Moore River Metals Pty Ltd
Moore River Metals Pty Ltd holds no tenure on the current Western Australian register. It has lodged 16 open-file WAMEX reports between 2021 and 2024, mostly for copper, platinum group elements and nickel.
Exploration record
- Commodities targeted
- Copper 13 · Platinum Group Elements 11 · Nickel 7 · Zinc 6 · Lead 5 · Gold 2
- Where they worked
- Shire of Murchison 5, Shire of Meekatharra 4, Shire of Moora 3, Shire of Upper Gascoyne 2, Shire of Kent 1, Shire of Ashburton 1
- Work on record
- Rock chip sampling 10 · Surface geochemistry 10 · Soil sampling 8 · RC drilling 5 · Aircore drilling 4 · Geological mapping 4 · Geological reconnaissance 4 · Ground EM surveys 4
- Resource declared
- Never on this record
- Downloadable data
- 15 of 16 reports include a digital package
- Report types
- Annual 9 · Final Surrender 4 · Partial Surrender 1 · Co-Funded Drilling 1 · Core Library Drilling 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A143002 | 2024 | Nerramyne | Annual and Final Surrender Report for the Nerramyne Project C134/2022 for the period 16 April 2023 to 15 April |
| A139431 | 2024 | Berkshire Valley | Fourth Combined Annual Report for the Berkshire Valley Project C25/2021 for the period ending 07/01/2024. E 70 |
| A137070 | 2023 | Berala | Annual and Final Report for the Berala Project - E09/2648 for the period ending 25/08/2023. |
| A135497 | 2023 | Nerramyne | Second Combined Annual Report for the Nerramyne Project C134/2022 for the period ending 15/04/2023 |
| A135257 | 2023 | Pingandy | Annual and Final Report for the Pingandy Project C260/2021 for the period ending 20/04/2023 |
| A135164 | 2023 | Nerramyne | Partial Surrender Report for Nerramyne E70/5289 for the period ending 24/03/2023. |
| A134701 | 2023 | Berkshire Valley | Third Combined Annual Report for the Berkshire Valley Project C25/2021 for the period ending 07/01/2023. E 70 |
| A134468 | 2023 | Ashton Hills | Ashton Hills Annual Technical Report E52/4017 for the period ending 26/01/2023. |
| A134242 | 2023 | Perry Creek | Perry Creek Annual Technical Report E52/04016 for the period ending 26/01/2023 |
| A134146 | 2023 | Pingrup | Pingrup Project Annual Technical Report E70/05954 for the period ending 23/01/2023 |
| A134014 | 2023 | Nerramyne Project | Nerramyne Project, Co-Funded Government - Industry Drilling Program FINAL Report (R24) |
| A132230 | 2022 | Pingandy | Pingandy Project Combined C260/2021 Annual Technical Report fort the period ending 28/07/2022 |
| A131800 | 2022 | Pingandy | Core Resampling - Pingandy Project - A1470 for the period ending 15/08/2022. |
| A130951 | 2022 | Nerramyne | First Combined Annual Report for the Nerramyne Project C134/2022 for the period ending 15/04/2022. |
| A130254 | 2022 | Berkshire Valley | Second Combined Annual Report for the Berkshire Valley Project C25/2021 for the perid ending 07/01/2022. |
| A129078 | 2021 | Pingandy | Surrender Report for Pingandy E08/3161 for the period ending 04/11/2021 |
Named projects
Project names Moore River Metals Pty Ltd used in their reports, with the shire each sits in.
Watching what Moore River Metals Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See where they worked on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.