Us Steel International Inc
Us Steel International Inc holds no tenure on the current Western Australian register. It has lodged 11 open-file WAMEX reports between 1968 and 1980, mostly for copper, nickel and iron ore.
Exploration record
- Commodities targeted
- Copper 7 · Nickel 7 · Iron 4 · Zinc 2
- Where they worked
- Shire of Ashburton 4, Shire of Menzies 2, Town of Port Hedland 2, City of Karratha 2, Shire of East Pilbara 1
- Work on record
- Rock chip sampling 3 · Costeaning 2 · Diamond drilling 2 · Percussion drilling 2 · Geochemical interpretation 1 · Geological interpretation 1 · Geological mapping 1 · Geological reconnaissance 1
- Resource declared
- Never on this record
- Downloadable data
- 3 of 11 reports include a digital package
- Report types
- Annual 6 · Non-statutory 5
Reports filed
| Report | Year | Project | Title |
|---|---|---|---|
| A9275 | 1980 | Ghost Rock | Ghost Rock Project, Non-statutory Report: 1973 Final Report, July 1980, MC29/1555-1560, 1842, 2334-2335, 2337- |
| A9273 | 1973 | Ghost Rock | Ghost Rock Project, Non-statutory Report: 1972 Final Report, March 1973, MC29/1555-1560,1842, 2334-2335, 2337- |
| A6 | 1971 | Lower Robe River | Lower Robe River Project, Non-statutory Report: Plans to Accompany A Nos 3 & 4, January 1970, TR70/4890, 4895 |
| A5 | 1971 | Lower Robe River | Lower Robe River Project, Non-statutory Report: Summary of Activities ( U.S.S.I Int. N.Y.) for the years1968, |
| A4 | 1971 | Lower Robe River | Lower Robe River Project, Annual Report for the period ending 31/12/1969,TR70/4890,4895,4971H.(See also A6 for |
| A13080 | 1970 | Mundine Well | Mundine Well Project, Annual Report for the period ending 31/12/1970, MC45/1419, 1427-1431 & 1700-1719. |
| A13079 | 1970 | Marble Bar - Pibara | Marble Bar - Pilbara Project, Annual Report for the period ending 31/12/1969, ( Base Metal Exploration Program |
| A13078 | 1969 | Roebourne-Whundo - Pilbara | Roebourne-Whundo -Pilbara Project, Annual Report for the period ending 31/12/1969, TR70/4782. |
| A13077 | 1969 | Roebourne - Whundo - Pilbara | Roebourne - Whundo - Pilbara Project, 1968 Exploration Programme ( 1968 Field Season), February 1969. TR70/478 |
| A13076 | 1968 | Pilbara | Pilbara Project, Non-statutory Report: Base Metal Prospects of the Pilbara Area, June ,TR70/1515........TR70/4 |
| A3 | 1968 | Lower Robe River | Lower Robe River Project, Annual Report for the period ending 31/12/1968, TR70/4890, 4895 & 4971.(See also A6 |
Named projects
Project names Us Steel International Inc used in their reports, with the shire each sits in.
Watching what Us Steel International Inc does next?
NextMaps tracks every WA tenement move as it registers: new applications, transfers, surrenders and status changes. Open the live map to see their current holdings against the full register record. With Premium, a holder alert emails you when this company pegs, drops or trades ground.
See where they worked on the mapTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0). Compiled by NextMaps. Verify against primary sources before reliance.