Karara Mining Ltd
Karara Mining Ltd holds 52 Western Australian tenements covering 120,232 ha. It has lodged 21 open-file WAMEX reports between 2008 and 2020, mostly for iron ore, base metals and gold.
Who holds paper over Karara Mining's ground?
48 of Karara Mining's live titles carry a caveat or mortgage held by another party.
Caveats and mortgages over its ground
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Karara Mining holds today
Karara Mining holds 52 tenements across 120,232 ha. The register records 9 titles transferred in, the latest in June 2018.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Iron 20 · Base Metals 3 · Gold 3 · Silver 3 · Water 1
- Where they worked
- Shire of Perenjori 17, Shire of Yalgoo 4
- Also filed as
- Karara Mining Limited · Karara Mining Ltd
- Work on record
- RC drilling 9 · Rock chip sampling 9 · Geophysical interpretation 7 · Water bore drilling 6 · Geological mapping 4 · Geological reconnaissance 4 · Multielement analysis 4 · Aerial magnetic surveys 3
- Resource declared
- Yes, in 3 reports: A87070 (2010), A82655 (2009), A78825 (2008)
- Downloadable data
- 13 of 21 reports include a digital package
- Reports with no exploration
- 1 of 21 record no work done
- Report types
- Annual 15 · Final Surrender 4 · Partial Surrender 2
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A123937 | 2020 | Karara | Karara Annual Technical Report C82/2007 for the period ending 30/4/2020 |
| A120282 | 2019 | Karara | Karara Iron Ore Project C82/2007 Annual Technical Report for the period 01/05/2018 to 30/04/2019 |
| A117055 | 2018 | Karara | Karara Iron Ore Project C82/2007 Annual Report for the period 01/05/2017 - 30/04/2018, E59/00817, E59/01068, E |
| A114142 | 2017 | Karara | Karara Iron Project - Combined Reporting C82/2007 For the Period 1 July 2016 to 30 June 2017, M59/00644, M59/0 |
| A109238 | 2016 | Karara | KARARA IRON PROJECT Combined Reporting Group No: C82/2007 Annual Report to the Department of Mines and Petrole |
| A101485 | 2014 | Final Surrender Report E59/1138 for the period 28/10/2005 and 25/02/2014 | |
| A98770 | 2013 | Windine Hill | Windine Hill Project, Final Surrender Report for the period 15/07/2008 to 27/06/2013, E59/1406. |
| A97700 | 2013 | Final Surrender Report E59/1472 for the period 16/12/2008 to 22/02/2013 | |
| A94032 | 2012 | Karara | Karara Project C82/2007 Annual Report for the period 01/05/11 to 30/04/12. |
| A90773 | 2011 | Karara | Karara Iron Project C82/2007, Annual Report to the Department of Mines and Petroleum for the period 01/05/10 t |
| A89062 | 2011 | Karara | Karara Iron Ore Project, Partial Surrender Report for the period 15/07/2008 to 02/12/2010, E59/1406 Yalgoo Min |
| A88115 | 2010 | Karara | Final Report for E59/1363 for the period 19/05/2009 to 24/06/2010 |
| A87663 | 2010 | Karara | 2010 Annual Report for P59/1831 for the period 29/07/2009 to 28/07/2010 |
| A87640 | 2010 | Karara | 2010 Annual report for P59/1845 for the period 9/07/2009 to 8/07/2010 |
| A87639 | 2010 | Karara | 2010 Annual Report for P59/1850 for the period 9/07/2009 to 8/07/2010 |
| A87070 | 2010 | Karara | Karara Iron Ore Project Annual Combined Report for the period 30/04/2009 - 01/05/2010 E 59/817-I, E 59/1068-I, |
| A85712 | 2010 | Karara Iron Ore | Partial relinquishment report for E59/1170 for the period ending 31/10/2009 Yalgoo Mineral Field |
| A84006 | 2009 | KARARA IRON ORE | 2009 ANNUAL REPORT FOR P59/1830, P59/1844, P59/1845 and P59/1850 FOR THE PERIOD 24/06/2008 TO 23/06/2009 YALGO |
| A84005 | 2009 | Karara | 2009 ANNUAL REPORT FOR E59/1406 FOR THE PERIOD 15/07/2008 TO 14/07/2009 YALGOO MINERAL FIELD |
| A82655 | 2009 | Karara | 2009 COMBINED ANNUAL REPORT FOR E59/817, E59/ 1068, E59/1138, E59/1170, M59/ 644, M59/ 645, M59/ 649, M59/ 650 |
Report numbers filed by Karara Mining Ltd
Named projects
Project names Karara Mining Ltd used in their reports, with the shire each sits in.
Watching what Karara Mining Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.