Round Oak Jaguar Project Pty Ltd
Round Oak Jaguar Project Pty Ltd holds 14 Western Australian tenements covering 13,848 ha. It is a subsidiary of Aeris Resources (ASX:AIS). It has lodged 2 open-file WAMEX reports between 2019 and 2020, mostly for copper, gold and lead.
Who owns Round Oak Jaguar Project?
Round Oak Jaguar Project is a subsidiary of Aeris Resources (ASX:AIS). The group is named as a holder on 50 live Western Australian tenements.
The other companies Aeris Resources holds ground through, with the live tenements each is named on:
From Aeris Resources' consolidated entity disclosure statement, as at 2026-06-30.
Who holds paper over Aeris Resources' ground?
Round Oak Jaguar Project is part of the Aeris Resources group, so these are the group's connections.
50 of Aeris Resources' live titles carry a caveat or mortgage held by another party.
Caveats and mortgages over its ground
See Aeris Resources' whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Round Oak Jaguar Project holds today
Round Oak Jaguar Project holds 14 tenements across 13,848 ha. The register records 13 titles transferred in, the latest in July 2018.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Copper 2 · Gold 2 · Lead 2 · Nickel 2 · Silver 2 · Zinc 2
- Where they worked
- Shire of Leonora 2
- Work on record
- Aircore drilling 2 · Diamond drilling 2 · EM logging 2 · Rehabilitation 2 · Auger drilling 1 · Geophysical logging 1 · Geotechnical drilling 1 · Grab sampling 1
- Resource declared
- Yes, in 1 report: A123220 (2020)
- Downloadable data
- 2 of 2 reports include a digital package
- Report types
- Annual 2
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A123220 | 2020 | Teutonic Bore Project | Combined Annual Report 2019 Teutonic Bore Project C/157/2002 for the period 1 January 2019 to 31 December 2019 |
| A119556 | 2019 | Teutonic Bore | C157/2002 Combined Annual Report for Teutonic Bore Project for the period 1 January 2018 to 31 December 2018 |
Named projects
Project names Round Oak Jaguar Project Pty Ltd used in their reports, with the shire each sits in.
Watching what Round Oak Jaguar Project Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.