E 15/1853
E 15/1853 is a pending exploration licence in the Shire of Coolgardie, Western Australia, applied for by Karora (Higginsville) Pty Ltd (part of Westgold Resources Limited). The application was received on 15 Oct 2021 and is awaiting a decision. The ground is covered by 145 historical WAMEX reports.
Register summary
- Holder
- Karora (Higginsville) Pty Ltd
- Part of
- Westgold Resources Limited (ASX:WGX) as at 2026-06-30
- Local government
- Shire of Coolgardie
- Application received
- 15 Oct 2021
The full record on E 15/1853
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares, and the one change of holder on record
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (4 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A151804 | 2025 | Dynamic Metals Limited | Widgie (P 15/6112) | 100% | Annual Exploration Report for P 15/6112 - Widgie Project for the period ending 21/09/2025. |
| A151805 | 2025 | Dynamic Metals Limited | Widgie (P 15/6112) | 100% | Annual Exploration Report for P 15/6112 - Widgie Project for the period ending 21/09/2025. |
| A145518 | 2024 | Dynamic Metals Limited; Mineral Resources Limited | Widgie | 100% | Annual Exploration Report for P 15/6112 - Widgie Project for the period ending 21/09/2024 |
| A145835 | 2024 | Argonaut Resources N.L. | Higginsville | <1% | Partial Surrender Report E 15/01489 Higginsville for the period ending 13/08/2023 |
| A133658 | 2023 | Jindalee Resources Limited | Cowan Hill | <1% | Final Surrender Report E 15/1549 Cowan Hill Project for the period ending 07/10/2022 |
140 more reports
| A133660 | 2023 | Jindalee Resources Limited | Railway | <1% | Final Surrender Report Railway E15/1564 for the period ending 09/10/2022 |
| A137501 | 2023 | Dynamic Metals Limited | Higginsville (P 15/06112) | 100% | Annual Report for Prospecting Licence P 15/06112 Higginsville for the period ending 21/09/2023. |
| A132721 | 2022 | Jindalee Resources Limited | Higginsville | 100% | Annual Report for Exploration Licence P 15/6112 Higginsville Project for the period ending 19/10/2022. |
| A128913 | 2021 | Jindalee Resources Limited | Higginsville | 100% | Annual Report for P15/6112 Higginsville Project for the period ending 21/09/2021 |
| A129010 | 2021 | Jindalee Resources Limited | Cowan Hill | <1% | Annual Report E15/1549 Cowan Hill for the period 10 October 2020 to 9 October 2021 |
| A129011 | 2021 | Jindalee Resources Limited | Railway | <1% | Annual Report E15/1564 Railway for the period 10 October 2020 to 9 October 2021 |
| A124313 | 2020 | Argonaut Resources N.L. | Higginsville | <1% | Higginsville Project C86/2017 Annual Report for the period ending 22 May 2020 |
| A125578 | 2020 | Jindalee Resources Limited | Railway | <1% | Annual Report for E15/1564 Railway Project for the period ending 09/10/2020 |
| A125579 | 2020 | Jindalee Resources Limited | Cowan Hill | <1% | Annual Report for E15/1549 Cowan Hill Project for the period ending 09/10/2020 |
| A123936 | 2020 | Jindalee Resources Limited | Higgnisville | 100% | Annual Report Higginsville P15/6246 for the period ending 8/4/2020 |
| A122347 | 2020 | Rnc Minerals | Polar Bear | <1% | Combined Annual Mineral Exploration Report, Polar Bear C104/1995 For the Period 2 October 2018 to 1 October 20 |
| A125017 | 2020 | Avoca Resources Pty Ltd; Avoca Mining Pty Ltd | Higginsville | 4.8% | Annual Exploration Report, C113/2000 Higginsville Project for the period ending 30 June 2020 |
| A125049 | 2020 | Fortescue Metals Group Ltd | Lake Cowan | <1% | Combined Final Surrender Report for P15/6306, P15/6305, P15/6303, P15/6302, P15/6301, P15/6298 & P15/6299 for |
| A125422 | 2020 | Jindalee Resources Limited | Higginsville | 100% | Annual Technical Report P15/06112 Higginsville Project for the period ending 21/09/2020 |
| A120554 | 2019 | Argonaut Resources N.L. | Higginsville | <1% | Higginsville Project Annual Report (C86/2017) for the period 23 May 2018 to 22 May 2019, P 15/06030,E 15/0148 |
| A121805 | 2019 | Jindalee Resources Limited | HIGGINSVILLE | 100% | Annual Report for P15/6112 HIGGINSVILLE project for the period 22 September 2018 to 21 September 2019 |
| A121842 | 2019 | Jindalee Resources Limited | Cowan Hill | <1% | Annual Report for Cowan Hill E15/1549 for the period 10 October 2018 to 9 October 2019 |
| A121870 | 2019 | Jindalee Resources Limited | Railway | <1% | Annual Report for E15/1564 Railway Project for the period 10 October 2018 to 9 October 2019 |
| A118930 | 2019 | Westgold Resources Limited | Polar Bear | <1% | Combined Annual Mineral Exploration Report, Polar Bear C104/1995 For the Period 2 October 2017 to 1 October 20 |
| A119349 | 2019 | Westgold Resources Limited | Higginsville | 100% | Surrender Report P15/5534 Higginsville Project for the period 7 January 2011 to 6 January 2019 |
| A121174 | 2019 | Avoca Resources Pty Ltd; Avoca Mining Pty Ltd | Higginsville | 4.8% | Annual Exploration Report C113/2000 Higginsville Project for the period 1 July 2018 to 30 June 2019 |
| A117167 | 2018 | Westgold Resources Limited | Higginsville | 2.2% | C113/2000 Higginsville Project Surrender Report 2018, P15/5429, P15/5430, P15/5431, P15/5432 and P15/5435 for |
| A117453 | 2018 | Westgold Resources Limited | Higginsville | 4.5% | Annual Exploration Report C113/2000 Higginsville Project For the Period 1 July 2017 to 30 June 2018 |
| A117642 | 2018 | Westgold Resources Limited | Higginsville | <1% | Surrender Report 2018, P15/5433, P15/5434, P15/5437, P15/5438, P15/5439 and P15/5441, Higginsville, 15 July 20 |
| A118146 | 2018 | Jindalee Resources Limited | Cowan Hill | <1% | E15/1549 Cowan Hill Project Annual Report for the period 10/10/2017 - 09/10/2018 |
| A118147 | 2018 | Jindalee Resources Limited | Railway | <1% | Railway Project E15/1564 Annual Report for the period 10 October 2017 to 9 October 2018 |
| A117261 | 2018 | Argonaut Resources N.L. | Higginsville | <1% | Higginsville Project C86/2017 Annual Report for the period 23 May 2017 to 22 May 2018, P15/06030, P15/06031, P |
| A112460 | 2017 | Westgold Resources Limited | Higginsville | 57% | Final Surrender Report E15/838 for the period 28 September 2004 to 27 January 2017 |
| A114752 | 2017 | Westgold Resources Limited | Higginsville | 4.5% | Annual Exploration Report, C113/2000 Higginsville Project for the period 1 July 2016 to 30 June 2017 |
| A109580 | 2016 | Metals X Limited | Higginsville | <1% | Partial Surrender Report E15/828 For the Period 17 November 2014 to 15 July 2016 |
| A109560 | 2016 | Metals X Limited | E15/1281 | <1% | Final Surrender Report E15/1281 for the period 17/08/2011 to 04/08/2016 |
| A109578 | 2016 | Metals X Limited | Lake Cowan | 22% | Final Surrender Report E15/1259 For the Period 11 August 2011 to 2 August 2016 |
| A108325 | 2016 | Metals X Limited | Lake Cowan | <1% | Combined Annual Mineral Exploration Report - Lake Cowan 1 February 2015 to 31 January 2016 |
| A109726 | 2016 | Metals X Limited | Higginsville | 5.4% | C113/2000 Higginsville Combined Annual Technical Report for the period 01/07/2015 to 30/06/2016 |
| A105080 | 2015 | Metals X Limited | Lake Cowan | <1% | Annual Mineral Exploration Report, C125/2000 Lake Cowan Project for the period 1st February 2014 to 31st Janua |
| A106721 | 2015 | Metals X Limited | Higginsville | 4.1% | Higginsville Project C113/2000 Combined Annual Report for the period ending 30th June 2015 |
| A101416 | 2014 | Metals X Ltd | Lake Cowan | <1% | Lake Cowan Project Annual Mineral Exploration Report, C125/2000 Report Period: 1st February 2013 to 31st Janua |
| A103322 | 2014 | Metals X Ltd | Higginsville | 4.1% | Higginsville Project C113/2000 Combined Annual Mineral Exploration Report for the period 1st July 2013 to 30th |
| A97131 | 2013 | Alacer Gold Corporation | Lake Cowan | <1% | Lake Cowan Project, Annual Report for the period 1st February 2012 to 31st January 2013, E15/810, 949, 951, 95 |
| A99046 | 2013 | Alacer Gold Corporation | Higginsville | 4.2% | Combined Annual Technical Report C113-2000 for the Higginsville Gold Project 1 July 2012 to 30 June 2013, E15/ |
| A94737 | 2012 | Alacer Gold Corporation | Higginsville | 4% | Combined Annual Technical Report C113-2000 for the Higginsville Gold Project 1 July 2011 to 30 June 2012 |
| A93175 | 2012 | Alacer Gold Corporation | Lake Cowan | <1% | Combined Annual Technical Report C125/2000 for the Lake Cowan Project 1 February 2011 to 31 January 2012 |
| A95800 | 2012 | Pindan Exploration Company Pty Ltd | Cowan | 9% | Cowan Nickel Project Higginsville Nickel Rights Tenements Annual Report C113/2000 for the period July 1 2011 |
| A91170 | 2011 | Alacer Gold Pty Ltd | Higginsville | 3.6% | Combined Annual Technical Report C113/2000 for the Higginsville Gold Project 1 July 2010 to 30 June 2011 |
| A91264 | 2011 | Alacer Gold Corporation | Higginsville | <1% | Annual Technical Report for Prospecting Licence 15/5437 for the period 15th July 2010 to 14th July 2011. |
| A77596 | 2010 | Dioro Exploration Nl | Lake Cowan | 2.8% | ANNUAL EXPLORATION REPORT LAKE COWAN C125/2000 YEAR ENDING JANUARY 31ST 2008, E15/285, E15/598, E15/605, M15/1 |
| A86533 | 2010 | Dioro Exploration Nl | Lake Cowan | 2.7% | Combined Annual Exploration Report year ending 31st Janauary 2010, Lake Cowan Project C125/2000, E15/598 M15/1 |
| A88197 | 2010 | Avoca Resources Ltd | Chalice | 4.6% | Chalice Project Combined Annual Technical Report C111/2004 E15/740, E15/821, E15/822, E15/828, E15/829, E15/83 |
| A88509 | 2010 | Cazaly Resources Ltd | Higginsville | 43% | Annual and Final Surrender Report Higginsville Project E15/1096 For the Period 13 August 2009 to 22 November 2 |
| A86556 | 2010 | Dioro Exploration Nl | Lake Cowan | 7.1% | Lake Cowan E15/598 Surrender Report 19/03/2007 and 17/11/2009 |
| A87723 | 2010 | Avoca Resources Ltd | Higginsville | 5% | Combined Annual Technical Report C113-2000 for the Higginsville Gold Project 1 July 2009 to 30 June 2010 |
| A81844 | 2009 | Dioro Exploration Nl | LAKE COWAN | 2.7% | COMBINED ANNUAL EXPLORATION REPORT YEAR ENDING 31st JANUARY 2009, LAKE COWAN PROJECT, C125/2000, E15/598, M |
| A84905 | 2009 | Avoca Resources Ltd | Chalice - Higginsville | 6.7% | Annual Technical Report C111/2004, Chalice (and Higginsville) Group Project 1 September 2008 to 31 August 2009 |
| A84250 | 2009 | Avoca Resources Ltd | HIGGINSVILLE | 4.9% | COMBINED ANNUAL TECHNICAL REPORT C113-2000 For the HIGGINSVILLE HGP, Tenements: E15/786, E/15/846, E15/932, M1 |
| A80012 | 2008 | Avoca Resources Ltd | Chalice | 6.7% | ANNUAL TECHNICAL REPORT C111/2004 CHALICE (AND HIGGINSVILLE) GROUP PROJECT |
| A78383 | 2008 | Avoca Resources Ltd | Higginsville | 34% | Annual Exploration Report For the period 26th March 2007 - 25th March 2008 M15/348 |
| A79305 | 2008 | Avoca Resources Ltd | Higginsville | 4.9% | COMBINED ANNUAL TECHNICAL REPORT C113-2000 For the HIGGINSVILLE PROJECT 1 July 2007 to 30 June 2008 Tenements: |
| A75835 | 2007 | Avoca Resources Ltd | Higginsville | 4.7% | Combined Annual Technical Report C113-2000 For the Higginsville Project 1 July 2006 to 30 June 2007 Mineral Fi |
| A76261 | 2007 | South Kal Mines Pty Ltd | Lake Cowan West | 7.1% | Annual Report for the period 6th September 2006 to 5th September 2007 E15/598 Lake Cowan West Project |
| A76319 | 2007 | Chalice Gold Mines Ltd | Chalice | 6.2% | Chalice (and Higginsville) Group Projects Combined Annual Technical Report C111/2004 For E15/740...E63/873, M1 |
| A75491 | 2007 | Barminco Investments Pty Ltd | Higginsville | 34% | Higginsville Gold Project Exploration Report M15/348 25 March 2006 - 24 March 2007 Mining Lease 15/348 |
| A72646 | 2006 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project, Annual Technical Report, 25 March 2004 to 24 March 2005, M15/348, (Widgiemooltha). |
| A73608 | 2006 | Chalice Gold Mines Ltd | Chalice | 6.2% | Chalice(& Higginsville) Group Projects, Combined Annual Technical Report C111/2004, For E15/740....E63/873, M1 |
| A72644 | 2006 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project, Annual Technical Report, 25 March 2002 to 24 March 2003, M15/348, (Widgiemooltha). |
| A72645 | 2006 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project, Annual Technical Report, 25 March 2003 to 24 March 2004, M15/348, (Widgiemooltha). |
| A72647 | 2006 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project, Annual Technical Report, 25 March 2005 to 24 March 2006, M15/348, (Widgiemooltha). |
| A73074 | 2006 | Avoca Resources Ltd | Higginsville | 6.3% | Combined Annual Technical Report C113/2000 for the Higginsville Project, 1 July 2005 to 30 June 2006, (Widgiem |
| A73881 | 2006 | South Kal Mines Pty Ltd | Lake Cowan | 7.1% | E15/598, Annual Report for the Period 6 September 2005 to 5 September 2006, (Lake Cowan Project, Report No. SK |
| A70989 | 2005 | Avoca Resources Ltd | Higginsville | 6.7% | Combined annual technical report C113-2000 For the Higginsville Project (E15/160, M15/225, 289, 31, 325, 338, |
| A71448 | 2005 | Equinox Resources Ltd | Chalice | 6.3% | Cowan Nickel Joint Venture, Annual report 2005 C111/2004, Chalice Tenements Higginsville, (Boorabbin). |
| A69235 | 2004 | Goldfields Australasia Pty Ltd | Higginsville | 2.2% | Annual technical report for the Higginsville Project E15/160, E15/226, E15/265, E15/287, M15/31, M15/225, M15/ |
| A67279 | 2003 | Goldfields Australasia Pty Ltd | Higginsville | 2.2% | Annual Technical Report for the Higginsville JV Project for E15/160,226,265,287, M15/31, 225, 289, 325, 338, 3 |
| A67448 | 2003 | Goldfields Australasia Pty Ltd | Higginsville | <1% | Higginsville Project, Final Surrender Report for the period 14th October 1991 to 22nd September 2003, E15/226 |
| A64687 | 2002 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project Annual Technical Report 25 March 2001- 24 March 2002 Mining Lease 15/348 Widgiemoolt |
| A65512 | 2002 | Gold Fields Australasia Pty Ltd | Higginsville | 2.2% | St Ives Gold Mining Company Pty Ltd Combined Annual Report (C113/2000) For The Higginsville Joint Venture. Rep |
| A63136 | 2001 | Wmc Resources Ltd | Resolute JV | 2.6% | Annual Report (C113/2000) for the Resolute Joint Venture. |
| A61604 | 2001 | Resolute Ltd | Mitchell | 19% | Annual Report Mitchell Project Mining Leases M15/640, M15/64 1 for the period 25 January 1999 to 24 January 20 |
| A61807 | 2001 | Wmc Resources Ltd | Eundynie | 4% | Annual Report for Eundynie Joint Venture mining leases M15/506, M15/580, & M15/597 (C40/2000) (10 June 2000 to |
| A61810 | 2001 | Wmc Resources Ltd | Higginsville | 53% | Annual Report for the Higginsville Joint Venture (C492/1994) mining leases M15/225, M15/289, M15/325, M15/338, |
| A62003 | 2001 | Resolute Ltd | Higginsville | 53% | Annual Report Higginsville Project mining leases M15/225, M15/289, M15/325, M15/338, M15/348, M15/375, M15/528 |
| A62521 | 2001 | Wmc Resources Ltd | Higginsville | 36% | Annual Technical Report For Mining Lease M15/641 For the Period June 9, 2000 to January 24, 2001. |
| A63347 | 2001 | Barminco Pty Ltd | Higginsville | 34% | Higginsville Gold Project Annual Technical Report 25 March 2000 - 24 March 2001 Mining Lease 15/348 Widgiemool |
| A60100 | 2000 | Resolute Ltd | Higginsville | 26% | 3 Year Report, Higginsville 100%, Mining Leases M15/351,352, 732, for the period 01/07/1996 to 30/06/1999. Res |
| A61808 | 2000 | Resolute Ltd | Eundynie | 8.3% | Annual Report Eundynie Project mining leases M15/506, M15/580, M15/597 for the period 01 July 1999 to 9 June 2 |
| A57652 | 1999 | Resolute Ltd | Mitchell | 29% | Mitchell Project - Annual Report M15/638-642, M15/665, M15/765 01/02/97 - 31/01/98 |
| A57945 | 1999 | Resolute Ltd | Mitchell | 29% | Mitchell Project M15/638-642, 665, 765 10/02/98 - 31/01/99 |
| A58409 | 1999 | Resolute Ltd | Vine Joint Venture | 62% | Extended Annual Report, Vine Joint Venture Project M15/610 For the Period 10/12/1996 to 30/06/1999 |
| A58412 | 1999 | Resolute Ltd | Fairplay Prospect | 22% | Extended Annual Report Fairplay Prospect, M15/31 for the Period 1/06/1994 to 30/06/1999 |
| A58524 | 1999 | Resolute Ltd | Higginsville 100% | 18% | Higginsville 100% Annual Report Mining Leases:M15/351-352, 620, Prospecting Licence:P15/2714 for the period 01 |
| A58525 | 1999 | Resolute Ltd | Dry Creek - Eundynie | 5.5% | Dry Creek Project Area - Eundynie - Three Year Report Mining Lease: M15/506-507, 580-581, 597-599, 616-617, 62 |
| A58541 | 1999 | Resolute Ltd | Saturn | 6.1% | Saturn Joint Venture - Extended Annual Report M15/335, 522, 578, 593, 619, 656, 666, 766, 572 01/08/1996 - 31/ |
| A58885 | 1999 | Resolute Ltd | Higginsville | 53% | Annual report Higginsville Project M15/225 M15/289 M15/325 M15/338 M15/348 M15/375 M15/528 for the period 01/0 |
| A54019 | 1998 | Resolute Ltd | Cowan Hill | 2.9% | Annual Project Report ,Cowan Hill, E15/266, M15/615, 810-812, 814, 924, For the period 1st january 1997 to 31s |
| A56785 | 1998 | Resolute Ltd | Cowan HIll | 2.9% | Surrender Report on Cowan Hill E15/266, M15/810-812, M15/814, M15/924 For the Period 19th January 1992 to 28th |
| A57653 | 1998 | Resolute Ltd | Higginsville | 53% | Higginsville Project M15/225, 289, 325, 328, 348, 375, 528 10/07/97 - 30/06/98 |
| A51222 | 1997 | Resolute Ltd | Cowan Hill | 2.9% | Cowan Hill Project, Annual Report E15/266, M15/615,810-812, 814, P15/3119 for the period 19th January 1996 to |
| A51637 | 1997 | Resolute Ltd | Mitchell | 29% | Annual report Mitchell Project M15/638 to M15/642 M15/665 M15/765 for the period 1st Febuary 1996 to 31st Janu |
| A51768 | 1997 | Resolute Ltd | Vine | 62% | Annual report Vine JV Project M15/610 for the period 10th December 1993 to 9th December 1996 Technical Report |
| A47838 | 1996 | Resolute Samantha Ltd | Mitchell Joint Venture | 29% | Mitchell Joint Venture Higginsville Mining Leases M15/638 to M15/642 M15/665 M15/765 for the period 1st Febura |
| A49133 | 1996 | Resolute Samantha Ltd | Dry Creek | 3.6% | Annual report Dry Creek Project Area Eundynie Mining Leases M15/506 M15/507 M15/580 M15/581 M15/598 M15/599 M1 |
| A47103 | 1996 | Resolute Samantha Ltd | Dry Creek | 3.6% | Dry Creek Project Eundynie Mining Leases M15/506 M15/507 M15/580 M15/581 M15/598 M15/599 M15/615 M15/616 and M |
| A47420 | 1996 | Resolute Samantha Ltd | Higginsville | 54% | Annual Progress Report Higginsville C492/194 Mining Leases M15/289 M15/325 M15/338 M15/348 M15/375 M15/528 for |
| A47839 | 1996 | Resolute Samantha Ltd | Cowan Hill | 4.6% | Annual report Cowan Hill Exploration Licence E15/266 Prospecting Licences P15/3119 P15/2968 to P15/2969 P15/29 |
| A46570 | 1995 | Resolute Samantha Ltd | Higginsville | 20% | Annual Report Higginsville 100% Mining Lease M15/351, M51/352, M15/620 Prospecting Lease P15/2714 for the peri |
| A40359 | 1994 | Samantha Gold Nl | Cowan Hill | 4.6% | Annual report for the period 17/07/91-18/01/94 Cowan Hill Project E15/266 P15/2968-2969 P15/2974-2975 P15/3119 |
| A42561 | 1994 | Mr Goodes Le | Higginsville | 100% | Non-statutory Report: Preliminary Geological Report on Mining Lease M15/487, Higginsville Project, Western Au |
| A43067 | 1994 | Samantha Gold Nl | Vine Aquarius | 62% | Technical Report Vine Aquarius Joint Venture Higginsville Mining Lease M15/610 for the period 10/12/91 to 09/1 |
| A43104 | 1994 | Samantha Gold Nl | Mitchell | 29% | Progress Report Mitchell Joint Venture Higginsville Mining and Prospecting Leases M15/638 to M15/642 M15/665 P |
| A39080 | 1993 | Samantha Gold Nl | Dry Creek | 3.6% | Progress Report Dry Creek Joint Venture Eundynie Prospecting Licences P15/1699-1710,P15/1712-1717,P15/1749,P15 |
| A33344 | 1991 | Samantha Gold Nl | Higginsville | 100% | Samantha Gold NL. Higginsville Project Report on Prospecting Licence P15/2714 03/1991 Technical Report No: |
| A30592 | 1990 | Samantha Gold Nl | Higginsville | 24% | Samantha Gold NL Higginsville Project M15/351 M15/352 Technical Report No:320 (1990) |
| A31686 | 1990 | Samantha Gold Nl | Higginsville | 51% | Higginsville Project; 09/89 - 08/90 M15/348,338,375,225,325,326,289,351,352,508,31 Report No:325 |
| A27603 | 1989 | Rgc Exploration Pty Ltd | Cowan Hill - Cowan Hill S.W. | <1% | Cowan Hill - Cowan Hill S.W. Project[s] Final Surrender Report for the period 24/07/1985 to 16/12/1990, E15/1 |
| A27815 | 1989 | Samantha Exploration Nl | Higginsville | 24% | Australia JV. Higginsville Project. Annual Technical Report. M15/351,352. 02/05/88-01/05/89. |
| A28587 | 1989 | Samantha Exploration Nl | Higginsville | 53% | Higginsville Project 09/88-08/89 Tenements M15/348 M15/338 M15/375 M15/225 M15/325 M15/326 P15/326 M15/289 |
| A34772 | 1988 | Eldorado Resources Nl | Polar Bear | 2.2% | Polar Bear Project, Non-statutory Report: Gold exploration Targets in the Polar Bear Peninsula Area, August 19 |
| A20245 | 1987 | Roebuck Resources Nl | Baker- Burbanks | 100% | Baker- Burbanks (JV) Project, Non-statutory Report: a Progress Report, March 1987 (P15/287 to P15/295) |
| A21010 | 1987 | Samantha Exploration Nl | Higginsville | 52% | Progress Report Higginsville Joint Venture Coolgardie Mineral Field (M15/66 P15/513 to P15/519 P15/530 to P15/ |
| A23639 | 1987 | Bp Minerals Aust Pty Ltd | Spargoville | 74% | Spargoville Project, Annual Report for the year ending 31st December 1987, M15/337-338;P15/831-841. |
| A19214 | 1986 | Samantha Exploration Nl | Higginsville | 13% | Higginsville Gold Prospect P15/514 P15/515 O15/519 P15/544 P15/1331 Progress Report Technical Report No. 289 ( |
| A15213 | 1985 | Samantha Exploration Nl | HIGGINSVILLE | 3.3% | HIGGINSVILLE JOINT VENTURE,BREAKAWAY PROSPECT, Pl5-743 FINAL REPORT |
| A15116 | 1985 | Samantha Exploration Nl | Higginsville | 35% | Higginsville Gold Exploration Project Progress Report August 19848 Technical report NO. 209 (M15/31 M15/66 P15 |
| A15118 | 1985 | Samantha Exploration Nl | Higginsville | 3.8% | Higginsville Gold Project Sons of Erin Joint Venture Progress Report December 1984 Technical Report No. 231 (G |
| A16421 | 1985 | Samantha Exploration Nl | Higginsville | 21% | Higginsville Gold Project P15/558 P15/559 P15/560 P15/561 Final Report Technical Report No. 257 |
| A16719 | 1985 | Samantha Exploration Nl | Higginsville | 19% | A Review of the Higginsville Joint Venture October, 1985 (M15/31 M15/66) Technical Report No. 274 |
| A5905 | 1975 | Union Miniere Dev & Mining Corp Ltd | Widgiemooltha | <1% | Widgiemooltha [JV] Project, Non-statutory Report: Final Report for the period to 31st December 1974, MC15/139 |
| A4465 | 1974 | Anaconda Aust Inc | Widgiemooltha | 1.5% | Widgiemooltha (JV) Project, Annual Report for the period ending 31/12/1973, MC15/139.......MC15/4188; MC63/96. |
| A433 | 1971 | Anaconda Aust Inc | Norseman | <1% | Annual report 1970 Temporary Reserves Nos 3508H & 5318H. |
| A20084 | 1971 | Carpentaria Exp Co Pty Ltd | Roper | 8.1% | Final Surrender Report, Roper, June 1971, MC15/326 - 349. |
| A93 | 1970 | International Nickel Aust Ltd | Yilmia | <1% | International Nickel Australia Ltd Annual Report Mineral Claims 1012-1058, 1994 Yilmia Group Coolgardie Goldfi |
| A40 | 1970 | Anaconda Aust Inc | Widgiemooltha/Mount Eaton/West Wannaway | <1% | Annual report 1969 on TR 3508 |
| A348 | 1968 | Anaconda Aust Inc | Norseman | <1% | Annual Report, 1967 on Temporary Reserve No. 3508 |
| A345 | 1966 | Anaconda Aust Inc | Norseman | <1% | Annual report, 1966 on Temporary Reserve No. 3508. |
| A347 | 1966 | Anaconda Aust Inc | Norseman Temporary Reserve 3508 | <1% | Geology of the Mount Thirsty - Hayes Hill area TR3508 Norsemand WA |
| A351 | 1753 | Anaconda Aust Inc | Norseman | <1% | Annual Report, 1968 on Temporary Reserve No. 3508. |
| A80316 | 1753 | Dioro Exploration Nl | LAKE COWAN WEST | 7.1% | PARTIAL SURRENDER REPORT E15/598 LAKE COWAN WEST, FOR THE PERIOD 6/9/2005 to 5/9/2008 |
| A26045 | 1753 | Samantha Exploration Nl | Higginsville | 53% | Higginsville Project - Coolgardie Mineral Field 09/87-10/88 Tenements M15/348 M15/338 M15/375 M15/225 M15/325 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
| A43022 | 1753 | Samantha Gold Nl | Dry Creek | 3.6% | Annual report Dry Creek Project area Eundynie Mining Leases M15/506 M15/507 M15/580 M15/581 M15/598 M15/599 M1 |
| A43102 | 1753 | Samantha Gold Nl | Higginsville | 46% | Progress Report Higginsville Mining Leases M15/31 M15/225 M15/289 M15/325 M15/348 M15/351 M15/352 M15/375 M15/ |
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 15/1853 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 15/1853? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-08. Compiled by NextMaps. Verify against primary sources before reliance.