Poseidon Bow River Diamond Mine Ltd
Poseidon Bow River Diamond Mine Ltd holds no tenure on the current Western Australian register. It has lodged 3 open-file WAMEX reports between 1992 and 1993, mostly for diamond.
Exploration record
- Commodities targeted
- Diamond 3
- Where they worked
- Shire of Wyndham-East Kimberley 2
- Work on record
- Rotary drilling 2 · Geological interpretation 1 · Geological reconnaissance 1 · Gravel sampling 1 · Mine development 1 · Mine production 1 · Mine rehabilitation 1 · Photogeology 1
- Resource declared
- Never on this record
- Downloadable data
- 1 of 3 reports include a digital package
- Report types
- Annual 2 · Final Surrender 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A37868 | 1993 | Bow River | Annual report for the period 31/12/91-31/12/92 Exploration Licences;80/1409,80/1410,80/1311,80/1312, 80/1313.8 |
| A37459 | 1992 | Bow River | Bow River Project, Final Surrender Report for the period 07/11/1991 to 03/11/1992, E80/1410. |
| A35340 | 1992 | Bloodwood Yard | Annual Report 3or 1991-92 E80/1080 Bloodwood Yard Project Lissadell 1:250,000 Sheet SE 52-2 (For the period 02 |
Named projects
Project names Poseidon Bow River Diamond Mine Ltd used in their reports, with the shire each sits in.
Watching what Poseidon Bow River Diamond Mine Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See where they worked on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.