Tailflower Pty Ltd
Tailflower Pty Ltd holds 9 Western Australian tenements covering 64,680 ha. It has lodged 7 open-file WAMEX reports between 2022 and 2025, mostly for nickel, platinum group elements and copper.
Who holds paper over Tailflower's ground?
1 of Tailflower's live titles carry a caveat or mortgage held by another party.
Caveats and mortgages over its ground
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Tailflower holds today
Tailflower holds 9 tenements across 64,680 ha. The register records 5 titles transferred in, the latest in June 2023.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Nickel 5 · Platinum Group Elements 5 · Copper 1 · Base Metals 1
- Where they worked
- Shire of Menzies 4, City of Karratha 2, Shire of Meekatharra 1
- Work on record
- Ground EM surveys 2 · Aerial magnetic surveys 1 · Co-funded drilling 1 · Core library 1 · Density 1 · Diamond drilling 1 · Geological interpretation 1 · Geological logging 1
- Resource declared
- Never on this record
- Downloadable data
- 3 of 7 reports include a digital package
- Reports with no exploration
- 3 of 7 record no work done
- Report types
- Annual 4 · Final Surrender 2 · Co-Funded Drilling 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A150781 | 2025 | Ilgarari | Ilgarari EIS drilling report (R31) |
| A145597 | 2024 | Cambridge | Cambridge Surrender Report C23/2022 for the period ending 22/11/2024 |
| A143767 | 2024 | Cambridge | Cambridge Annual Report C23/2022 for the period ending 31/05/2024. E 39/2136,E 39/2195 |
| A136482 | 2023 | Cambridge | C23/2022 Cambridge Annual Report for the period ending 31/05/2023 |
| A136029 | 2023 | Viper | Viper Project - Final Surrender E47/04466 for the period 25 May 2021 to 24 May 2023 |
| A132050 | 2022 | Cambridge | Cambridge Annual Report C23/2022 for the period ending 31/05/2022. E 39/02136,E 39/02195 |
| A131452 | 2022 | Viper | Viper Annual Report E47/4466 for the period ending 24/05/1965 |
Named projects
Project names Tailflower Pty Ltd used in their reports, with the shire each sits in.
Watching what Tailflower Pty Ltd does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.