Salt Lake Mining Pty Ltd
Salt Lake Mining Pty Ltd holds no tenure on the current Western Australian register. It has lodged 11 open-file WAMEX reports between 2014 and 2016, mostly for gold, nickel and copper.
Whose ground Salt Lake Mining holds paper over
Salt Lake Mining holds caveats or mortgages over 21 live titles of other companies.
It holds caveats and mortgages over
See Salt Lake Mining's whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
Exploration record
- Commodities targeted
- Gold 9 · Nickel 9 · Copper 3 · Potash 1
- Where they worked
- Shire of Coolgardie 6, Shire of Menzies 4, Shire of Laverton 1
- Work on record
- RAB drilling 4 · RC drilling 3 · Aircore drilling 2 · Geological reconnaissance 2 · Ground gravity surveys 2 · Mineral resource estimate 2 · Auger drilling 1 · Co-funded drilling 1
- Resource declared
- Yes, in 2 reports: A108401 (2016), A106852 (2015)
- Downloadable data
- 10 of 11 reports include a digital package
- Report types
- Annual 8 · Partial Surrender 2 · Co-Funded Drilling 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A110386 | 2016 | Fletcher Trend - Beta Hunt | Final Report of Co-Funded Drilling Exploration Results Fletcher Trend, Beta Hunt Mine, Salt Lake Mining Pty Lt |
| A109156 | 2016 | Carr Boyd | Carr Boyd Project Annual Report C434/1995 For the licences E29/555, E31/726, M31/12, M31/109 and M31/159 For t |
| A108401 | 2016 | Lake Wells | Combined Annual Technical Report C154/2014 for the period 31 December 2014 to 30 December 2015 E38/2710, E38/2 |
| A106852 | 2015 | Widgiemooltha North | Widgiemooltha North C19/2002 Annual Report for the period 01 July 2014 to 30 June 2015, M15/74, M15/75, M15/87 |
| A106326 | 2015 | Widgiemooltha South - Mount Eaton – Wan | Annual Report Widgiemooltha South Project (Mt Eaton – Wannaway), E15/970 Reporting Period: 4 June 2014 to 3 Ju |
| A105603 | 2015 | Carr Boyd | Carr Boyd Project Annual Report C434/1995 for the licences E29/555, E31/726, M31/12, M31/109, M31/159, For the |
| A103457 | 2014 | Widgiemooltha South - Mount Eaton – Wann | Partial Surrender Report Widgiemooltha South Project (Mt Eaton – Wannaway), E15/970 for the period 3 June 2008 |
| A103456 | 2014 | Widgiemooltha North | Widgiemooltha North C19/2002 Annual Report for the period 01 July 2013 to 30 June 2014, M15/74, M15/75, M15/87 |
| A103050 | 2014 | Widgiemooltha South - Mt Eaton - Wannawa | ANNUAL REPORT WIDGIEMOOLTHA SOUTH PROJECT (MT EATON – WANNAWAY) E15/970 Reporting Period: 4 June 2013 to 3 Jun |
| A102584 | 2014 | Carr Boyd | Carr Boyd C434/1995 Project Annual Report for the licences E29/555, E31/726, M31/12, M31/109, M31/159, P31/192 |
| A102469 | 2014 | Carr Boyd | Partial Surrender Report Carr Boyd Project C434/1995, E31/726 for the period 3 April 2008 to 2 April 2014 |
Named projects
Project names Salt Lake Mining Pty Ltd used in their reports, with the shire each sits in.
Watching what Salt Lake Mining Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See where they worked on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.