NextMapsWA TenementsE 08/3064

E 08/3064

LiveExploration LicenceShire of AshburtonAshburton M.F. District
Area
3,410ha
Expires
Sept 2029
in 3 years
WAMEX reports
105
WA median is 53
Report drilling
27
of 105 reports
Ashburton Explore on the live map

Register summary

Holder
Nanjilgardy Resources Pty Ltd
Local government
Shire of Ashburton
Application received
5 Mar 2019
Commenced
23 Sept 2019
Expiry
22 Sept 2029
Term
5 Years (Extended)

Exploration history on this ground

105 historical WAMEX exploration reports intersect E 08/3064: 74 report geochemistry or sampling, 58 include a digital data package.
When this ground was worked · 104 of 105 reports dated
101960s
21970s
91980s
141990s
172000s
442010s
82020s
Most recent reports
ReportYearOperatorProject On this groundTitle
A149512 2025 Nanjilgardy Resources Pty Ltd Wyloo <1% Partial Surrender Report for E08/3336 Wyloo for the period ending 08/05/2025.
A149684 2025 Nanjilgardy Resources Pty Ltd Wyloo <1% Partial Surrender Report for E08/2833 Wyloo Project for the period ending 8/7/2025
A149845 2025 Nanjilgardy Resources Pty Ltd Wyloo 61% Partial Surrender Report for Wyloo E08/3064 for the period ending 08/07/2025
A134333 2023 Woomera Mining Limited Ashburton Wyloo Dome <1% Partial surrender report Wyloo dome E08/2812 for the period ending 22/11/2022.
A137679 2023 Woomera Mining Limited Ashburton Wyloo Dome <1% Wyloo Dome partial surrender report E08/2833 for the period ending 27/09/2023.
100 more reports
A122647 2020 Corona Mining Pty Ltd Nanjilgardy <1% Annual Report for C161/2017 Nanjilgardy Project for the period 23 November 2018 to 22 November 2019, E08/02812
A124303 2020 Fortescue Metals Group Ltd Mount McGrath <1% E08/2792 Mt McGrath Final Surrender Report for the period ending 26/05/2020
A124684 2020 Andromeda Metals Limited Wyloo <1% E 08/2954 Annual Mineral Exploration Report for the Period 1st July 2019 to 30th June 2020
A122125 2019 Corona Mining Pty Ltd Nanjilgardy <1% [C161/2017] Nanjilgardy Final Surrender Report for E08/2866, E47/3480 and E47/3978 for the period 4 October 20
A119047 2019 Corona Mining Pty Ltd Nanjilgardy <1% Annual Report for C161/2017 Nanjilgardy Project for the period 23 November 2017 to 22 November 2018
A120628 2019 Northern Star Resources Ltd Paulsens <1% Paulsens Project C8/2015 Combined Annual Report for the period 1 June 2018 to 31 May 2019
A119131 2019 Rio Tinto Exploration Pty Limited Sandys Bore 85% Sandys Bore Surrender Report Exploration Licence 08/2788 for the period 6 July 2016 to 29 January 2019
A120987 2019 Fmg Resources Pty Ltd Mount McGrath <1% E08/2792 Mount McGrath Annual Report for the period 7 July 2018 to 6 July 2019
A115857 2018 Corona Mining Pty Ltd Nanjilgardy <1% Annual Report for C161/2017 "Nanjilgardy" For the Period 23 November 2016 to 22 November 2017, E08/02812, E08/
A117245 2018 Northern Star Resources Ltd; Fmg Pilbara Pty Ltd Paulsen's <1% Partial Surrender for E47/1773-I Paulsen's Project for the period 8 June 2012 to 7 June 2018
A117361 2018 Rio Tinto Exploration Pty Limited Sandys Bore 85% Sandys Bore E08/02788 Annual Report Exploration Licence 08/2788 (GDSR 6823) For the Period 6 July 2017 to 5 Ju
A118010 2018 Fortescue Metals Group Ltd Mount McGrath <1% E08/2792 (Mt McGrath) Annual Report for the period 07/07/2017 - 06/07/2018
A118294 2018 Corona Mining Pty Ltd Nanjilgardy <1% Partial Surrender Report for E08/2866 and E08/2867 Nanjilgardy Project [C161/2017] for the period 4 October 20
A117287 2018 Northern Star Resources Ltd Paulsen's <1% Combined Annual Report for Paulsen's Project C08/2015 for the period 1 June 2017 to 31 May 2018
A114447 2017 Rio Tinto Exploration Pty Limited Sandys Bore 85% Sandys Bore Annual Report Exploration Licence 08/2788 (GDSR 6634) for the period 6 July 2016 to 5 July 2017
A114609 2017 Fortescue Metals Group Ltd Mount McGrath <1% E08/2792 (Mt McGrath) Annual Report For the Period 7 July 2016 to 6 July 2017
A107994 2016 Northern Star Resources Ltd Kooline <1% Final Mineral Exploration Report for E08/1986 Kooline Project for the period 03/09/2010 to 12/11/2015
A108802 2016 Mamba Resource Management Pty Ltd Wyloo <1% Wyloo 3 Project E08/2131, West Pilbara Mineral Field, Final Surrender Report for the period 05/07/2015 to 11/0
A109530 2016 Northern Star Resources Ltd Paulsens <1% Annual Mineral Exploration Report for the Paulsens Group C8/2015 for the period 01/06/2015 to 31/05/2016
A104523 2015 Northern Star Resources Ltd Paulsens 2.8% Paulsens Project C211/1997 Annual Report for the period 14/11/13 to 13/11/14, E08/1166......P47/1637
A104678 2015 Northern Star Resources Ltd Kooline <1% Kooline Project (C118/2011) Annual Report to the Department of Mines and Petroleum for the period 01/12/13 to
A105341 2015 Fortescue Metals Group Ltd Wyloo <1% Combined Annual Report for the Period 01st January 2014 to 31st December 2014, C39/2013 Wyloo Project E08/1393
A106550 2015 Mamba Resource Management Pty Ltd Wyloo 3 <1% Wyloo 3 Project Annual Report on Mineral Exploration for the period 05/07/2014 to 04/07/2015
A106639 2015 Northern Star Resources Ltd Paulsens 2.8% Annual Mineral Exploration Report for the Paulsens Group C08/2015 for the period 1 June 2014 to 31 May 2015
A106662 2015 Kalamazoo Resources Pty Ltd Paulsens East <1% Paulsens East C17/2015 Combined Annual Report for the period 16/06/2014 to 15/06/2015, E 47/02909, E 47/02910,
A103143 2014 Mamba Resource Management Pty Ltd Wyloo <1% Wyloo 3 Project Annual Report on Mineral Exploration for the period 05/07/2013 – 04/07/2014
A103908 2014 Cullen Exploration Pty Ltd Wyloo <1% Wyloo Project E08/2145 Annual Technical Report for the period 23rd November 2013 to 22nd November 2014
A100751 2014 Northern Star Resources Ltd Paulsens 2.8% Paulsens Project C211/1997 Annual Report to the Department of Mines and Petroleum for the period 14/11/12 to 1
A101828 2014 Cradle Resources Ltd Wyloo <1% Wyloo Project Annual Technical Report for the Period 25th February 2013 – 24th February 2014 for E08/2142
A96905 2013 Northern Star Resources Ltd Metawandy Creek 25% Metawandy Creek Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1187, 1842 &
A97469 2013 Cradle Resources Ltd Wyloo <1% Wyloo Project, Annual Report for the period 25th February 2012 to 24th February 2013, E08/2142.
A98369 2013 Fortescue Metals Group Ltd Wyloo South <1% Partial Surrender Report for the Period 10 February 2006 to 14 March 2013, E47/1649
A99037 2013 Mamba Resource Management Pty Ltd Wyloo 3 <1% Wyloo 3 Project E08/2131 Annual Report for the period 05/07/2012 – 04/07/2013
A100720 2013 Cullen Exploration Pty Ltd Wyloo <1% Wyloo Project E08/2145 Annual Technical Report For the Period: 23rd November 2012 to 22nd November 2013
A101306 2013 Fortescue Metals Group Ltd Wyloo <1% Combined Annual Mineral Exploration Report: C39/2013 “Wyloo” for the period 01st January 2013 to 31st December
A96408 2013 Fortescue Metals Group Ltd Hardey Junction <1% Hardey Junction - C118/2011 Annual report for the period 1 December 2011 to 30 November 2012 E08/1628, E08/162
A93196 2012 Fortescue Metals Group Ltd De Courcy <1% Annual report for the period 1 January 2011 to 31 December 2011 for Reporting Group De Courcy C55/2007, E08/20
A93343 2012 Northern Star Resources Ltd Metawandy Creek 25% Metawandy Creek Project, Annual Report for the period 01/01/2011 to 31/12/2011, E08/1187, 1842 & 1844. [C92/20
A93448 2012 Cradle Resources Ltd Wyloo <1% Wyloo Project Annual Technical Report for the Period 25th February 2011 – 24th February 2012 for E08/2142
A94751 2012 Mamba Resource Management Pty Ltd Wyloo 3 <1% Annual Report For The Period 05 July 2011 To 04 July 2012, Wyloo 3 Project, E08/2131
A97180 2012 Fortescue Metals Group Ltd De Courcy <1% De Courcy Project, Annual Report for the period 1st January 2012 to 31st December 2012, E08/1393, 2000, 2003,
A89367 2011 Fortescue Metals Group Ltd Wyloo <1% Wyloo Project (De Courcy Combined Report) Annual report for the period 1 January 2010 to 31 December 2010, C55
A89373 2011 Northern Star Resources Ltd Metawandy Creek 24% METAWANDY CREEK PROJECT Combined Reporting Group 92/2001 Exploration Licences E08/1187-I, E08/1842, E08/1844,
A86783 2010 Intrepid Mines Ltd Metawandy Creek 14% Metawandy Creek Project, Final Surrender Report for E08/854, Report Period: 22nd April 1996 to 16th April 2010
A85882 2010 Fortescue Metals Group Ltd Wyloo (DE COURCY) <1% Wyloo Project (De Courcy Combined Report) Annual report for the period 1 January 2009 to 31 December 2009 E47
A86181 2010 Intrepid Mines Ltd Metawandy Creek 7.4% METAWANDY CREEK PROJECT ANNUAL REPORT - For the Period 1st January 2009 to 31st December 2009, Combined Report
A86769 2010 Intrepid Mines Ltd Metawandy Creek 42% Metawandy Creek Project, Partial Surrender Report for E08/1187, Report Period: 22 nd February 2007–21st Februa
A81109 2009 Intrepid Mines Ltd METAWANDY CREEK 7.4% METAWANDY CREEK PROJECT, Combined Reporting Group C92/2001 E08/853, E08/854, E08/1187, E08/1191, E08/1842, E08
A81136 2009 Fortescue Metals Group Ltd Wyloo (De Courcy) <1% Wyloo Project (De Courcy Combined Report), Annual report for the period 1 January 2008 to 31 December 2008 E47
A82903 2009 Red Hill Iron Ltd HARDEY <1% HARDEY PROJECT SURRENDER REPORT For E08/1716 14TH February 2008 TO 3rd April 2009
A77587 2008 Fortescue Metals Group Ltd Wyloo - De Courcy <1% WYLOO PROJECT- De Courcy Combined Annual report for the period 1 January 2007 to 31 December 2007. C 55/2007
A78148 2008 Intrepid Mines Ltd Metawandy Creek 7.5% ANNUAL REPORT 1 January 2007 to 31 December 2007 Metawandy Creek Project E08/853, E08/854, E08/1187, E08/1190
A74366 2007 Nustar Mining Corporation Ltd Metawandy Creek 6.8% Metawandy Project C92/2001 Annual Report for the Period 1st Jan 2006 to 31st Dec 2006. (Wyloo)
A71908 2006 Nustar Mining Corporation Ltd Metawandy Creek 4% Annual Report, 1 January 2005 to 31 December 2005, Metawandy Creek Project, 08/853-854, 073, 1096, 1127, 191,
A70170 2005 Nustar Mining Corporation Ltd Metawandy Creek 4% Annual report for the period 01/01/04 - 31/12/04 Metawandy Creek Project, C92/2001, E08/853, E08/854, E08/1073
A68609 2004 Nustar Mining Corporation Ltd Metawandy Creek 2.3% Annual report for the period 01/01/2002-31/12/2003 Metawandy Creek Project E08/1073, E08/1096, E08/1127, E08/
A66899 2003 St Barbara Mines Ltd E08/584 14% Annual Report Exploration Licence E08/854 for the period April 22 2002 to April 22 2003
A64686 2002 Nugold Hill Mines Ltd Hardey 14% Hardey E08/854 Annual Report for tenement E08/854 Period 22/04/2001 to 21/04/2002 Dome Reference Number : M112
A62376 2001 Nugold Hill Mines Nl Hardey 14% Annual Report for tenement E08/854 Period 22/04/2000 to 21/04/2001 Dome Reference Number: M9825/2.
A62283 2001 Min-Tech 8 Nl Wyloo 1.9% Annual Report for the year ended 3rd January 2001 Wyloo Project, E08/827.
A60605 2000 Goldfields Exploration Pty Ltd Wyloo 14% Annual Report for Tenement E08/854, (Wyloo), period 22/04/1999 to 21/05/2000.
A61288 2000 Goldfields Exploration Pty Ltd Wyloo 14% Partial Surrender Report, Wyloo, E08/854,
A59763 2000 Min-Tech 8 Nl Wyloo 1.9% Annual Report E08/827 covering reporting period 04/01/199-03/01/2000. (Wyloo Project).
A60979 2000 Goldfields Exploration Pty Ltd Wyloo 14% Partial Surrender Report Wyloo E08/854 Vol 1/1.
A57544 1999 Min-Tech 8 Nl Wyloo 1.9% Wyloo E08/827 Annual Report for 03/01/1999
A58346 1999 Nugold Hill Mines Nl Hardey 14% Annual Report E08/854 for period 22/04/1998 to 21/04/1999 ( Hardey Project).
A59372 1999 Min-Tech 8 Nl Wyloo 1.9% Partial Surrender Report, Wyloo Project, E08/827, for Surrender Dated 14th July, 1999
A54945 1998 Nugold Hill Mines Nl Hardey 14% Annual Report , Exploration Licence E08/854- Hardey, for the period 22nd April 1997 to 21st April 1998.
A53960 1997 Yinnex Nl Wyloo 1.9% Wyloo (JV) Project, E08/827. Annual Report for the year ending 03/01/1998.
A51470 1997 Nugold Hill Mines Nl Hardey 14% Hardey Project, Annual Report Exploration Licence E08/854, for the period 22nd April 1996 to 21st April 1997.
A41496 1994 Copperfield Gold Nl Snakewood Well <1% Snakewood Well Project, Final Surrender Report for period ending 2nd March 1994, E08/627.
A38904 1993 Newcrest Mining Ltd Wyloo - Woolly Bore, Three Corner Bore 8% Wyloo Project, Final report for 1992, E08/611 - Three Corner Bore, E08/612 - Woolly Bore
A33229 1991 Australian Ores & Minerals Ltd Metawandy 1.5% Metawandy Project, Annual Report for the period 1st January 1990 to 31st December 1990, E08/396.
A31386 1990 Riomin Aust Gold Pty Ltd Eight Mile Bore <1% Eight Mile Bore Project, Annual & Final Surrender Report for the period 20th January 1990 to 1st August,1990,
A33236 1990 Australian Ores & Minerals Ltd Wyloo 13% Wyloo Project, Annual Report for the period October 1989 to October 1990, E08/100. ( Duck Creek JV)
A30011 1990 Rt Mining Corp Pty Ltd Aerial 1.6% Aerial Project, Final Surrender Report for the period 13th September 1989 to 26th January 1990, E08/190.
A30014 1990 Rt Mining Corp Pty Ltd Eight Mile Bore <1% Eight Mile Bore Project, Annual Report for the period 20th January 1989 to 19th January 1990, E08/189.
A31942 1990 Aberfoyle Resources Ltd Wyloo 15% Wyloo Project, Final Surrender Report, August 1990, E08/387
A26542 1989 Billiton Australia Pty Ltd Wyloo 13% Wyloo, First Partial Relinquishment Report, exploration licence 08/100.
A26729 1989 Bp Minerals Aust Pty Ltd Eight Mile Bore <1% Eight Mile Bore, Annual Report, EL08/189, for year ending 19th January 1989.
A26610 1989 Billiton Australia Pty Ltd Wyloo 13% Wyloo, Annual Report, exploration 08/100, 1998.
A28890 1989 Rt Mining Corp Pty Ltd Aerial 1.6% E08/190, Aerial, Annual report for year ending 12th September 1989
A23704 1988 Mr De Angelis M Wyloo 1.4% Wylee Marble Reserves, Report on geology and commercial potential, 1986-1987, E08/69 and E08/89
A22725 1988 Billiton Australia Pty Ltd Wyloo - Mount McGrath Joint Venture 13% Annual report for 1987, E8/100, Wyloo, Ashburton Province
A25519 1988 Bp Minerals Aust Pty Ltd Aerial 1.6% Aerial, Annual report for year ending 12 September 1988, E08/190
A21658 1987 Billiton Australia Pty Ltd Wyloo 13% Wyloo Project, Annual Report for the year ending 31/12/1986, E08/100. [Mt McGrath JV]
A10272 1981 Hamersley Exp Pty Ltd Mount Tom Price 8.9% Mt Tom Price Project, Non-statutory Report :Annual & Relinquishment Reports,[Geology of the Wyloo Anticline],
A3778 1972 Amax Exploration Aust Inc Marana Spring - Mount de Courcey 7.4% Marana Spring - Mount de Courcey Project, Non-statutory Report: A Photogeological Study of the Marana Spring 7
A1291 1970 Electrolytic Zinc Co Wyloo 2.1% Wyloo Project, Final Surrender Report for the period ending 10/08/1970, TR70/4846H.
A1289 1969 Electrolytic Zinc Co Wyloo 2.1% Wyloo Project, Annual Report for the period endng 20/11/1969, TR70/4846H.
A1135 1968 Placer Prospecting Pty Ltd Wyloo Station 2.7% Wyloo Station Project, Final Surrender Report for the period ending 18/09/1968, TR70/4344H; MC08/102; MC47/41
A3341 1967 Westfield Minerals ( W.A.) N.L. Aerial 2.6% Aerial Project, Non-statutory Report:1965 Percussion Drill Hole Locations ( Scale1:100), Core Logs , Hole No
A980 1967 Westfield Minerals Nl Ashburton-Bangemall <1% Ashburton-Bangemall Project, Annual Report [Vol 1} for the year ending 31/12/1966, TR70//2723-2724, 2974, 362
A1595 1966 Ashburton Exp Pty Ltd M62/0: Ashburton-Bangemall base metal/as <1% TR2924H Ashburton Exploration Summary Report for 1965. Programme 1966.
A570 1966 Westfield Minerals Nl Ashburton-Bangemall 1.5% Ashburton-Bangemall Project, Non-statutory Report: Temporary Reserves & Associated Options, Summary Report for
A574 1965 Westfield Minerals Nl Ashburton-Bangemall 1% Ashburton-Bangemall Project, Non-statutory Report: Exploration Report for 1964 & Programme for 1965, TR70/2722
A566 1964 Westfield Minerals Nl Ashburton-Bangemall <1% Ashburton-Bangemall Project, Non-statutory Report: Summary Report for 1963 & Projected Development Programme 1
A1536 1964 Westfield Minerals Nl Ashburton - Bangemall 1.1% Ashburton - Bangemall Project, Non-statutory Report : Miscellaneous Data,1964 & Drilling Data (to accompany A
A567 1963 Westfield Minerals Nl Ashburton-Bangemall 1% Ashburton-Bangemall Project, Non-statutory Report: Report of Operations for 1963, November 1963. TR70/2640, 2
A50698 1753 Yinnex Nl Wyloo 1.9% Wyloo E08/827 Annual report for the year ended 3rd January 1997
Doing your homework on this ground? The register summary above tells you the tenement exists and who holds it. The checks below tell you whether it is clean: what is secured against it, whether it is meeting its minimum expenditure commitment, what conditions attach to it, and how long the current holder has actually had it.

Tenure detail Free account

Current holders & shares
Holder change history
Expenditure history
Conditions & endorsements
Native title context
Combined reporting
Rent status

Tenement intelligence Premium

Time to expiry
3 years · 22 Sept 2029
At-risk & opportunity signals
Expenditure compliance
5-year track record
Spend trend & exploration intensity
Expiry band
Ownership age
Dealings, mortgages & caveats
Transfer history

What does the exploration record say about this ground?

NextMaps reads every WAMEX report over E 08/3064 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.

Open on the map — full register record About AI reports About Tenure Packs

Do you hold E 08/3064? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.

List this tenement
WA Mining Weekly The week's tenement movements, deals and ground released, free to your inbox.

Tenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.