Galan Lithium Limited
Galan Lithium Limited holds 8 Western Australian tenements covering 17,049 ha. It has lodged 11 open-file WAMEX reports between 2022 and 2026, mostly for lithium, tantalum and tin.
What Galan Lithium holds today
Galan Lithium holds 8 tenements across 17,049 ha. The register records 15 titles transferred in, the latest in May 2026.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Lithium 11 · Tantalum 8 · Tin 8 · Gold 4
- Where they worked
- Shire of Donnybrook-Balingup 10, Shire of Bridgetown-Greenbushes 1
- Work on record
- Aerial magnetic surveys 6 · Aerial geophysical surveys 4 · Geophysical data processing 4 · Geophysical interpretation 4 · Rock chip sampling 4 · Soil sampling 4 · Surface geochemistry 4 · Aerial radioactivity surveys 2
- Resource declared
- Never on this record
- Downloadable data
- 7 of 11 reports include a digital package
- Report types
- Annual 7 · Final Surrender 3 · Partial Surrender 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A155418 | 2026 | Kirup | Galan Lithium Limited Final Surrender Report for E70/5680 Kirup for the period ending 09/05/2026. |
| A155414 | 2026 | Kirup | Galan Lithium Limited Final Surrender Report for E70/4777 Kirup for the period ending 05/05/2026. |
| A153275 | 2026 | Kirup | Surrender Report E70/4690 Kirup Project for the period ending 29/11/2025 |
| A150409 | 2025 | Kirup | Annual Report for Kirup Project C45/2023 for the period ending 20/07/2025. E 70/4690,E 70/4777,E 70/5680 |
| A145149 | 2024 | Kirup | Combined Annual Report Kirup C45/2023 for the period ending 20 July 2024 |
| A137485 | 2023 | Kirup | Combined Annual report for Kirup Project, E70/4777, E70/4690, E70/5680the period ending 20/07/2023. C45/2023 |
| A133653 | 2023 | Kirup | Annual Report for E70/4690 Kirup Project for the period ending 28/01/2023 |
| A132183 | 2022 | Greenbushes South | Partial Surrender Report - E70/4790 Greenbushes South for the period ending 28/06/2022 |
| A131334 | 2022 | Kirup | Galan Lithium Limited Annual Report for E70/5680 for the period ending 09/07/2022. |
| A131315 | 2022 | Kirup | Galan Lithium Limited Annual report for E70/4777 Kirup Project for the period ending 04/07/2022. |
| A129374 | 2022 | Kirup | Annual report for E70/4690 Kirup for the period 28 January 2021 to 28 January 2022 |
Named projects
Project names Galan Lithium Limited used in their reports, with the shire each sits in.
Watching what Galan Lithium Limited does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.