Liatam Mining Pty Ltd
Liatam Mining Pty Ltd holds 8 Western Australian tenements covering 41,944 ha. It has lodged 8 open-file WAMEX reports between 2023 and 2025, mostly for lithium, tantalum and gold.
Who holds paper over Liatam Mining's ground?
7 of Liatam Mining's live titles carry a caveat or mortgage held by another party.
Caveats and mortgages over its ground
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Liatam Mining holds today
Liatam Mining holds 8 tenements across 41,944 ha. The register records 4 titles transferred in, the latest in July 2025.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Lithium 8 · Tantalum 7 · Gold 3 · Cesium 1 · Tin 1
- Where they worked
- Shire of East Pilbara 4, Shire of Coolgardie 3, City of Kalgoorlie-Boulder 1
- Work on record
- Surface geochemistry 6 · Rock chip sampling 5 · Geological mapping 3 · Aerial geophysical surveys 2 · Aerial magnetic surveys 2 · Auger drilling 2 · Geochemical interpretation 2 · Geophysical data processing 2
- Resource declared
- Never on this record
- Downloadable data
- 7 of 8 reports include a digital package
- Reports with no exploration
- 1 of 8 record no work done
- Report types
- Annual 3 · Partial Surrender 3 · Final Surrender 2
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A146097 | 2025 | Nullagine | P46/1809 Surrender Report Nullagine for the period ending 14/12/2024 |
| A144386 | 2024 | Quartz Hill | Combined Annual Mineral Exploration Report for Quartz Hill C58/2013 for the period ending 30/06/2024 |
| A144251 | 2024 | Noreena | E46/1317 Noreena Annual Technical Report for the period ending 30/07/2024 |
| A143454 | 2024 | Beatons Creek | Beatons Creek P46/1810 Surrender Report for the period 5 May 2016 to 4 May 2024 |
| A138416 | 2024 | Cowan | E28/2702 Partial Surrender Report Cowan Project for the period ending 29/01/2024. |
| A137957 | 2023 | Cowan | E15/1446 Partial surrender report Cowan Project for the period ending 31/10/2023. |
| A136847 | 2023 | Bald Hill Lithium and Tantalum | E15/1855 Annual Report Bald Hill Lithium and Tantalum for the period ending 24/07/2023. |
| A134986 | 2023 | Kurnalpi South | Partial Surrender Report for E 28/2581 and E28/2582 Kurnalpi South for the period ending 03/03/2023. C35/2021 |
Named projects
Project names Liatam Mining Pty Ltd used in their reports, with the shire each sits in.
Watching what Liatam Mining Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.