Thor Mining PLC
Thor Mining PLC holds no tenure on the current Western Australian register. It has lodged 22 open-file WAMEX reports between 2010 and 2020, mostly for gold, base metals and platinum group elements.
Exploration record
- Commodities targeted
- Gold 21 · Base Metals 2 · Platinum Group Elements 2 · Copper 2 · Nickel 2 · Iron 1
- Where they worked
- Shire of Dundas 15, Shire of Esperance 5, Shire of East Pilbara 2
- Work on record
- Calcrete sampling 7 · Rock chip sampling 3 · Aircore drilling 2 · Multielement analysis 2 · Copper 1 · Geochemical interpretation 1 · Geological reconnaissance 1 · Gold 1
- Resource declared
- Never on this record
- Downloadable data
- 14 of 22 reports include a digital package
- Reports with no exploration
- 6 of 22 record no work done
- Report types
- Annual 18 · Final Surrender 3 · Partial Surrender 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A124812 | 2020 | Hillside | Final Surrender Report for E45/5245 Hillside Project for the period ending 26/08/2020 |
| A120336 | 2019 | Panorama | Annual Report for E46/1190 Panorama Project for the period 1 May 2018 to 30 April 2019 |
| A116139 | 2018 | Dundas | Final Surrender Report for E63/872 Dundas Project for the period 07/04/2009 - 22/01/2018 |
| A114049 | 2017 | Dundas | Annual Report for E63/872 "Dundas" For the Period 7 April 2016 to 6 April 2017 |
| A109120 | 2016 | Dundas North | E63/872 “Dundas North 3” Year 7 Annual Report for the period 7 April 2015 – 6 April 2016 |
| A106319 | 2015 | Dundas North 3 | E63/872 “Dundas North 3” Year 6 Annual Report for the period April 7 2014 – April 6 2015 |
| A102418 | 2014 | Dundas North 2 | Annual Report for Dundas North 2 Project E63/1102 for the period 17 April 2013 to 16 April 2014 |
| A102226 | 2014 | Dundas North 3 | E63/872 “Dundas North 3” Year 5 Annual Report April 7 2013 – April 6 2014 |
| A99167 | 2013 | Dundas North 1 | E63/1101 “Dundas North 1” Final Technical Report for the period ended 9 July 2013 |
| A98168 | 2013 | Dundas North 2 | Dundas North 2 Project, Annual Report for the period 17/04/2012 to 16/04/2013, E63/1102. |
| A98167 | 2013 | Dundas North 1 | Dundas North 1 Project, Annual Report for the period 17th April 2012 to 16th April 2013, E63/1101. |
| A98093 | 2013 | Dundas North 3 | E63/872, “Dundas North 3” NORSEMAN 1:250K MAP SHEET Year 4 Annual Report April 7 2012 – April 6 2013 |
| A94442 | 2012 | Dundas North 3 | E63/872 “Dundas North 3 Year 3 Partial Surrender Report April 7 2009 – April 6 2012 |
| A93720 | 2012 | Dundas North 2 | E63/1102 “Dundas North 2” Year 3 Annual Report April 17 2011 – April 16 2012 |
| A93719 | 2012 | Dundas North 1 | E63/1101 “Dundas North 1" Year 3 Annual Report April 17 2011 – April 16 2012 |
| A93718 | 2012 | Dundas North 3 | E63/872 “Dundas North 3” Year 3 Annual Report April 7 2011 – April 6 2012 |
| A90396 | 2011 | Dundas North 2 | Dundas North 2 Project, (2nd) Annual Report for the period 17th April 2010 to 16th April 2011, E63/1102. |
| A90368 | 2011 | Dundas North 1 | Dundas North 1 Project, (2nd) Annual Report for the period 17th April 2010 to 16th April 2011, E63/1101. |
| A90367 | 2011 | Dundas North 3 | Dundas North 3 Project, (2nd) Annual Report for the period 7th April 2010 tp 6th April 2011, E63/872. |
| A87032 | 2010 | Dundas North 2 | E63/1102 “Dundas North 2” Year 1 Annual Report, April 17 2009 – April 16 2010 |
Report numbers filed by Thor Mining PLC
Named projects
Project names Thor Mining PLC used in their reports, with the shire each sits in.
Watching what Thor Mining PLC does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See where they worked on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.