Shalinden Pty Ltd
Shalinden Pty Ltd holds 3 Western Australian tenements covering 475 ha. It has lodged 3 open-file WAMEX reports between 1998 and 2011, mostly for gypsum, limesand and limestone.
What Shalinden holds today
Shalinden holds 3 tenements across 475 ha. The register records 2 titles transferred in, the latest in December 1999.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Gypsum 2 · Limesand 1 · Limestone 1
- Where they worked
- Shire of Esperance 2, Shire of Carnarvon 1
- Work on record
- Gypsum 2 · Mineral resource estimate 2 · Auger drilling 1 · Channel sampling 1 · Computer modelling 1 · Orebody modelling 1 · Soil sampling 1
- Resource declared
- Yes, in 2 reports: A89695 (2011), A88371 (2010)
- Downloadable data
- 2 of 3 reports include a digital package
- Report types
- Annual 2 · Final Surrender 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A89695 | 2011 | Lake Tay | Lake Tay Gypsum Project Annual Report M74/49 Period 06/01/10-05/01/11 |
| A88371 | 2010 | Lake Tay | Lake Tay, Gypsum Project Annual Report M74/61, Period 17/09/09-16/08/10 |
| A55123 | 1998 | Lyndon River | Surrender Report, E08/860, 841 Lyndon River Limestone Project, 06/1998 |
Named projects
Project names Shalinden Pty Ltd used in their reports, with the shire each sits in.
Watching what Shalinden Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.