E 16/680
Register summary
- Holder
- Gold Tiger Holdings (Australia) Pty Ltd
- Local government
- Shire of Coolgardie
- Application received
- 6 Mar 2026
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A143809 | 2024 | Lithgold Minerals Ltd | Ida Fault | <1% | Ida Fault Project, E16/515 Final Report for the period 5 August 2019 to 26 June 2024 |
| A136802 | 2023 | Blue Tiger Mining Pty Ltd | Fire Box | 2.7% | Fire Box Project Complex Annual Technical Report C75/2018 for the period ending 9/5/2023 |
| A130141 | 2022 | Gold Tiger Resources (Australia) Limited | Credo | <1% | Surrender Report For E16/415 & E16/457 Credo Project for the period ending 10/12/2021. |
| A131715 | 2022 | Klarior Resources Pty Ltd | Fire Box | 2.7% | Fire Box Project Annual Report 2022 C75/2018 for the period ending 10/05/2022. P 16/2969,P 16/2970 |
| A132634 | 2022 | Lithgold Minerals Ltd | Ida Fault | <1% | Ida Fault Project, E16/515 Annual Report for the period 5 August 2021 to 4 August 2022 |
93 more reports
| A127784 | 2021 | Klarior Resources Pty Ltd | Fire Box | 2.7% | Fire Box Project Annual Report C75/2018 for the period 10 May 2020 to 9 May 2021. P 16/02969,P 16/02970 |
| A128692 | 2021 | Origin Gold Mines Limited | Ida Fault | <1% | Annual Mineral Exploration Report For E16/515 Ida Fault Project for the period ending 04/08/2021 |
| A125399 | 2020 | Gold Tiger Resources (Australia) Pty Ltd | Credo | 6% | Credo Project C03/2013 Combined Annual Technical Report 01/07/19 to 30/06/2020 |
| A125537 | 2020 | Origin Companies Pty Ltd | Credo | <1% | Credo Project E16/515 Annual Technical Report for the period ending 04/08/2020 |
| A124113 | 2020 | Sandhu, Ts | Credo | 100% | E16/458 Final Surrender Report for the period ending 13 March 2020 |
| A124869 | 2020 | Klarior Resources Pty Ltd | Fire Box | 2.7% | Fire Box Project C75/2018 Annual Report for the period ending 09/05/2020, P16/02969, P16/02970 |
| A120746 | 2019 | Klarior Resources Pty Ltd | Dunnsville | 2.7% | Annual Report for Dunnsville P16/2969 & P16/2970 [CRG #: 75/2018] for the period 10 May 2018 to 9 May 2019 |
| A121254 | 2019 | Tanvanth Sandhu Singh | Credo | 6% | Credo Project C03/2013 Combined Annual Tenement Report 01/07/18 to 30/06/2019.E 16/00365,E 16/00393,E 16/00396 |
| A117754 | 2018 | Sandhu, Ts | Credo | 6% | Combined Annual Tenement Report 1/07/2017 to 30/06/2018, Credo, C3/2013 |
| A116813 | 2018 | Klarior Resources Pty Ltd | Dunnsville | 2.7% | Annual Report for P16/2969 & P16/2970 Dunnsville Project for the period 10 May 2017 to 9 May 2018 |
| A109050 | 2016 | Parmelia Resources Limited | Jaurdi Hills | <1% | Jaurdi Hills Project, C277/1994, Annual Technical Report, Reporting Period: 8th January 2015 – 7th January 201 |
| A110013 | 2016 | Sandhu, Ts | Credo | 6% | Combined Annual Tenement Report Credo Project C3/2012 For the Period 1 July 2015 to 30 June 2016, E16/00393, E |
| A105617 | 2015 | Parmelia Resources Limited | Jaurdi Hills | 3.4% | Jaurdi Hills Project, C277/1994, Dunnsville Nickel Prospect Final EIS Co- Funded Drilling Report, EIS Applicat |
| A106549 | 2015 | Parmelia Resources Limited | Jaurdi Hills | <1% | Jaurdi Hills Project, C277/1994, Annual Technical Report, Reporting Period: 8th January 2014 – 7th January 201 |
| A106945 | 2015 | Singh B | Credo | 6% | Credo Project C03/2002, E16/393, E16/365, E16/396, E16/415, E16/449, E16/457, E16/458, M16/524, P16/2667 Annua |
| A100564 | 2014 | Metaliko Resources Ltd | Frances Lesley | 18% | Surrender report for the period 27 March 2008 to 13 November 2013, Frances Lesley Project, E16/335 |
| A100831 | 2014 | Toro Mining Pty Ltd | Jaudi Hills | <1% | Jaudi Hills Project, Annual Report for the period 08/01/2013 to 07/01/2014, P16/2411........P16/2678; E15/1061 |
| A103136 | 2014 | Sandhu, Ts | Credo | <1% | C3/2013 Annual Exploration Report Credo Project for the period 09/12/2013 to 08/12/2014, E16/393, 365, 396, 41 |
| A96989 | 2013 | Toro Mining Pty Ltd | Jaurdi Hills | <1% | Jaurdi Hills Project, Annual Report for the period 8th January 2012 to 7th January 2013, P16/2411....2678; E15 |
| A97645 | 2013 | Sandhu, Ts | Credo | <1% | E16/415 Annual Exploration Report for the period 28/03/2012-27/03/2013 |
| A97740 | 2013 | Metaliko Resources Ltd | Frances Lesley | 18% | Annual report for the period 1 January 2012 to 8 January 2013, Frances Lesley Project, E16/335 |
| A99166 | 2013 | Sandhu, Ts | Credo | <1% | C3/2013 Annual Exploration Report Credo Project E16/365, E16/393, E16/396, E16/415, M16/524 and P16/2667 Repor |
| A92544 | 2012 | Apex Geoscience Ltd | Jaurdi Hills | <1% | Jaudi Hills Project, Annual Report for the period 8th January 2011 to 7th January 2012, M16/35, 113-114, 193-1 |
| A93551 | 2012 | Metaliko Resources Ltd | Frances Lesley | 14% | Annual report for the period 9 January 2011 to 8 January 2012, Frances Lesley Project, C271/2011, E16/292 & E1 |
| A89579 | 2011 | Apex Geoscience Ltd | Jaurdi Hills | <1% | Annual Technical Report, Jaurdi Hills Project, for the period 8th January 2010 to 7th January 2011, E15/1061; |
| A85891 | 2010 | Apex Geoscience Ltd | Jaurdi Hills | <1% | Annual Technical Report – Jaurdi Hills Project, Western Australia for the Period January 8th 2009 to January 7 |
| A86072 | 2010 | Heron Resources Ltd | Dunnsville | 14% | Annual Report for the period 1 January 2009 to 31 December 2009, Dunnsville Project, C125/2008, E16/292, E16/3 |
| A85759 | 2010 | Gbs Gold Australia Pty Ltd | Credo | <1% | Partial Surrender Report Credo Project E16/301 |
| A86075 | 2010 | Heron Resources Ltd | Dunnsville | <1% | Partial surrender report for the period 9 January 2006 to 8 January 2010, Dunnsville Project, E16/292 |
| A87648 | 2010 | Gbs Gold Australia Pty Ltd | Credo | <1% | Surrender Report Credo Project E16/301 |
| A80659 | 2009 | Vale Exploration Pty Ltd | DUNNSVILLE | <1% | DUNNSVILLE PROJECT C125/2008, TENEMENT: E16/292, PARTIAL SURRENDER REPORT, Kalgoorlie Primary Number 2171, blo |
| A81224 | 2009 | Apex Minerals Nl | Jaurdi Hills | <1% | ANNUAL TECHNICAL REPORT Jaurdi Hills Project, Western Australia, For the Period January 8th, 2008 to January 7 |
| A81592 | 2009 | Matsa Resources Ltd | DUNNSVILLE | <1% | COMBINED ANNUAL REPORT DUNNSVILLE PROJECT, C196/2007, 1st February 2008 – 31st January 2009 |
| A78267 | 2008 | Toro Mining Pty Ltd | Jaurdi Hills | <1% | Annual technical report, Jaurdi Hills Project, For the period January 8th, 2007 to January 7th 2008, C277/1994 |
| A80495 | 2008 | Vale Inco Australia Limited Partnership | Dunnsville | 14% | COMBINED ANNUAL REPORT FOR THE PERIOD 9 JANUARY 2008 - 31 DECEMBER 2008, C125/2008 |
| A77188 | 2008 | Monarch Gold Mining Company Ltd | Davyhurst | <1% | DAVYHURST PROJECT Reporting Group C189/2007 Report Type: Annual Technical Report Report Period: 2 November 200 |
| A77358 | 2008 | Inco Resources (Australia) Pty Ltd | Dunnsville | <1% | TENEMENT: E16/292 COOLGARDIE MINERAL FIELD KUNANALLING DISTRICT 16 ANNUAL REPORT FOR THE PERIOD 9 JANUARY 2007 |
| A78167 | 2008 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | COMBINED ANNUAL REPORT DUNNSVILLE PROJECT C196/2007 1ST FEBRUARY 2007 - 31ST JANUARY 2008 |
| A77387 | 2007 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | 14% | ANNUAL REPORT DUNNSVILLE PROJECT P16/2153 28 AUGUST 2006 - 27 AUGUST 2007 |
| A77389 | 2007 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | <1% | ANNUAL REPORT DUNNSVILLE PROJECT P16/2155 28 AUGUST 2006 - 27 AUGUST 2007 |
| A74031 | 2007 | Gbs Gold Australia Pty Ltd | Credo | <1% | Annual Exploration Report, Credo Project E16/301, For Period 7 September 2005 to 6 September 2006, (Kalgoorlie |
| A74590 | 2007 | Inco Australia Ltd | Dunnsville | <1% | E16/292, Annual Report for the Period 9 January 2006 to 8 January 2007, (Kalgoorlie). |
| A76731 | 2007 | Gbs Gold Australia Pty Ltd | Credo | <1% | ANNUAL EXPLORATION REPORT CREDO PROJECT E16/301 For reporting period 7th September 2006 to 6th September 2007 |
| A72818 | 2006 | Kalgoorlie-Boulder Resources Ltd | Dunnsville | 14% | Annual Report, Dunnsville Project P16/1926, 25 May 2005 to 24 May 2006, (Kalgoorlie). |
| A71947 | 2005 | Toro Mining Pty Ltd | Jaurdi Hills | <1% | Annual Technical Report Jaudi Hills Project March 8, 2004 to March 7, 2005 Group Report Reference C277/1994 GS |
| A68084 | 2004 | Placer Dome Asia Pacific Ltd | Blister Dam | 23% | Blister Dam JV project, Annual Report 03/10/2002-02/10/2003, C187/2001 |
| A68096 | 2004 | Kinver Mining Nl | Jaurdi Hills | <1% | Jaurdi Hills Project; (Group Report Reference C277/1994; GSWA Report No. M4244/1;) Annual Technical Report for |
| A66426 | 2003 | Kinver Mining Nl | Jaurdi Hills | <1% | Annual Technical Report January 8 2002 to January 7 2003 Jaurdi Hills Project C277/1994 |
| A64781 | 2002 | Kinver Mining Nl | Jaurdi Hills | <1% | Annual Technical Report January 8,2001 To January 7,2002 Group Report Reference C277/1994. Granted Tenements P |
| A61922 | 2001 | Kinver Mining Nl | Jaurdi Hills | <1% | Annual Technical Report Jaurdi Hills Project January 8, 2000 To January 7, 2001. Group Report Reference C277/1 |
| A63951 | 2001 | Centaur Mining & Exploration Ltd | Doyles Dam | <1% | Joint Annual Report for the period 18 February 2000 to 17 February 2001 C276/1997 - Doyles Dam prospecting lic |
| A60366 | 2000 | Kinver Mining Nl | Jaurdi Hills | <1% | Annual Report, Jaurdi Hills Project, 08/1/1999 to 07/01/2000 Mining Leases M16/34,35,113,114,115,193,194,201-2 |
| A60559 | 2000 | Delta Gold Ltd | Dunnsville | <1% | Annual technical Report Dunnsville Joint Venture 24/05/1999 to 23/05/2000 Tenements E16/90,P16/1534,P16/1535. |
| A57869 | 1999 | Kinver Mining Nl | Jaurdi Hills | <1% | Annual report for Jaurdi Hills Project 08/01/98-07/01/99 for tenements M16/34,35,113-115, 193-194, 201-205, p1 |
| A59017 | 1999 | Delta Gold Ltd | Dunnesville gold exploration | <1% | Annual Technical Report for Dunnsville Joint Venture 24/05/1998 to 23/05/1999 Tenements E16/90,P16/1534,P16/15 |
| A53590 | 1998 | Eden Creek Pty Ltd | Dunnsville | 35% | Partial Surrender Report on Exploration Licence E16/96 Dunnsville Western Australia covering the period 30 Dec |
| A55544 | 1998 | Delta Gold Ltd | Ida Fault | <1% | Ida Fault Project Annual Report for E16/90,P16/1534-1535 Dunnsville Joint Venture 24/05/1997 to 23/05/1998 |
| A53591 | 1998 | Eden Creek Pty Ltd | Dunnsville | 35% | Dunnsville Project, (E16/96) Annual Report 1996 - 1997 |
| A55207 | 1998 | Delta Gold Ltd | Ida Fault | <1% | Ida Fault (JV) Project, Partial Surrender Report for the period 24/05/1993 to 30/06/1998, E16/90. |
| A50302 | 1997 | Eden Creek Pty Ltd | Dunnsville | 35% | Dunnsville Project, (E16/96) Annual Report for 1995 - 1996 |
| A50436 | 1997 | Coolgardie Gold Nl | Dunsville | 1.5% | Dunsville Project, Combined Annual Report for the period 03/01/1996 to 02/01/1997 on P16/1269-1272, 1275, 1346 |
| A52067 | 1997 | Coolgardie Gold Nl | Macleay Dam | 2.8% | Macleay Dam Project, Surrender Report, August 1997, P16/1503-1510, 1797 & 1798. |
| A52127 | 1997 | Coolgardie Gold Nl | Dunnsville -Macleay Dam | 2.6% | Dunnsville -Macleay Dam Project, P16/1502 , Annual report for the period 7 July 1996 to 6 July 1997. |
| A52680 | 1997 | Coolgardie Gold Nl | Dunnsville | 1.5% | Dunnsville Project, Surrender Report, October 1997, P16/1269-1272, 1275-1276, 1346-1348. |
| A47005 | 1996 | Coolgardie Gold Nl | Dunnsville | 1.5% | Dunnsville Project, Combined Annual Report for the period 03/01/1995 to 02/01/1996, P16/1269-1272, P16/1275-12 |
| A47006 | 1996 | Coolgardie Gold Nl | Jaurdi Hills | <1% | Jaurdi Hills Joint Venture Project Annual Technical Report for the period 08/01/1995 to 07/01/1996 Coolgardie |
| A47205 | 1996 | Eden Creek Pty Ltd | Dunnsville | 35% | Dunnsville Project, (E16/96) Annual Report 1994 - 1995. |
| A48086 | 1996 | Coolgardie Gold Nl | Slattery Dam | 8.6% | Slattery Dam Project, Annual Report for the period 29/05/1995 to 28/05/1996, E16/76. |
| A48587 | 1996 | Coolgardie Gold Nl | Macleay Dam | 2.6% | Annual report on P16/1502 to P16/1510 P16/1797 to P16/1798 Macleay Dam for the period 07 July 1995 to 06 July |
| A48366 | 1996 | Herald Resources Ltd | Dunnsville | <1% | Dunnsville Project E16/90 P16/1534 & P16/1535 Annual Report for Year Ending 23/05/1996 |
| A43764 | 1995 | Coolgardie Gold Nl | Dunnsville | 1.5% | Dunnsville Project, Combined Annual Report on P16/1269-1272, P16/1275-1276, P16/1346-1348 for the period 03/01 |
| A43724 | 1995 | Eden Creek Pty Ltd | Dunnsville | 35% | Dunnsville (E16/96) Annual Report 1993 - 1994 |
| A44698 | 1995 | Coolgardie Gold Nl | Slattery Dam | 8.6% | Partial Surrender Report for the period 28/05/95 Slattery Dam Project E16/76 |
| A44699 | 1995 | Coolgardie Gold Nl | Slattery Dam | 8.6% | Slattery Dam Project, Annual Report E16/76 for the period 29/05/1994 to 28/05/1995. |
| A44967 | 1995 | Zephyr Minerals Nl | Dunnsville | <1% | EL16/90 P16/1534-1535 Annual Report Dunnsville Project Period Ending 23/07/1995 |
| A45334 | 1995 | Coolgardie Gold Nl | Macleay Dam | 2.6% | Annual Report on P16/1502-P16/1510, P16/1797-P16/1798 Macleay Dam for the period 7.7.1994 to 6.7.1995 |
| A41905 | 1994 | Zephyr Minerals Nl | Dunnesville | <1% | EL16/90 P16/1534-1535 Annual Report Dunnsville Project, Period Ending 23/07/1994 |
| A41953 | 1994 | Coolgardie Gold Nl | Macleay Dam | 3.1% | Annual Report for the period 07/07/93-06/07/94 Macleay Dam Project P16/1502-1510 |
| A42049 | 1994 | Coolgardie Gold Nl | Slattery Dam | 8.6% | Annual report on E16/76, Slattery Dam, For the period 29/5/1993 to 28/5/1994 |
| A40221 | 1994 | Coolgardie Gold Nl | Dunnsville | 1.5% | Dunnsville Project, Annual Report for the period 03/01/1993 to 02/01/1994, P16/1269-1272, 1275-1276, 1346-134 |
| A42088 | 1994 | Coolgardie Gold Nl | Slattery Dam | 8.6% | Slattery Dam Project, Partial Surrender Report, May 1994, E16/76. |
| A38676 | 1993 | Coolgardie Gold Nl | Slattery Dam | 8.6% | Slattery Dam Project, Annual Report for the period 29/05/1992 to 28/05/1993, E16/76. |
| A39757 | 1993 | Yardarino Mining Nl | Dunnesville | <1% | Non-statutory Report: June 1993 Progress Report: Dunnsville Gold Project, E16/90 [Internal Report] |
| A37973 | 1993 | Coolgardie Gold Nl | Dunnsville | 1.5% | Dunnsville Project, Annual Report for the period 03/01/1992 to 02/01/1993, P16/1269-1278, P16/1346-1348. |
| A39522 | 1993 | Coolgardie Gold Nl | Macleay Dam | 3.1% | Annual report for the period 07/07/92-06/07/93 Macleay Dam Project P16/1502-1510 |
| A35527 | 1992 | Coolgardie Gold Nl | Dunnsville | 1.5% | Dunnsville Project, Annual Report for the period 03/01/1991 to 02/01/1992, P16/1269-1278 & P16/1346-1348. |
| A36513 | 1992 | Coolgardie Gold Nl | Slattery Dam | 8.6% | Slattery Dam Project, Annual Report for the period 29/05/1991 to 28/05/1992, E16/76. |
| A27251 | 1989 | Bhp Minerals Pty Ltd | South Dam | 7.1% | Annual Report to 31st March 1989, E16/7, M16/6, South Dam. |
| A6792 | 1976 | Union Miniere Dev & Mining Corp Ltd | Dunnsville | 52% | Dunnsville Project, Annual Report for the year ending 31/12/1976, MC16/1427-1430. |
| A4035 | 1973 | Barrier Exploration Nl | Dunnsville | 6.7% | Dunnsville Project, Non-statutory Report: New Project Report, January 1973, MC16/976-1035. |
| A81847 | 1753 | Monarch Gold Mining Company Ltd | Davyhurst Group D | <1% | Davyhurst Group D Project Area, 2008 ANNUAL REPORT FOR PERIOD 01/01/08 to 31/12/08 Group Reporting No.C59/2008 |
| A51725 | 1753 | Herald Resources Ltd | Dunnsville | <1% | Dunnsville Project E16/90,P16/1534 & P16/1535 Annual Report for the Period 24/05/1996 to 23/05/1997 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 16/680 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 16/680 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Open on the map — full register record About AI reports About Tenure PacksDo you hold E 16/680? Listing is free. A facilitation fee applies only if you sell to a buyer we introduce.