Hastings Technology Metals Ltd
Hastings Technology Metals Ltd holds 82 Western Australian tenements covering 65,244 ha through 5 registered companies. It has lodged 15 open-file WAMEX reports between 2015 and 2023, mostly for rare earth elements.
Companies Hastings Technology Metals holds ground through
Hastings Technology Metals (ASX:HAS) holds Western Australian ground through 5 registered companies, with the live tenements each is named on:
From Hastings Technology Metals' consolidated entity disclosure statement, as at 2025-06-30.
Who Hastings Technology Metals holds ground with
It holds 70 live titles together with another holder.
Holds ground with
See Hastings Technology Metals' whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Hastings Technology Metals holds today
Hastings Technology Metals holds 82 tenements across 65,244 ha through its companies. The register records at least 52 titles transferred in and 8 transferred out, the latest in March 2026.
- Which tenements its companies hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Rare Earth Elements 15
- Where they worked
- Shire of Upper Gascoyne 11, Shire of Halls Creek 4
- Also filed as
- Hastings Technology Metals · Hastings Technology Metals Ltd
- Work on record
- RC drilling 8 · Mineral resource estimate 6 · Rock chip sampling 6 · Aerial magnetic surveys 5 · Petrography 5 · Aerial radioactivity surveys 4 · Diamond drilling 4 · Surface geochemistry 4
- Resource declared
- Yes, in 6 reports: A122818 (2020), A118927 (2019), A115877 (2018), A112044 (2017), A108577 (2016), A107803 (2016)
- Downloadable data
- 12 of 15 reports include a digital package
- Reports with no exploration
- 1 of 15 record no work done
- Report types
- Annual 7 · Final Surrender 4 · Partial Surrender 3 · Co-Funded Drilling 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A136199 | 2023 | Brockman | Final Surrender Report for Brockman Project - P80/1627, P80/1631, P80/1632, P80/1633, P80/1634, P80/1635 for t |
| A122818 | 2020 | Yangibana | Yangibana Rare Earths Project Annual Combined Group Report C265/2008 for the period ending 30/11/2019 |
| A119861 | 2019 | Yangibana | Co Funded Drilling Report (R#18) Yangibana Project E09/02018 [CRG #: 265/2008] For the Period 1 January 2019 t |
| A118927 | 2019 | Yangibana | Yangibana Rare Earth's Project C265/2008 Annual Report for the period 1 December 2017 to 30 November 2018 |
| A116489 | 2018 | Brockman | Final Surrender Report - E80/4555 Brockman For the Period 18 September 2012 to 21 February 2018 |
| A115877 | 2018 | Yangibana | C265/2008 Yangibana Project Combined Group Report Annual Combined Exploration Report for the period 1 December |
| A114242 | 2017 | Yangibana | Partial Surrender Report - E09/1700 Yangibana Project For the Period 20 May 2011 to 19 May 2017 |
| A114062 | 2017 | Brockman | Brockman Project C63/2009 Annual Report for the period 20 March 2016 to 19 March 2017, E80/04555, P80/01626, P |
| A113893 | 2017 | Yangibana | Partial Surrender Report - E09/1706 For the Period 1 April 2011 to 31 March 2017 |
| A113888 | 2017 | Yangibana | Partial Surrender Report - E09/1703 Yangibana Project for the period 1 April 2011 to 31 March 2017 |
| A112044 | 2017 | Yangibana | Yangibana Project C265/2008 Combined Group Report for the period 1 December 2015 to 30 November 2016, E09/1043 |
| A108577 | 2016 | Brockman | Brockman Project C63/2009 Annual Report for the period 20 March 2015 to 19 March 2016, E 80/04555, P80/01626, |
| A107803 | 2016 | Yangibana | Combined Group Report C265/2008 for the Period 1st December 2014 to the 30th November 2015, Yangibana Project |
| A107134 | 2015 | Yangibana Project - Yangibana South | Final Surrender Report for the Period 7th October 2014 to the 7th September 2015, P09/481, Yangibana South |
| A107133 | 2015 | Yangibana Project - Yangibana South | Final Surrender Report for the Period 7th October 2014 to the 7th September 2015,P09/480, Yangibana |
Named projects
Project names Hastings Technology Metals Ltd used in their reports, with the shire each sits in.
Watching what Hastings Technology Metals Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.