Gateway Projects WA Pty Ltd
Gateway Projects WA Pty Ltd holds 4 Western Australian tenements covering 17,248 ha. It is a subsidiary of Gateway Mining (ASX:GML). It has lodged 4 open-file WAMEX reports between 2020 and 2022, mostly for gold.
Who owns Gateway Projects WA?
Gateway Projects WA is a subsidiary of Gateway Mining (ASX:GML). The group is named as a holder on 20 live Western Australian tenements.
The other companies Gateway Mining holds ground through, with the live tenements each is named on:
From Gateway Mining's consolidated entity disclosure statement, as at 2025-06-30.
Who holds paper over Gateway Mining's ground?
Gateway Projects WA is part of the Gateway Mining group, so these are the group's connections.
2 of Gateway Mining's live titles carry a caveat or mortgage held by another party. Gateway Mining holds caveats or mortgages over 32 live titles of other companies. It holds 8 live titles together with another holder.
Caveats and mortgages over its ground
It holds caveats and mortgages over
Holds ground with
See Gateway Mining's whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Gateway Projects WA holds today
Gateway Projects WA holds 4 tenements across 17,248 ha. The register records 4 titles transferred in and 2 transferred out, the latest in August 2020.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Gold 4
- Where they worked
- Shire of Menzies 3, Shire of Yilgarn 1
- Work on record
- Geological mapping 2 · Geological reconnaissance 2 · Aerial magnetic surveys 1 · Aircore drilling 1 · Geophysical data processing 1 · Geophysical interpretation 1 · Soil sampling 1 · Surface geochemistry 1
- Resource declared
- Never on this record
- Downloadable data
- 3 of 4 reports include a digital package
- Reports with no exploration
- 1 of 4 record no work done
- Report types
- Partial Surrender 2 · Annual 2
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A129600 | 2022 | Edjudina | Partial Surrender Report for E39/1882 Edjudina (as of 18/01/2022) |
| A123649 | 2020 | Ennuin | Ennuin E77/2309 Annual Report for the period ending 19/1/2020 |
| A123499 | 2020 | Edjudina | Partial Surrender E39/1765, Edjudina Project, 20 March 2014 to 19 March 2020 |
| A122219 | 2020 | Edjudina | E 31/1134 - Edjudina Project Annual Report, 8 November 2018 to 7 November 2019 |
Named projects
Project names Gateway Projects WA Pty Ltd used in their reports, with the shire each sits in.
Watching what Gateway Projects WA Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.