Trans Pacific Energy Group
Trans Pacific Energy Group holds 3 Western Australian tenements covering 9,800 ha. It has lodged 9 open-file WAMEX reports between 2019 and 2025, mostly for gold, nickel and copper.
Who holds paper over Trans Pacific Energy Group's ground?
1 of Trans Pacific Energy Group's live titles carry a caveat or mortgage held by another party. It holds 1 live title together with another holder.
Caveats and mortgages over its ground
Holds ground with
See Trans Pacific Energy Group's whole web
From caveats, mortgages and joint holdings on the DMPE tenement register. A caveat protects an interest in a title, such as a royalty, an option or a loan; the register does not say which.
What Trans Pacific Energy Group holds today
Trans Pacific Energy Group holds 3 tenements across 9,800 ha. The register records 4 titles transferred in, the latest in August 2025.
- Which tenements they hold, by type and local government area
- Every title bought, sold or transferred, and who it was with
- Expenditure compliance across the portfolio
- Dormant ground and forfeiture exposure
- Mortgages, caveats and the expiry profile
Exploration record
- Commodities targeted
- Gold 9 · Nickel 9 · Copper 4 · Platinum Group Elements 4 · Lithium 2 · Cobalt 1 · Zinc 1
- Where they worked
- Shire of Dundas 5, City of Kalgoorlie-Boulder 2, Shire of Leonora 2
- Also filed as
- Trans Pacific Energy Group · Trans Pacific Energy Group Ltd
- Work on record
- Geological reconnaissance 2 · Rock chip sampling 2 · Surface geochemistry 2 · Aircore drilling 1 · Auger drilling 1 · EM logging 1 · Geological mapping 1 · Geophysical interpretation 1
- Resource declared
- Never on this record
- Downloadable data
- 4 of 9 reports include a digital package
- Reports with no exploration
- 4 of 9 record no work done
- Report types
- Annual 8 · Partial Surrender 1
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A150787 | 2025 | Grey Dam | E 28/01477 - Partial Surrender Report Grey Dam for the period ending 02/09/2025. |
| A134905 | 2023 | Highway-Volcano Bay | Highway-Volcano Bay – Annual Technical Report C342/2022 for the period ending 24/02/2023. |
| A130308 | 2022 | Highway | E63/1747 – Highway – Annual Technical Report for the period ending 24/02/2022. |
| A130307 | 2022 | Volcano Bay | E63/1741 – Volcano Bay – Annual Technical Report for the period ending 25/02/2022. |
| A126894 | 2021 | Highway | Highway Project E63/01747 Annual Report for the period ending 24/02/2021 |
| A126893 | 2021 | Volcano Bay | Volcano Bay E 63/01741 Annual Technical Report for the period ending 24/2/2021 |
| A124939 | 2020 | Lake Yindarlgooda | Lake Yindarlgooda E28/2259 – Annual Technical Report for the period ending 1 August 2020 |
| A122127 | 2019 | Kathleen Valley | Kathleen Valley Project Annual Report E36/00876 for the period 10 November 2018 to 9 November 2019 |
| A118755 | 2019 | Kathleen Valley | Kathleen Valley E36/00876 Annual Report for the period 10 November 2017 to 9 November 2018 |
Named projects
Project names Trans Pacific Energy Group used in their reports, with the shire each sits in.
Watching what Trans Pacific Energy Group does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See their ground on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.