E 16/598
Register summary
- Holder
- Ashcroft Resources Pty Ltd
- Local government
- Shire of Coolgardie
- Application received
- 10 Dec 2021
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A152928 | 2025 | Gold Tiger Resources (Australia) Limited | Credo | 100% | Final Surrender Report for E16/449 Credo Project for the period ending 10/10/2025 |
| A143809 | 2024 | Lithgold Minerals Ltd | Ida Fault | <1% | Ida Fault Project, E16/515 Final Report for the period 5 August 2019 to 26 June 2024 |
| A130141 | 2022 | Gold Tiger Resources (Australia) Limited | Credo | 73% | Surrender Report For E16/415 & E16/457 Credo Project for the period ending 10/12/2021. |
| A133190 | 2022 | Ora Banda Mining | Lady Ida | <1% | E16/483 and E16/487 Partial Surrender Lady Ida for the period ending 7/11/2022 |
| A130111 | 2022 | Gold Tiger Holdings (Australia) Pty Ltd | Credo | 100% | Final Surrender Report for E16/365 & M16/524 Credo Project for the period ending 10/12/2021. |
146 more reports
| A132634 | 2022 | Lithgold Minerals Ltd | Ida Fault | <1% | Ida Fault Project, E16/515 Annual Report for the period 5 August 2021 to 4 August 2022 |
| A128692 | 2021 | Origin Gold Mines Limited | Ida Fault | <1% | Annual Mineral Exploration Report For E16/515 Ida Fault Project for the period ending 04/08/2021 |
| A125399 | 2020 | Gold Tiger Resources (Australia) Pty Ltd | Credo | 52% | Credo Project C03/2013 Combined Annual Technical Report 01/07/19 to 30/06/2020 |
| A125503 | 2020 | U-Beaut Gold Mines Pty Ltd | Dunnsville | <1% | Dunnsville Project P16/3198 Annual Report for the period ending 26/08/2020 |
| A125506 | 2020 | Gold Tiger Resources (Australia) Pty Ltd | Credo | 54% | Partial Surrender E16/457 Credo Project for the period ending 03/09/2020 |
| A125537 | 2020 | Origin Companies Pty Ltd | Credo | <1% | Credo Project E16/515 Annual Technical Report for the period ending 04/08/2020 |
| A123040 | 2020 | Ora Banda Mining Limited | Davyhurst D | <1% | Lady Ida Annual Report C212/2017 (Davyhurst D) for the period 1 January 2019 to 31 December 2019 |
| A124095 | 2020 | O'Farrell D | Yarmany | <1% | 2020 Annual Technical Report for E16/510 Yarmany Project for the period ending 6 March 2020 |
| A119473 | 2019 | Eastern Goldfields Limited | Lady Ida | <1% | Lady Ida Annual Report - C212/2017 for the period 1 January 2018 to 31 December 2018, E16/00337, E16/00344, E1 |
| A120462 | 2019 | Eastern Goldfields Limited | Lady Ida | <1% | Lady Ida Partial Surrender Report for the period 2 May 2016 to 5 April 2019, E16/00480, E16/00482, E16/00483, |
| A121254 | 2019 | Tanvanth Sandhu Singh | Credo | 52% | Credo Project C03/2013 Combined Annual Tenement Report 01/07/18 to 30/06/2019.E 16/00365,E 16/00393,E 16/00396 |
| A117754 | 2018 | Sandhu, Ts | Credo | 52% | Combined Annual Tenement Report 1/07/2017 to 30/06/2018, Credo, C3/2013 |
| A115745 | 2018 | Eastern Goldfields Limited | Lady Ida | <1% | C212/2017 Lady Ida E16/482 and E16/483 Annual Report For the Period 7 November 2016 to 6 November 2017 |
| A116104 | 2018 | Eastern Goldfields Limited | Lady Ida | <1% | Lady Ida Combined Reporting Group C212/2017 Annual Report for the period 1 January 2017 to 31 December 2017, E |
| A116585 | 2018 | Matsa Resources Limited | Dunnsville | <1% | Combined Annual Report C196/2007 Dunnsville Project for the period 01 February 2017 to 31 January 2018 |
| A117162 | 2018 | Matsa Resources Limited | Dunnsville | <1% | E16/294 Dunnsville Final Surrender Report for the period 16/01/2004 - 07/05/2018 |
| A117651 | 2018 | Matsa Resources Limited | Dunnsville | <1% | Final Surrender Report for E16/390, Dunnsville Project, 08 March 2010 - 23 July 2018 |
| A114138 | 2017 | Matsa Resources Limited | Dunnsville | <1% | Dunnsville Project Mineral Exploration Report [C196/2007] for the period 01/02/2016 to 31/01/2017, E16/00294, |
| A114446 | 2017 | Matsa Resources Limited | Dunnsville | <1% | Final Surrender Report E16/362 (Dunnsville) for the period 13 August 2009 to 5 May 2017 |
| A114550 | 2017 | Hawkins Mining | Slattery Dam | <1% | Annual Mineral Exploration Report on the Slattery Dam Project E16/00437 for the period 28 June 2016 to 27 June |
| A114704 | 2017 | Hawkins Mining | Slattery Dam | <1% | Royalties for Regions Co-funded Government Industry Round 13 Drilling Programme 2016-2017 Slattery Dam Project |
| A114893 | 2017 | Higgins R A | Slattery Dam | <1% | Royalties for Regions Co-funded Government Industry Round 13 Drilling Program 2016-2017 P16/2810 (Slattery Dam |
| A108366 | 2016 | Matsa Resources Limited | Dunnsville | <1% | Dunnsville Project Combined Mineral Exploration Report |
| A110013 | 2016 | Sandhu, Ts | Credo | 52% | Combined Annual Tenement Report Credo Project C3/2012 For the Period 1 July 2015 to 30 June 2016, E16/00393, E |
| A105522 | 2015 | Matsa Resources Limited | Dunnsville | 2.5% | Combined Annual Report Dunnsville Project C196/2007 for the period 1st February 2014 – 31st January 2015, E16/ |
| A106486 | 2015 | Matsa Resources Limited | Dunnsville | <1% | Partial Surrender Report E16/362 Dunnsville for the period 13/08/2009 to 24/06/2015 |
| A106493 | 2015 | Matsa Resources Limited | Dunnsville | <1% | Dunnsville E16/390 Partial Surrender Report For the Period 8 March 2010 to 24 June 2015 |
| A106945 | 2015 | Singh B | Credo | 52% | Credo Project C03/2002, E16/393, E16/365, E16/396, E16/415, E16/449, E16/457, E16/458, M16/524, P16/2667 Annua |
| A106992 | 2015 | Matsa Resources Limited | Dunnsville | <1% | Final Surrender Report E16/407 Dunnsville Project for the period 05/04/2011 to 23/06/2015 |
| A107008 | 2015 | Matsa Resources Limited | Dunnsville | 50% | Final Surrender Report E16/297 Dunnsville Project for the period 21 August 2006 to 23 June 2015 |
| A107050 | 2015 | Matsa Resources Limited | Dunnsville | <1% | Final Surrender Report Dunnsville E16/399 For the Period 10 January 2011 to 23 June 2015 |
| A100564 | 2014 | Metaliko Resources Ltd | Frances Lesley | 39% | Surrender report for the period 27 March 2008 to 13 November 2013, Frances Lesley Project, E16/335 |
| A101142 | 2014 | Swan Gold Mining Ltd | Lady Ida | <1% | Lady Ida Project, Annual Report for the period 01/01/2013 to 31/12/2013, E16/252, 327, 332, 337, 344, 347, 355 |
| A102052 | 2014 | Matsa Resources Ltd | Dunsville | 2.6% | Combined Annual Report Dunnsville Project C196/2007 for the period 1st February 2013 – 31st January 2014, E16/ |
| A102594 | 2014 | Swan Gold Mining Ltd | Lady Ida | <1% | Surrender Report Lady ida Project E16/400, E16/412, P16/2502, P16/2503, P16/2504, P16/2505, P16/2506, P16/2507 |
| A103136 | 2014 | Sandhu, Ts | Credo | 52% | C3/2013 Annual Exploration Report Credo Project for the period 09/12/2013 to 08/12/2014, E16/393, 365, 396, 41 |
| A96374 | 2013 | Matsa Resources Ltd | Big Red | <1% | Dunnsville Gold Project Diamond Drilling Big Red Prospect September 2012 (EIS Application DAG2012/00040052) (R |
| A97085 | 2013 | Swan Gold Mining Ltd | Lady Ida | <1% | LADY IDA PROJECT Mineral Exploration Report for the period 1/01/2012 – 31/12/2012 C59/2008, E16/252.....P16/25 |
| A97645 | 2013 | Sandhu, Ts | Credo | 100% | E16/415 Annual Exploration Report for the period 28/03/2012-27/03/2013 |
| A97740 | 2013 | Metaliko Resources Ltd | Frances Lesley | 39% | Annual report for the period 1 January 2012 to 8 January 2013, Frances Lesley Project, E16/335 |
| A97843 | 2013 | Matsa Resources Ltd | Dunnsville | 2.6% | Dunnsville Project, Annual Report for the period 1st February 2012 to 31st January 2013, E16/294, 296, 297, 36 |
| A99166 | 2013 | Sandhu, Ts | Credo | 52% | C3/2013 Annual Exploration Report Credo Project E16/365, E16/393, E16/396, E16/415, M16/524 and P16/2667 Repor |
| A93570 | 2012 | Matsa Resources Ltd | Dunnsville | 2.9% | Combined Annual Report Dunnsville Project C196/2007 for the period 1st February 2011 – 31st January 2012, E16/ |
| A93551 | 2012 | Metaliko Resources Ltd | Frances Lesley | 33% | Annual report for the period 9 January 2011 to 8 January 2012, Frances Lesley Project, C271/2011, E16/292 & E1 |
| A94450 | 2012 | Nex Metals Exploration Ltd | Bullabulling | 100% | Bullabulling E16/333 Eastern Gold Fields Final Surrender Report |
| A90072 | 2011 | Matsa Resources Ltd | Dunnsville | 9.4% | Dunnsville Project, Annual Report for the period 1st February 2010 to 31st January 2011, E16/294, E16/296-297, |
| A91912 | 2011 | Matsa Resources Ltd | Dunnsville | <1% | Annual Report Dunnsville Project E16/362 13th August 2010 – 12th August 2011 |
| A86072 | 2010 | Heron Resources Ltd | Dunnsville | 33% | Annual Report for the period 1 January 2009 to 31 December 2009, Dunnsville Project, C125/2008, E16/292, E16/3 |
| A88457 | 2010 | Matsa Resources Ltd | DUNNSVILLE | <1% | ANNUAL REPORT DUNNSVILLE PROJECT 16/362 13th August 2009 – 12th August 2010 |
| A88458 | 2010 | Matsa Resources Ltd | DUNNSVILLE | 50% | PARTIAL SURRENDER REPORT DUNNSVILLE PROJECT E16/297 21st August 2006 – 17th August 2010 |
| A85733 | 2010 | Matsa Resources Ltd | Dunnsville | 50% | Partial Surrender Report Dunnsville Project E16/297 21 August 2006 - 12 November 2009 |
| A85759 | 2010 | Gbs Gold Australia Pty Ltd | Credo | <1% | Partial Surrender Report Credo Project E16/301 |
| A86075 | 2010 | Heron Resources Ltd | Dunnsville | 12% | Partial surrender report for the period 9 January 2006 to 8 January 2010, Dunnsville Project, E16/292 |
| A86565 | 2010 | Matsa Resources Ltd | Dunnsville | 6.5% | Combined Annual Report Dunnsville Project C196/2007 E16/259 E16/296 M16/487 E16/294 E16/297, 1st February 2009 |
| A87648 | 2010 | Gbs Gold Australia Pty Ltd | Credo | <1% | Surrender Report Credo Project E16/301 |
| A80659 | 2009 | Vale Exploration Pty Ltd | DUNNSVILLE | 12% | DUNNSVILLE PROJECT C125/2008, TENEMENT: E16/292, PARTIAL SURRENDER REPORT, Kalgoorlie Primary Number 2171, blo |
| A81592 | 2009 | Matsa Resources Ltd | DUNNSVILLE | 4.3% | COMBINED ANNUAL REPORT DUNNSVILLE PROJECT, C196/2007, 1st February 2008 – 31st January 2009 |
| A77878 | 2008 | Pioneer Nickel Ltd | Ida Fault | <1% | EXPLORATION LICENCE 16/269 MOUNT IDA PROSPECT SURRENDER REPORT For the Period 6th December 2004 to 5th Decembe |
| A78255 | 2008 | Gbs Gold Australia Pty Ltd | Credo | <1% | ANNUAL EXPLORATION REPORT CREDO PROJECT C66/2005 For Period Ending 28 February 2008 Tenements: E16/218, E16/23 |
| A80495 | 2008 | Vale Inco Australia Limited Partnership | Dunnsville | 33% | COMBINED ANNUAL REPORT FOR THE PERIOD 9 JANUARY 2008 - 31 DECEMBER 2008, C125/2008 |
| A77188 | 2008 | Monarch Gold Mining Company Ltd | Davyhurst | <1% | DAVYHURST PROJECT Reporting Group C189/2007 Report Type: Annual Technical Report Report Period: 2 November 200 |
| A77358 | 2008 | Inco Resources (Australia) Pty Ltd | Dunnsville | 12% | TENEMENT: E16/292 COOLGARDIE MINERAL FIELD KUNANALLING DISTRICT 16 ANNUAL REPORT FOR THE PERIOD 9 JANUARY 2007 |
| A78167 | 2008 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | 4.6% | COMBINED ANNUAL REPORT DUNNSVILLE PROJECT C196/2007 1ST FEBRUARY 2007 - 31ST JANUARY 2008 |
| A78531 | 2008 | Dioro Exploration Nl | Credo | 99% | Credo Project, Annual Report for the year ending 12th May 2008, E16/251. |
| A80179 | 2008 | Dioro Exploration Nl | Credo | 99% | SURRENDER REPORT FOR THE PERIOD 13 MAY 2005 12 MAY 2008 |
| A74518 | 2007 | Ramelius Resources Ltd | Ida Fault | <1% | Annual Report, E16/269, Period 6 December 2005 to 5 December 2006, (Ida Fault Project, Kalgoorlie). |
| A74785 | 2007 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | Annual Report, Dunnsville Project E16/293 17 January 2006 - 16 January 2007 |
| A75292 | 2007 | Gbs Gold Australia Pty Ltd | Credo | <1% | ANNUAL EXPLORATION REPORT CREDO PROJECT C66/2005 Tenements: E16/218, E16/230, E16/237, E16/257, E16/274, E16/2 |
| A75549 | 2007 | Gbs Gold Australia Pty Ltd | Credo | <1% | Annual Exploration Report Credo Project C66/2005 Tenements: E16/218, E16/230, E16/237, E16/253, E16/289, P16/2 |
| A77935 | 2007 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | PARTIAL SURRENDER REPORT DUNNSVILLE PROJECT E16/293 16 JANUARY 2004 - 12 OCTOBER 2007 |
| A74031 | 2007 | Gbs Gold Australia Pty Ltd | Credo | <1% | Annual Exploration Report, Credo Project E16/301, For Period 7 September 2005 to 6 September 2006, (Kalgoorlie |
| A74590 | 2007 | Inco Australia Ltd | Dunnsville | 12% | E16/292, Annual Report for the Period 9 January 2006 to 8 January 2007, (Kalgoorlie). |
| A74784 | 2007 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | Annual Report, Dunnsville Project, E16/294 17 January 2006 - 16 January 2007 |
| A76731 | 2007 | Gbs Gold Australia Pty Ltd | Credo | <1% | ANNUAL EXPLORATION REPORT CREDO PROJECT E16/301 For reporting period 7th September 2006 to 6th September 2007 |
| A77301 | 2007 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | 50% | ANNUAL REPORT DUNNSVILLE PROJECT E16/297 21 AUGUST 2006 - 20 AUGUST 2007 |
| A79797 | 2007 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | PARIAL SURRENDER REPORT DUNNSVILLE PROJECT E16/294 16th January 2004 – 13th October 2007 |
| A71749 | 2006 | Avoca Resources Ltd | Ida Fault | <1% | Annual Report, Exploration Licence 16/269 Coolgardie Mineral Field Western Australia, Reporting Period 6 Decem |
| A72582 | 2006 | Gbs Gold Australia Pty Ltd | Credo | <1% | C66/2005 Annual Exploration Report Credo Project, E16/218, 230, 237, 253, 289, & P16/2185, and P24/3794, For P |
| A72724 | 2006 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | Annual Report, Dunnsville Project E16/293, 17 January 2004 to 16 January 2005, (Kalgoorlie). |
| A73292 | 2006 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | Annual Report, Dunnsville Project E16/294, 17 January 2005 to 16 January 2006, (Kalgoorlie). |
| A73294 | 2006 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | Annual Report, Dunnsville Project E16/293, 17 January 2005 to 16 January 2006, (Kalgoorlie). |
| A73295 | 2006 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | Annual Report, Dunnsville Project E16/294, 17 January 2004 to 16 January 2005, (Kalgoorlie). |
| A73338 | 2006 | South Kal Mines Pty Ltd | Credo | 99% | Credo Project E16/251, Annual Report for the Period 13 May 2005 to 12 May 2006, (SKM Report No. SKM_TL_X2445, |
| A70328 | 2005 | Siberia Mining Corporation Ltd | Lady Ida East | 56% | Lady Ida East Project, E16/226, Annual technical report, 26/02/04 - 25/02/05, (Kunanalling mineral field, Kalg |
| A70332 | 2005 | Terra Gold Mining Ltd | Credo | <1% | Annual report, Credo Project, E16/218, E16/230, E16/237, E16/253, E16/289, and P16/2185, P24/3794, From 7 Jan |
| A73296 | 2005 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | Annual Report, Dunnsville Project E16/293, 17 January 2004 to 16 January 2005, (Kalgoorlie). |
| A68084 | 2004 | Placer Dome Asia Pacific Ltd | Blister Dam | 30% | Blister Dam JV project, Annual Report 03/10/2002-02/10/2003, C187/2001 |
| A64980 | 2002 | Auriongold Exploration Pty Ltd | Credo | 2.2% | Credo Project Annual Report 28/04/2001 - 27/04/2002 C100/2001. Tenement/s P16/2042, E16/176, 183, 185-187, 200 |
| A65157 | 2002 | Auriongold Exploration Pty Ltd | Credo | 3.3% | Credo Project Surrender Report 03/04/2000 - 09/08/2002 E16/176, 200, 208, 210, E30/223-224, 229 Mineral Field |
| A65488 | 2002 | Placer Dome Asia Pacific Ltd | Blister Dam | 39% | BLISTER DAM PROJECT ANNUAL REPORT FOR THE PERIOD 02/10/2001 to 01/10/2002 ON TENEMENTS E16/181, E16/195 DEPART |
| A62710 | 2001 | Delta Gold Ltd | Lady Ida | 3.8% | Lady Ida Project E16/84 and 85 Annual Report 24 January 1992 to 23 January 2001 E16/89 Surrender Report 14 Dec |
| A63824 | 2001 | Heron Resources Ltd | Blister Dam | 39% | BLISTER DAM PROJECT DUNNSVILLE AND CARBINE PROSPECT E16/181 & E16/195 COOLGARDIE MINERAL FIELD COMBINED ANNUAL |
| A63951 | 2001 | Centaur Mining & Exploration Ltd | Doyles Dam | 4% | Joint Annual Report for the period 18 February 2000 to 17 February 2001 C276/1997 - Doyles Dam prospecting lic |
| A61496 | 2000 | Mr Laurie J | Top Dam | 43% | Top Dam Project, (E16/124) Annual Report 1999 - 2000 and Final Surrender Report |
| A59886 | 2000 | Coolgardie Gold Nl | Kangaroo Plains | <1% | Surrender Report Exploration Licence 16/130 Kangaroo Plains |
| A60211 | 2000 | Delta Gold Ltd | Lady Ida | 3.4% | Lady Ida Project, Annual Report, 02/1999 to 01/2000, E16/84, 85,89,109-112,115, E15/503, M16/261-264. |
| A60559 | 2000 | Delta Gold Ltd | Dunnsville | 18% | Annual technical Report Dunnsville Joint Venture 24/05/1999 to 23/05/2000 Tenements E16/90,P16/1534,P16/1535. |
| A61482 | 2000 | Delta Gold Ltd | Dunnsville North | 76% | Dunnsville North Project, (E16/95) Annual/Final Report 1999 - 2000 |
| A58084 | 1999 | Delta Gold Ltd | Lady Ida | 3.4% | Delta Gold NL - Lady Ida Project 01/1998 - 01/1999 E16/89, 115, 84, 85, 109-112, E15/503 |
| A57061 | 1999 | Delta Gold Ltd | Ida Fault | 76% | Ida Fault Project (E16/95- Paladin) Annual Report 1997 - 1998. |
| A58289 | 1999 | Coolgardie Gold Nl | Top Dam | 43% | Annual Report E16/124 for period 26/03/1998 to 25/03/1999 (Top Dam Project). |
| A58807 | 1999 | Coolgardie Gold Nl | Top Dam | 43% | Top Dam Project, (E16/124) Surrender Report for the period 26/03/1996 to 25/03/2000. |
| A59017 | 1999 | Delta Gold Ltd | Dunnesville gold exploration | 18% | Annual Technical Report for Dunnsville Joint Venture 24/05/1998 to 23/05/1999 Tenements E16/90,P16/1534,P16/15 |
| A59440 | 1999 | Delta Gold Ltd | Lady Ida | 76% | Lady Ida Project, Annual Report for E16/95, Dunnsville North 24 November 1998 to 23 November 1999 . |
| A53302 | 1998 | Eden Creek Pty Ltd | Dunnsville | 76% | Dunnsville Project, (E16/95) Annual Report 1996 - 1997 |
| A53590 | 1998 | Eden Creek Pty Ltd | Dunnsville | 8.2% | Partial Surrender Report on Exploration Licence E16/96 Dunnsville Western Australia covering the period 30 Dec |
| A55208 | 1998 | Delta Gold Ltd | Ida Fault | 76% | Ida Fault Project (E16/95) Partial Surrender Report for the period 24/11/1993 to 30/06/1998. |
| A55544 | 1998 | Delta Gold Ltd | Ida Fault | 18% | Ida Fault Project Annual Report for E16/90,P16/1534-1535 Dunnsville Joint Venture 24/05/1997 to 23/05/1998 |
| A53591 | 1998 | Eden Creek Pty Ltd | Dunnsville | 8.2% | Dunnsville Project, (E16/96) Annual Report 1996 - 1997 |
| A54539 | 1998 | Delta Gold Ltd | Ida Fault | 1.8% | Ida Fault Project. Combined annual report for the period 01/02/97-31/01/98. E15/279-280,316,325,387. E16/84-85 |
| A54775 | 1998 | Coolgardie Gold Nl | Top Dam | 43% | Annual Report E16/124,Top Dam Project, for the period 26/03/1997 to 25/03/1998. |
| A55207 | 1998 | Delta Gold Ltd | Ida Fault | 19% | Ida Fault (JV) Project, Partial Surrender Report for the period 24/05/1993 to 30/06/1998, E16/90. |
| A56723 | 1998 | Coolgardie Gold Nl | Dunnsville | <1% | Kangaroo Plains (E16/130) Annual Report for the Period 27/09/1997 - 26/09/1998 |
| A50054 | 1997 | Eden Creek Pty Ltd | Dunnsville | 76% | Dunnsville Project, (E16/95) Annual Report 1995 - 1996 |
| A50302 | 1997 | Eden Creek Pty Ltd | Dunnsville | 8.2% | Dunnsville Project, (E16/96) Annual Report for 1995 - 1996 |
| A50850 | 1997 | Delta Gold Ltd | Ida Fault | 1.9% | Ida Fault Project Combined Annual Report for the period 1st February 1996 to 31st January 1997 Tenements E16/8 |
| A51308 | 1997 | Coolgardie Gold Nl | Top Dam | 43% | Top Dam Project, (E16/124) Annual Report 1996 - 1997 |
| A52523 | 1997 | Coolgardie Gold Nl | Kangaroo Plains | <1% | Kangaroo Plains Project, (E16/130) Annual Report 1996 - 1997 |
| A46942 | 1996 | Eden Creek Pty Ltd | Dunnsville | 76% | Dunnsville Project, (E16/95) Annual Report 1994 - 1995. |
| A47205 | 1996 | Eden Creek Pty Ltd | Dunnsville | 8.2% | Dunnsville Project, (E16/96) Annual Report 1994 - 1995. |
| A48086 | 1996 | Coolgardie Gold Nl | Slattery Dam | <1% | Slattery Dam Project, Annual Report for the period 29/05/1995 to 28/05/1996, E16/76. |
| A47876 | 1996 | Delta Gold Ltd | Ida Fault | 1.9% | Ida Fault Project Combined Annual report for the period 1st February 1995 to 31st January 1996 Tenements E16/8 |
| A48366 | 1996 | Herald Resources Ltd | Dunnsville | 18% | Dunnsville Project E16/90 P16/1534 & P16/1535 Annual Report for Year Ending 23/05/1996 |
| A46816 | 1995 | Delta Gold Ltd | Nugget Dam | 1.7% | Partial Surrender Report for the period 24/01/94-23/01/95 Nugget Dam Project E16/84 |
| A43499 | 1995 | Eden Creek Pty Ltd | Dunnsville | 76% | Dunnsville Project, (E16/95) Annual Report for theperiod 24/11/1993 to 23/11/1994. |
| A43724 | 1995 | Eden Creek Pty Ltd | Dunnsville | 8.2% | Dunnsville (E16/96) Annual Report 1993 - 1994 |
| A44698 | 1995 | Coolgardie Gold Nl | Slattery Dam | <1% | Partial Surrender Report for the period 28/05/95 Slattery Dam Project E16/76 |
| A44699 | 1995 | Coolgardie Gold Nl | Slattery Dam | <1% | Slattery Dam Project, Annual Report E16/76 for the period 29/05/1994 to 28/05/1995. |
| A44967 | 1995 | Zephyr Minerals Nl | Dunnsville | 18% | EL16/90 P16/1534-1535 Annual Report Dunnsville Project Period Ending 23/07/1995 |
| A45548 | 1995 | Delta Gold Ltd | Ida Fault | 1.9% | Ida Fault Project Combined Annual Report For the period 1st February 1994- 31 st January 1995 Tenements:E16/84 |
| A46686 | 1995 | Delta Gold Ltd | Kangaroo Plains | 9.3% | Partial Surrender Report for the period 24/01/94-23/01/95 Kangaroo Plains Project E16/85 |
| A41905 | 1994 | Zephyr Minerals Nl | Dunnesville | 18% | EL16/90 P16/1534-1535 Annual Report Dunnsville Project, Period Ending 23/07/1994 |
| A42049 | 1994 | Coolgardie Gold Nl | Slattery Dam | <1% | Annual report on E16/76, Slattery Dam, For the period 29/5/1993 to 28/5/1994 |
| A40923 | 1994 | Delta Gold Ltd | Ida Fault | 2.2% | (Annual Report for the Period 01/01/93 - 01/03/94) Report on exploration completed during 1993 on Ida Fault Pr |
| A42088 | 1994 | Coolgardie Gold Nl | Slattery Dam | <1% | Slattery Dam Project, Partial Surrender Report, May 1994, E16/76. |
| A38625 | 1993 | Delta Gold Ltd | Kangaroo Plains | 9.3% | Annual Report for the period 24/01/92-23/01/93 Kangaroo Plains Project E16/85 |
| A38676 | 1993 | Coolgardie Gold Nl | Slattery Dam | <1% | Slattery Dam Project, Annual Report for the period 29/05/1992 to 28/05/1993, E16/76. |
| A38887 | 1993 | Wilga Mines Nl | Nugget Dam | 1.7% | Annual report for the period 24/01/92-23/01/93 Nugget Dam Project E16/84 P16/1434 |
| A39757 | 1993 | Yardarino Mining Nl | Dunnesville | 19% | Non-statutory Report: June 1993 Progress Report: Dunnsville Gold Project, E16/90 [Internal Report] |
| A38366 | 1993 | Delta Gold Ltd | Nugget Dam | 1.7% | Annual Report for the period 24/01/93-23/01/93 Nugget Dam Project E16/84 |
| A36513 | 1992 | Coolgardie Gold Nl | Slattery Dam | <1% | Slattery Dam Project, Annual Report for the period 29/05/1991 to 28/05/1992, E16/76. |
| A28607 | 1988 | Pioneer Minerals Aust Ltd | Carnage | 4.6% | Carnage, Rotary Air Blast Drilling Programmes, September/October 1988 and February 1989, PL's 16/540-542, 573- |
| A4035 | 1973 | Barrier Exploration Nl | Dunnsville | 60% | Dunnsville Project, Non-statutory Report: New Project Report, January 1973, MC16/976-1035. |
| A81847 | 1753 | Monarch Gold Mining Company Ltd | Davyhurst Group D | <1% | Davyhurst Group D Project Area, 2008 ANNUAL REPORT FOR PERIOD 01/01/08 to 31/12/08 Group Reporting No.C59/2008 |
| A51725 | 1753 | Herald Resources Ltd | Dunnsville | 18% | Dunnsville Project E16/90,P16/1534 & P16/1535 Annual Report for the Period 24/05/1996 to 23/05/1997 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 16/598 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 16/598 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 16/598? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-08-21. Compiled by NextMaps. Verify against primary sources before reliance.