Kaili Gold Pty Ltd
Kaili Gold Pty Ltd holds no tenure on the current Western Australian register. It has lodged 36 open-file WAMEX reports between 2017 and 2025, mostly for gold, iron ore and rare earth elements.
Exploration record
- Commodities targeted
- Gold 36 · Iron 7 · Rare Earth Elements 1 · Base Metals 1
- Where they worked
- Shire of Menzies 23, City of Kalgoorlie-Boulder 13
- Also filed as
- Kaili Gold Pty Ltd · Kaili Gold
- Work on record
- Soil sampling 19 · Surface geochemistry 17 · Rock chip sampling 15 · Geophysical interpretation 12 · RC drilling 8 · Portable XRF 7 · Aircore drilling 6 · Vacuum drilling 6
- Resource declared
- Never on this record
- Downloadable data
- 35 of 36 reports include a digital package
- Reports with no exploration
- 5 of 36 record no work done
- Report types
- Annual 26 · Final Surrender 5 · Partial Surrender 4 · Co-Funded Drilling 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A148794 | 2025 | Gindalbie | Final Technical Report Holey Dam E27/550 North Coolgardie Mineral Field/Yerilla District |
| A145730 | 2024 | Canegrass - Gindalbie | 2024 Final Report Canegrass (Gindalbie) for the period 30/05/2016 to 28/10/2024 |
| A144245 | 2024 | Gindalbie | 8th Annual C92/2019 Combined Annual Report Holey Dam and Canegrass for the period ending 30/06/2024 |
| A136353 | 2023 | Gindalbie | Gindalbie Project Sixth Annual Technical Report Third Annual Combined Report Holey Dam E27/550 Canegrass 3 |
| A136066 | 2023 | Gindalbie | Seventh 7th Annual Technical Report Canegrass Project E31/1113 for the period ending 29/05/2023 |
| A131902 | 2022 | Gindalbie | Combined Annual Report No: E27/550 and E31/1113 Gindalbie Project for the period ending 30/06/2022.(C92/2019) |
| A129130 | 2021 | Jungle Hill | Jungle Hill Final Surrender Report E31/01114 for the period 30 May 2016 to 29 October 2021 |
| A128986 | 2021 | Eight Mile Bore | EL 40/354 Final Surrender Report Eight Mile Bore Project for the period 8 July 2016 to 8 July 2021 |
| A127833 | 2021 | Canegrass | Canegrass E31/1113 Partial Surrender Report for the period 30 May 2016 to 30 May 2021 |
| A127822 | 2021 | Holey Dam | EL 27/550 Partial Surrender Report Holey Dam project for the period 1 July 2016 to 1 July 2021 |
| A127819 | 2021 | Eight Mile Bore | EL 40/354 Partial Surrender Report Eight Mile Bore for the period 8 July 2016 to 8 July 2021 |
| A127809 | 2021 | Jungle Hill | EL 31/1115 Jungle Hill Partial Surrender Report for the period 30 May 2016 to 30 May 2021 |
| A127807 | 2021 | Gindalbie Dam | EL 27/549 Gindalbie Dam Final Report 1st July 2016 to 30th June 2021 |
| A127806 | 2021 | Eight Mile Bore | EL 40/354 5th Annual Technical Report, Eight Mile Bore project for the period 8 July 2020 to 8 July 2021 |
| A127805 | 2021 | Holey and Gindalbie Dams | EL27/549 Gindalbie Dam and EL27/550 Combined Report 2021 |
| A127803 | 2021 | Canegrass | EL 31/1113 5th Annual Technical Report, Canegrass project for the period 30 May 2020 to 30 May 2021. |
| A127802 | 2021 | Jungle Hill | EL 31/1114 Jungle Hill project, 5th Annual Technical Report for the period 30 May 2020 to 29 May 2021 |
| A124897 | 2020 | Eight Mile Bore | E40/354 Fourth Annual Technical Report for the period ending 7 July 2020 |
| A124481 | 2020 | Jungle Hill | Fourth Annual Jungle Hill Project E31/1114for the period ending 29/05/2020 |
| A124479 | 2020 | Canegrass | Fourth Annual Report Canegrass project E31/1113 for the period 30 May 2019 to 29 May 2020 |
Report numbers filed by Kaili Gold Pty Ltd
Named projects
Project names Kaili Gold Pty Ltd used in their reports, with the shire each sits in.
Watching what Kaili Gold Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See where they worked on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.