Iluka Resources Ltd
Iluka Resources Ltd holds 125 Western Australian tenements covering 137,307 ha through 8 registered companies. It has lodged 453 open-file WAMEX reports between 1999 and 2026, mostly for mineral sands, rutile and zircon.
Companies Iluka Resources holds ground through
Iluka Resources (ASX:ILU) holds Western Australian ground through 8 registered companies, with the live tenements each is named on:
From Iluka Resources' consolidated entity disclosure statement, as at 2025-12-31.
Who holds paper over Iluka Resources' ground?
2 of Iluka Resources' live titles carry a caveat or mortgage held by another party. Iluka Resources holds caveats or mortgages over 41 live titles of other companies.
Caveats and mortgages over its ground
Also a private individual, over 1 title.
It holds caveats and mortgages over
See Iluka Resources' whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Iluka Resources holds today
Iluka Resources holds 125 tenements across 137,307 ha through its companies. The register records 55 titles transferred in, the latest in February 2013.
- Which tenements its companies hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Mineral Sands 443 · Rutile 7 · Zircon 7 · Ilmenite 6 · Limesand 6 · Gold 4 · Rare Earth Elements 3 · Nickel 2
- Where they worked
- Shire of Capel 101, Shire of Dandaragan 51, City of Busselton 39, Shire of Carnamah 35, Shire of Gingin 31, Shire of Murray 27, Shire of Broome 23, Shire of Laverton 20, Shire of Waroona 15, Shire of Three Springs 13
- Also filed as
- Iluka Resources Limited · Iluka Resources Ltd
- Work on record
- RC drilling 206 · Heavy minerals (%) 109 · Slimes (%) 95 · Oversize (%) 93 · Aircore drilling 92 · Mineral resource estimate 88 · Bulk sampling 68 · Heavy minerals 58
- Resource declared
- Yes, in 88 reports: A132067 (2022), A125041 (2020), A116970 (2018), A115039 (2017), A115037 (2017), A110758 (2017) and 82 more
- Downloadable data
- 304 of 453 reports include a digital package
- Reports with no exploration
- 20 of 453 record no work done
- Report types
- Annual 293 · Final Surrender 97 · Partial Surrender 51 · Non-statutory 10 · Core Library Drilling 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A155380 | 2026 | Cataby | E70/5636 Partial Surrender Report Cataby for the period ending 05/06/2026. |
| A155379 | 2026 | Cataby | E70/5635 Partial Surrender Report Cataby for the period ending 05/06/2026, C107/2002. |
| A153139 | 2026 | Colville | Final Surrender Report for E69/3826 Colville for the period ending 02/12/2025. |
| A150621 | 2025 | Colville | Combined Annual Technical Report for the Colville C297/2024 Project E69/3826. |
| A150243 | 2025 | Mount Junction Project | U-Pb Dating of Detrital Zircon from Quartz Arenite in Core Library Drillhole BR0006 |
| A149692 | 2025 | Colville Basin | Colville Basin E69/4119 Final Technical Report for the period ending 10/07/2025 |
| A145715 | 2024 | Colville | Final Technical Report for the Colville Project C85/2022, E69/3827 & E69/3828, for the period ending 23/10/202 |
| A144143 | 2024 | Colville Basin | 2024 Annual Technical Report for Colville Basin E69/4119 for the period ending 12/08/2024 |
| A142797 | 2024 | Colville | Annual Technical Report for the Colville Project C85/2022 for the period ending 09/03/2024 |
| A135133 | 2023 | Colville | Combined Annual Technical Report for the Colville C85/2022 Project for the period ending 09/03/2023. |
| A132068 | 2022 | Capel - Yoganup | M70/1106 Yoganup Extended Final Surrender Report 19 September 2001 to 18 August 2022 |
| A132067 | 2022 | Waroona | Final Surrender Report for M70/1089 (Waroona) for the period 29/09/2001 to 18/08/2022 |
| A125041 | 2020 | Pinjarra | 2020 Annual Technical Report for the Pinjarra Project C106/2002 Combined Reporting Group for the period ending |
| A124945 | 2020 | Eneabba | Eneabba C109/2002 Combined Reporting Group – 2020 Annual Technical Report for the period ending 31 August 2020 |
| A124127 | 2020 | Capel | Capel C105/2002 Combined Reporting Group - Annual Technical Report for the period ending 30/04/2020 |
| A123432 | 2020 | Barlee | Barlee E70/5200 - Annual Technical Report for the period ending 25 February 2020 |
| A123373 | 2020 | Cataby | Cataby C107/2002 Combined Reporting Group - Annual Technical Report 1 March 2019 to 29 February 2020 |
| A121402 | 2019 | Eneabba | Eneabba C109/2002 Combined Reporting Group – 2019 Annual Technical Report for the period 1 September 2018 to 3 |
| A121398 | 2019 | Pinjarra | 2019 Annual Technical Report for the Pinjarra Project C106/2002 For the Period 1 September 2018 to 31 August 2 |
| A120344 | 2019 | Capel | Capel Project C105/2002 Combined Reporting Group - Annual Technical Report for the period 01/05/2018 to 30/04/ |
Report numbers filed by Iluka Resources Ltd
Named projects
Project names Iluka Resources Ltd used in their reports, with the shire each sits in.
Watching what Iluka Resources Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.