NextMapsWA TenementsE 08/1430-I

E 08/1430-I

LiveExploration LicenceShire of AshburtonAshburton M.F. District
Area
9,920ha
Expires
Oct 2026
in 2 months
WAMEX reports
116
WA median is 53
Report drilling
59
of 116 reports
Ashburton Explore on the live map

Register summary

Holders
Api Management Pty Ltd, Red Hill Iron Limited
Local government
Shire of Ashburton
Application received
7 Jan 2004
Commenced
19 Oct 2005
Expiry
18 Oct 2026
Term
5 Years (Extended)

Exploration history on this ground

116 historical WAMEX exploration reports intersect E 08/1430-I: 77 report geochemistry or sampling, 77 include a digital data package.
When this ground was worked · 115 of 116 reports dated
21960s
31970s
111980s
171990s
352000s
422010s
52020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A147694 2025 Red Hill Minerals Limited Mr Wonderful <1% EIS Co-Funded Drilling Report R28
A149920 2025 Red Hill Minerals Limited Elwood <1% Co-Funded Drilling Final Report Round 29 - Elwood
A122774 2020 Api Management Pty Ltd West Pilbara - Red Hill JV 6.3% Combined Annual Technical Report C84/2006 for West Pilbara (Red Hill JV) Project for the Period 1 January 2019
A124852 2020 Api Management Pty Ltd Mount Stuart <1% Annual Technical Report for C207/1998 Mount Stuart Project for the Period 8 August 2019 to 7 August 2020
A125290 2020 Api Management Pty Limited Yanks Bore 23% Annual Technical Report for E08/1135 Yanks Bore Project for the Period 2 November 2019 to 1 November 2020
111 more reports
A119265 2019 Api Management Pty Ltd West Pilbara - Red Hill JV 6.3% Combined Annual Technical Report C84/2006 for West Pilbara (Red Hill JV) Project for the Period 1 January 2018
A118892 2019 Red Hill Iron Limited Red Hill <1% Red Hill Project E08/1473_I Final Surrender Report for the period 19 October 2005 to 1 October 2018
A121182 2019 Api Management Pty Ltd Mount Stuart <1% Combined Annual Technical Report E52/00023, E52/00021, E52/02876, C207/1998 Mount Stuart Project for the perio
A121790 2019 Api Management Pty Ltd Yanks Bore 23% Annual Technical Report for E08/1135- Yanks Bore for the period 2 November 2018 to 1 November 2019
A115918 2018 Cgm (Wa) Pty Ltd West Pilbara <1% C84/2006 West Pilbara EIS Co-Funded Drilling Report (R#15) for the period 29 October 2017 to 19 November 2017,
A115935 2018 Australian Premium Iron Pty Ltd West Pilbara 6.1% West Pilbara (Red Hill) Project C84/2006 Combined Annual Technical Report For the Period 1 January 2017 to 31
A117654 2018 Api Management Pty Ltd Mount Stuart <1% C207/1998 Annual Technical Report, Mount Stuart Project, 08 August 2017 - 07 August 2018
A115693 2018 Australian Premium Iron Pty Ltd Yanks Bore 23% Yanks Bore Annual Technical Report E08/01135 for the period 2 November 2016 to 1 November 2017
A118115 2018 Api Management Pty Limited Yanks Bore 23% Annual Technical Report for E08/1135 Yanks Bore for the period 2 November 2017 to 1 November 2018
A114997 2017 Api Management Pty Limited Mount Stuart <1% Mount Stuart Iron Ore Joint Venture Project C207/1998 Annual Report for the period 08/08/2016 - 07/08/2017
A110774 2017 Australian Premium Iron Pty Ltd Yanks Bore 23% Yanks Bore Annual Technical Report E 08/01135 2 November 2015 to 1 November 2016
A112426 2017 Australian Premium Iron Pty Ltd West Pilbara - Red Hill 6.1% West Pilbara (Red Hill) Project C84/2006 Combined Annual Technical Report for the period 01/01/2016 to 31/12/2
A107867 2016 Fortescue Metals Group Ltd Red Hill <1% C326/2011 Red Hill Final Surrender Report for the period 29/06/2011 to 31/08/2015, E 08/01816, E 08/01814, E 0
A108329 2016 Api Management Pty Limited West Pilbara - Red Hill 6.1% Combined Annual Technical Report West Pilbara (Red Hill) Project 1 January 2015 to 31 December 2015
A107811 2016 Api Management Pty Limited Yanks Bore 23% Yanks Bore Project E08/1135 Annual Report for the period 02/11/2014 to 01/11/2015
A109955 2016 Fortescue Metals Group Ltd Red Hill <1% E08/1432 (Red Hill South) Final Surrender Report for the period 06/10/2011 to 22/07/2016
A110001 2016 Australian Premium Iron Pty Ltd Mount Stuart <1% C207/1998 Mount Stuart Iron Ore Joint Venture Annual Report for 8 August 2015 to 7 August 2016, E 08/01292, E
A105221 2015 Api Management Pty Ltd West Pilbara - Red Hill 6.1% Combined Annual Technical Report for the period 1 January 2014 to 31 December 2014, West Pilbara (Red Hill) Pr
A105342 2015 Fortescue Metals Group Ltd Red Hill <1% Combined Mineral Exploration Report: C326/2011 Red Hill Project for the period 1st January 2014 to 31st Decemb
A106828 2015 Api Management Pty Ltd Mount Stuart <1% Combined Annual Report for the period 8th August 2014 to 7th August 2015, Mount Stuart Project, E08/1292, E08/
A104510 2015 Api Management Pty Ltd Yanks Bore 23% Annual Technical Report for the period 2 November 2013 to 1 November 2014, Yanks Bore Project, E08/1135
A100710 2014 Api Management Pty Ltd Yanks Bore 23% Annual Technical Report for the period 2 November 2012 to 1 November 2013, Yanks Bore Project, E08/1135
A101457 2014 Fortescue Metals Group Ltd Red Hill <1% Annual Report for the Period 1st of January to 31st of December 2013 – C326/2011 Red Hill, E08/1432, E08/1439,
A101620 2014 Api Management Pty Ltd West Pilbara - Red Hill 6.1% Combined Annual Technical Report for the period 1 January 2013 to 31 December 2013, West Pilbara (Red Hill) Pr
A103537 2014 Api Management Pty Ltd Mount Stuart <1% Combined Annual Report for the period 8th August 2013 to 7th August 2014, MOUNT STUART PROJECT, COMPRISING TEN
A97255 2013 Api Management Pty Ltd West Pilbara [Red Hill] 6.1% West Pilbara [ Red Hill ] Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/12
A97290 2013 Fortescue Metals Group Ltd Red Hill <1% Annual Report for the period 1 January 2012 to 31 December 2012, Red Hill Project, C326/2011.
A96413 2013 Api Management Pty Ltd Yanks Bore 23% Annual Technical Report for the period 2 November 2011 to 1 November 2012, Yanks Bore Project, Exploration Lic
A99447 2013 Api Management Pty Ltd Mount Stuart <1% Mount Stuart Project, Annual Report for the period 08/08/2012 to 07/08/2013, E08/1292, 1330 & 1341. [C207/1998
A100425 2013 Kubwa Iron Ore Holdings Pty Ltd Red Hill Well <1% Red Hill Well Project, Annual Report for the period 22/07/2012 to 21/07/2013, E08/2174.
A92452 2012 Api Management Pty Ltd Yanks Bore 23% Annual Technical Report for the period 2 November 2010 to 1 November 2011, Yanks Bore Project, Exploration Lic
A93198 2012 Api Management Pty Ltd West Pilbara - Red Hill 6.1% Combined Annual Technical Report for the period 1 January 2011 to 31 December 2011, West Pilbara (Red Hill) Pr
A95108 2012 Api Management Pty Ltd Mount Stuart <1% Combined Annual Report for the period 8th August 2011 to 7th August 2012, Mount Stuart Project, E08/1292, E08/
A95324 2012 Kubwa Iron Ore Holdings Pty Ltd Red Hill Well <1% Annual Mineral Exploration Report, Red Hill Well Project E08/2174 for the period 22nd July 2011 to 21st July 2
A88924 2011 Api Management Pty Ltd Yanks Bore 23% Annual Technical Report for the period 2 November 2009 to 1 November 2010, Yanks Bore Project, E08/1135
A89704 2011 Api Management Pty Ltd West Pilbara - Red Hill 6.1% Combined Annual Technical Report for the period 1 January 2010 to 31 December 2010, West Pilbara (Red Hill) Pr
A90221 2011 Dynasty Metals Australia Ltd Warramboo <1% Warramboo Project, Final Surrender Report for the period ending 03/05/2011, E08/1620.
A91521 2011 Api Management Pty Ltd Mount Stuart <1% Combined Annual Report for the period 8th August 2010 to 7th August 2011, Mount Stuart Project, E08/1292, E08/
A85510 2010 Cullen Exploration Pty Ltd Yanks Bore - Red Hill West 23% Yanks Bore Project E08/1135 (Red Hill West) Annual Technical Report for the period 2nd November 2008 to 1 Nove
A86271 2010 Api Management Pty Ltd West Pilbara / Red Hill 6% Combined Annual Technical Report for the period 1 January 2009 to 31 December 2009, West Pilbara (Red Hill) Pr
A87377 2010 Dynasty Metals Australia Ltd Warramboo <1% Annual Report E 08/1620-I Warramboo for the Period Ending 05/03/2010
A88021 2010 Api Management Pty Ltd Mount Stuart <1% Combined Annual Report for the period 8th August 2009 to 7th August 2010, Mount Stuart Project, E08/1292, E08/
A80729 2009 Cullen Exploration Pty Ltd YANKS BORE 23% YANKS BORE PROJECT WESTERN AUSTRALIA E08/1135 (Red Hill West) ANNUAL TECHNICAL REPORT For the period 2nd Novem
A81613 2009 Api Management Pty Ltd WEST PILBARA (RED HILL) 6% COMBINED ANNUAL TECHNICAL REPORT FOR THE PERIOD 1 JANUARY 2008 to 31 DECEMBER 2008, WEST PILBARA (RED HILL) PR
A82553 2009 Dynasty Metals Australia Ltd Warramboo <1% Anuual Report E08/1620 Warramboo for the Period Ending 04/02/2009
A82828 2009 Api Management Pty Ltd Red Hill <1% PARTIAL SURRENDER REPORT FOR THE PERIOD 25 MAY 2005 to 24 MAY 2009 RED HILL PROJECT EXPLORATION LICENCE 08/129
A84508 2009 Api Management Pty Ltd Mount Stuart <1% Combined Annual Report for the period 8th August 2008 to 7th August 2009, Mount Stuart Project, E08/1292, E08/
A84791 2009 Api Management Pty Ltd Red Hill 50% Partial Surrender Report for the period 17 July 2006 to 16 July 2009, Red Hill Project, Exploration Licence 08
A77116 2008 Cullen Exploration Pty Ltd Yanks Bore 23% Yanks Bore Project E08/1135 (Red Hill West) Annual Technical Report Report No: ASH/YB/08-1A For the period 2nd
A79667 2008 Cullen Exploration Pty Ltd Catho Well, Cardo Bore & Mount Stuart <1% WYLOO DOME AREA, 2008 COMBINED ANNUAL TECHNICAL REPORT, C07/1199, C207/1998
A77793 2008 Api Management Pty Ltd Red Hill 6% COMBINED ANNUAL REPORT FOR THE PERIOD 1 JANUARY 2007 to 31 DECEMBER 2007 RED HILL PROJECT C84/2006 (M 7925/3)
A78466 2008 Dynasty Metals Australia Ltd Warramboo <1% Annual Report for the Period Ending 5 March 2008 Warramboo Project, E08/1620
A74330 2007 Api Management Pty Ltd Yanks Bore 23% Annual Report for the Period 2 November 2005 to 1 November 2006, Yanks Bore Project E08/1135-Red Hill West, Co
A74688 2007 Red Hill Iron Ltd Red Hill 6.9% Red Hill Joint Venture Project C84/2006 Combined Annual Report (for period Jan 2005-Dec 2006)
A76269 2007 Cullen Exploration Pty Ltd Wyloo <1% Wyloo Dome Area, Ashburton Region, W.A. 2007 Combined Annual technical Report Catho Well, Cardo Bore & Mount S
A73299 2006 Api Management Pty Ltd Red Hill <1% Combined Annual Report for the Period 26 May 2005 to 25 May 2006, Red Hill Joint Venture E08/1283,1294-1295,13
A73448 2006 Cullen Exploration Pty Ltd Wyloo Dome <1% Wyloo Dome Area, 2006 Combined Annual Technical Report, De Courcy,Horse Well,Catho Well,Cardo Bore,Mt Stuart P
A72062 2006 Cullen Exploration Pty Ltd Yanks Bore 14% Yanks Bore Project, E08/1022 Yanks Bore, E08/1135 Red Hill West, MLA08/281-284,327,328 Yanks Bore, Ashburton M
A72232 2006 Api Management Pty Ltd Red Hill <1% Annual Report for the Period 15 February 2005 to 14 February 2006, E08/1227,E47/982, (Urandy Creek Project, Co
A69952 2005 Cullen Exploration Pty Ltd Yanks Bore 14% Annual technical report for the period 01/11/03 - 31/10/04 Yanks Bore Project, C32/2002, Red Hill West and Yan
A70907 2005 Giralia Resources Nl Urandy Creek <1% Urandy Creek Project, Annual report for the period 14 February 2004 to 13 February 2005 (E08/1227, C132/2002,
A71266 2005 Cullen Exploration Pty Ltd Decourcy <1% Decourcy Project, Ashburton Region, W.A. 2005 Combined Annual Technical Rreport, De Courcy, Horse Well, Catho
A68276 2004 Cullen Exploration Pty Ltd Yanks Bore 14% Yanks Bore Project, Annual Report E08/1022,( MLA/08/281-284) , E08/1135 ( Red Hill West) for period ending 31s
A68320 2004 Mines & Resources Australia Pty Ltd Urandy Creek <1% Annual Report for the period 14/02/2003-13/02/2004 Urandy Creek Project (C132/2002) E47/836, E47/982, E08/1227
A69378 2004 Cullen Exploration Pty Ltd Wyloo <1% Annual report for the period 08/08/03-07/08/04 Wyloo project, E08/1166, E08/1189, E08/1292, E08/1327, E08/1330
A66321 2003 Cullen Exploration Pty Ltd Yanks Bore 14% Combined Annual Mineral Exploration Report for period ending 31 October 2002 Yanks Bore Project C32/2002: Yank
A66360 2003 Mines & Resources Australia Pty Ltd Urandy <1% Urandy Project Annual Report for the period 14 February 2002 to 13 February 2003 C132/2002: E47/836, 982 & E08
A67247 2003 Cullen Exploration Pty Ltd Yanks Bore 23% Yanks Bore Project, Ashburton Mineral Field WA, Red Hill West, (E08/1135), Partial Surrender Report Third Anni
A64332 2002 Cullen Exploration Pty Ltd Yanks Bore 14% Yanks Bore Project E08/1022 (Yanks Bore) E08/1135 (Red Hill West) Annual Technical Report 6 November 2000 - 5
A64852 2002 Newcrest Mining Ltd Ashburton <1% Final Report For Period Ending May 22,2001 Exploration Licence E08/949 1;250,000 Geological Map Sheet Wyloo -
A63434 2001 Goldfields Exploration Pty Ltd Red Hill 23% Annual Report Red Hill E08/1135.Annual Report for period 5/6/2000 to 4/6/2001 Vol 1 of 1.
A64316 2001 Newcrest Mining Ltd Ashburton <1% Annual Technical Report to the Department of Minerals & Petroleum Resources for period ending December 31, 200
A62492 2001 Newcrest Mining Ltd Ashburton <1% Ashburton Project Northwestern Exploration Area Partial Surrender Report For Period Ending May 22, 2001 E08/94
A63350 2001 Goldfields Exploration Pty Ltd Red Hill East 95% Surrender Report Red Hill East E08/1146
A59710 2000 Newcrest Mining Ltd Ashburton <1% Ashburton Regional Project, Northwestern Exploration Area, Exploration Licences E08/831,949,950, E47/850,851,
A60406 2000 Newcrest Mining Ltd Ashburton <1% Ashburton Project Northwestern Exploration Area Partial Surrender Reprot to the Department of Minerals and Ene
A61823 2000 Newcrest Mining Ltd Ashburton <1% Ashburton Project, Annual Report for the period ending December 31st 2000 , E08/831, 949 & 950..
A57400 1999 Newcrest Mining Ltd Ashburton <1% Ashburton Regional Project - Northwestern Exploration Area Exploration Licence: E08/831, 949, 950, E47/850, 85
A57884 1999 Winterfall Pty Ltd Cardo (Red Hill) 37% Cardo (Red Hill) Prospect Exploration Licence 08/1042 Reporting Period 15/12/1997 to 14/12/1998
A54411 1998 Sipa Exploration Nl Ashburton <1% Ashburton Regional Project, Northwestern Exploration Area 1997 Annual Report, E08/947-950, E47/850-851 01/01/9
A57032 1998 Rio Tinto Exploration Pty Ltd Kays Well 4.5% Surrender Report for the year ending 7th October on Exploration completed within E08/968 Kays Well, November 1
A44334 1995 Robe River Mining Co Pty Ltd Cardo East 45% Annual Report for the period 11/03/94-10/03/95 Cardo East Project E08/684
A46397 1995 Robe River Mining Co Pty Ltd Cardo East 45% Surrender Report for E08/684 for period ending 13 November 1995, Cardo East.
A41762 1994 Valiant Consolidated Ltd Ashburton 11% Ashburton Project, Annual Report for the period 16/07/1993 to 15/07/1994, E08/427.
A41763 1994 Valhalla Exploration And Mining Pty Ltd Ashburton 2.5% Ashburton Project, Annual Report for the period 22/07/1993 to 21/07/1994, E08/597.
A42185 1994 Valiant Consolidated Ltd Cane Well 11% Cane Well Project, Partial Surrender Report, September 1994, E08/427.
A42949 1994 Robe River Mining Co Pty Ltd Lindsay Gordon Lagoon 45% Partial Surrender report for the period 1992 Lindsay Gordon Lagoon Project E53/344
A40875 1994 Cra Exploration Pty Ltd Ashburton 8.1% Ashburton Project, Partial Surrender Report for period ending 22nd February 1994, E08/463.
A40891 1994 Cra Exploration Pty Ltd Ashburton 7.8% Ashburton Project, Annual Report for the year ending 22nd April 1994, E08/427,463, & 597.
A42930 1994 Valiant Consolidated Ltd Cane Well 7.8% Cane Well Project, Annual Report for the period ending 31st October 1994, E08/427, 463 & 597.
A38374 1993 Cra Exploration Pty Ltd Ashburton 2.4% Ashburton Project, Annual Report for the year ending 22nd April 1993, E08/427-430, E08/516, E08/585, E08/597 &
A36625 1992 Cra Exploration Pty Ltd Basemetals 3.2% Basemetals Project, Annual Report for the year ending 22nd April 1992, E08/427-430, E08/463, E08/516.
A30007 1990 Rt Mining Corp Pty Ltd Red Hill 6.8% Red Hill Project, Final Surrender Report for the period 13th September 1989 to 26th January 1990, E08/185.
A30008 1990 Rt Mining Corp Pty Ltd Cardo Bore 1.4% Cardo Bore Project, Final Surrender Report for the period 13th September 1989 to 26th January 1990, E08/187.
A26770 1989 Billiton Australia Kunda Creek 5.8% Kunda Creek, First Annual and Final Relinquishment Report, exploration licence 08/202.
A27839 1989 Bp Minerals Aust Pty Ltd Cane River 39% Exploration Licence 08/175, Cane River, Final Report for the period 8th May 1987 to 7th August 1989.
A28887 1989 Rt Mining Corp Pty Ltd Cardo Bore 1.4% E08/187, Cardo Bore, Annual report for year ending 12th September 1989
A28888 1989 Rt Mining Corp Pty Ltd Red Hill 6.8% E08/185, Red Hill, Annual report for year ending 12th September 1989
A28493 1989 Seltrust Mining Corp Pty Ltd Cane River 39% Exploration Licence 08/175, Cane River, Annual Report, for year ending 7th May 1989.
A24385 1988 Bp Minerals Aust Pty Ltd Cane River 39% Cane River, Annual report for year ending 7 May 1988, E08/175
A25517 1988 Bp Minerals Aust Pty Ltd Red Hill 6.8% Red Hill, Annual report for year ending 12 September 1988, E08/185
A25518 1988 Bp Minerals Aust Pty Ltd Cardo Bore 1.4% Cardo Bore, Annual report for year ending 12 September 1988, E08/187
A12855 1983 Otter Exploration Nl Mount Minnie 8% Mount Minnie Project, Final Surrender Report for the period ending 23/03/1983, TR70/7497H.
A9918 1981 Otter Exploration Nl Mount Minnie 8% Mount Minnie Project, Annual Report for the period 18/04/1980 to 17/04/1981, TR70/7497H.
A8749 1980 Western Mining Corporation Ltd June Hills <1% June Hills Project, Annual Report for the period 19th January 1979 to 18th January 1980, TR70/6925H & 6926H.
A5119 1974 Broken Hill Pty Co Ltd Deepdale <1% Deepdale, [Annual] Report on Exploration TR2031H, 2033H, 2037H, 2303-2305H [TR70/2031 ... 70/2305], for the ye
A3840 1973 Allied Minerals Nl Red Hill 11% Red Hill Project, Non-statutory Report: Progress Report , May 1973, TR70/5709H.
A3997 1973 Allied Minerals Nl Red Hill 8.6% Red Hill Project, Non-statutory Report:Progress Report , May 1973, MC08/193-195, 198-202, 208-217, 227-240,243
A1417 1966 Broken Hill Pty Co Ltd Wilga <1% Wilga Project, Non-statutory Report: Annual & Quarterly Reports for the periods ending 31st December 1966, TR7
A1595 1966 Ashburton Exp Pty Ltd M62/0: Ashburton-Bangemall base metal/as <1% TR2924H Ashburton Exploration Summary Report for 1965. Programme 1966.
A139561 Api Management Pty Ltd West Pilbara <1% API Drillcore Donation
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
2 months · 18 Oct 2026
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 08/1430-I into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 08/1430-I? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.