2 registered companies, with the live tenements each is named on:
From Estrella Resources' consolidated entity disclosure statement, as at 2025-06-30.
Whose ground Estrella Resources holds paper over
Estrella Resources holds caveats or mortgages over 18 live titles of other companies.
It holds caveats and mortgages over
See Estrella Resources' whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Estrella Resources holds today
Estrella Resources holds 11 tenements across 16,207 ha through its companies. The register records 10 titles transferred in, the latest in July 2025.
- Which tenements its companies hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Nickel 8 · Copper 5 · Gold 4 · Lithium 2 · Cobalt 2 · Cesium 1 · Platinum 1 · Tantalum 1
- Where they worked
- Shire of Menzies 5, Shire of Coolgardie 3
- Work on record
- RC drilling 4 · EM logging 3 · Diamond drilling 2 · Geophysical logging 2 · Ground EM surveys 2 · Mineral resource estimate 2 · Petrography 2 · Rock chip sampling 2
- Resource declared
- Yes, in 2 reports: A125565 (2020), A120160 (2019)
- Downloadable data
- 8 of 8 reports include a digital package
- Reports with no exploration
- 1 of 8 record no work done
- Report types
- Annual 5 · Partial Surrender 2 · Co-Funded Drilling 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A142991 | 2024 | Carr Boyd | Carr Boyd Project Partial Surrender Report E31/1162, 26 March 2018 to 27 February 2024 |
| A134111 | 2023 | CARR BOYD | Partial Surrender Report E31/1124 Carr Boyd Project for the period ending 22/12/2022. |
| A125565 | 2020 | Kambalda West | Kambalda West Combined Annual Technical Report C443/1996 for the period 11 August 2019 to 10 August 2020, M 15 |
| A123565 | 2020 | Carr Boyd | Annual Report for the Carr Boyd Project, C434/1995 (E29/982, E29/1012, E31/726, E31/1124, E31/1162, M31/12, M3 |
| A121296 | 2019 | Widgiemooltha North | Widgiemooltha North Project C19/2002 Combined Annual Technical Report for the period 1 July 2018 to 30 June 20 |
| A121252 | 2019 | Kambalda West | Kambalda West Combined Annual Technical Report No. C443/1996 for the period 11 August 2018 to 10 August 2019. |
| A120160 | 2019 | Carr Boyd | Annual Report for the Carr Boyd Project, C434/1995 (E29/982, E29/1012, E31/726, E31/1124, E31/1162, M31/12, M3 |
| A118088 | 2018 | Carr Boyd | Round 14 EIS Co-funded Drilling Final Report for the Carr Boyd Deep Drilling Project, E29/982 |
Named projects
Project names Estrella Resources Limited used in their reports, with the shire each sits in.
Watching what Estrella Resources Limited does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.