Fi Joint Venture Pty Ltd
Fi Joint Venture Pty Ltd holds 33 Western Australian tenements covering 30,309 ha. It has lodged 7 open-file WAMEX reports between 2018 and 2023, mostly for iron ore.
Who holds paper over Fi Joint Venture's ground?
3 of Fi Joint Venture's live titles carry a caveat or mortgage held by another party. It holds 3 live titles together with another holder.
Caveats and mortgages over its ground
Holds ground with
See Fi Joint Venture's whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Fi Joint Venture holds today
Fi Joint Venture holds 33 tenements across 30,309 ha. The register records 8 titles transferred in, the latest in July 2023.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Iron 7
- Where they worked
- Shire of Yalgoo 7
- Also filed as
- Fi Joint Venture Pty. Ltd. · Fi Joint Venture Pty Ltd
- Work on record
- Hydrogeology 5 · Feasibility studies 3 · Flora 2 · Geological reconnaissance 2 · Water bore drilling 2 · 3D geological modelling 1 · Aerial lidar surveys 1 · Diamond drilling 1
- Resource declared
- Yes, in 1 report: A115643 (2018)
- Downloadable data
- 7 of 7 reports include a digital package
- Reports with no exploration
- 1 of 7 record no work done
- Report types
- Annual 6 · Partial Surrender 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A135816 | 2023 | Yogi | Partial Surrender Report for Exploration Licence E59/2196 Yogi Project for the period ending 15/03/2023 |
| A125518 | 2020 | Bilberatha | Annual Report for C114/2020 Bilberatha Project for the period ending 05/10/2020, E59/02227, E59/02400, P59/022 |
| A122577 | 2020 | Yogi | Annual Report for C47/1999 'Yogi Mine' for the period ended 31/12/2019, M59/00637, M59/00740, P59/02133, E59/0 |
| A122045 | 2019 | Yalgoo | Annual Report for Yalgoo E59/2227 for the period 6 October 2018 to 5 October 2019 |
| A118669 | 2019 | Yogi | Annual Report for C47/1999 "Yogi" for the period 1 January 2018 to 31 December 2018, M59/00637, M59/00740, P59 |
| A118298 | 2018 | Yalgoo | Annual Report for E59/2227 Yalgoo Project for the period 6 October 2017 to 5 October 2018 |
| A115643 | 2018 | Yogi | Yogi Mine Project C47/1999 Annual Report for the period 1 January 2017 to 31 December 2017, M59/00637, M59/007 |
Named projects
Project names Fi Joint Venture Pty Ltd used in their reports, with the shire each sits in.
Watching what Fi Joint Venture Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.