E 16/690
E 16/690 is a pending exploration licence in the Shire of Coolgardie, Western Australia, applied for by Mhs Minerals Pty Ltd (part of Auric Mining Limited). The application was received on 19 Aug 2026 and is awaiting a decision. The ground is covered by 325 historical WAMEX reports.
Register summary
- Holder
- Mhs Minerals Pty Ltd
- Part of
- Auric Mining Limited (ASX:AWJ) as at 2025-12-31
- Local government
- Shire of Coolgardie
- Application received
- 19 Aug 2026
The full record on E 16/690
The register summary says who has applied for it. The rest of the record says what is attached to the application and how it is progressing.
- Current holders and their shares (no change of holder on record)
- Expenditure history, conditions and endorsements
- Native title context, combined reporting and rent status
- Expenditure compliance, expiry and ownership signals, once the application is granted
- Every register dealing (2 on record), with mortgages, caveats and transfers flagged
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A150124 | 2025 | Bulletin Resources Ltd | Powder Sill | 9.5% | Final Surrender Report for Exploration Licence E16/534 (Powder Sill) for the period ending 20/09/2025. |
| A143975 | 2024 | Zuleika Gold Limited | Star Well | 100% | Zuleika Project Annual Report 2024, Star Well, C132/2020, for the period 1 July 2023 to 30 June 2024 |
| A142849 | 2024 | Zuleika Gold Limited | Star Well | 100% | Star Well Annual Report E16/574 for the period ending 04/04/2024 |
| A138876 | 2024 | Zuleika Gold Limited | Kundana / Little T | 14% | Zuleika Project Annual Report 2023, Kundana, C161/2022 |
| A142896 | 2024 | One Eight Two Capital Investments Pty Ltd | Kununalling | 100% | Annual Report E16/593 Kununalling Project for the period ending 18/01/2024 |
245 more reports with detail
| A145359 | 2024 | Bulletin Resources Limited | Powder Sill | 9.5% | Powder Sill E16/534 Annual Report for the period ending 19/09/2024 |
| A145415 | 2024 | Zuleika Gold Limited | Star Well | 100% | Star Well Final Surrender Report E16/574 for the period ending 31/10/2024 |
| A145603 | 2024 | Zuleika Gold Limited | Kundana | 27% | Zuleika Project Final Surrender Report 2024, Kundana, P16/2967 |
| A145548 | 2024 | Zuleika Gold Limited | Kundana - Little T | 100% | Zuleika Project Final Surrender Report 2024, Kundana P16/2964 for the period 18 January 2017 to 31 October 202 |
| A145561 | 2024 | Zuleika Gold Limited | Kundana - Little T | <1% | Zuleika Project Final Surrender Report 2024, Kundana, P16/2965 (20 March 2017 to 31 October 2024) |
| A145581 | 2024 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Final Surrender Report 2024, Kundana, P16/2966 (20 March 2017 to 31 October 2024) |
| A145617 | 2024 | Zuleika Gold Limited | Star Well | 100% | Zuleika Project Final Surrender Report 2024, Star Well, P16/3024 |
| A145642 | 2024 | Zuleika Gold Limited | Star Well | 100% | Zuleika Project Final Surrender Report 2024, Star Well, P16/3025 |
| A145723 | 2024 | Zuleika Gold Limited | Star Well | 100% | Zuleika Project Final Surrender Report 2024, Star Well, P16/3026 |
| A134029 | 2023 | Zuleika Gold Limited | Kundana - Zuleika | 14% | Zuleika Project Annual Report Kundana, C161/2022, for the period ending |
| A134763 | 2023 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | 99% | Final Surrender report - P15/5920-5921 Kunanalling for the period ending 02/02/2023. |
| A135323 | 2023 | Zuleika Gold Limited | Star Well | 100% | Star Well Annual Report E16/574 for the period ending 4/4/2023 |
| A135639 | 2023 | Zuleika Gold Limited | Star Well | 100% | Zuleika Project Annual Report, Star Well, C132/2020 for the period ending 30/06/2023. |
| A137541 | 2023 | Bulletin Resources Limited | Powder Sill | 9.5% | Annual Report for the Powder Sill Project E16/534 for the period ending 19/09/2023. |
| A130942 | 2022 | Torian Resources Limited | Kundana | 27% | Zuleika Project Annual Report 2018, Kundana, P16/2967 for the period ending 19/06/2018. |
| A131806 | 2022 | Zuleika Gold Limited | Star Well | 100% | Annual Report Star Well Project, C132/2020 for the period ending 30/06/2022. P16/03024,P16/03026,P16/03025 |
| A130931 | 2022 | Torian Resources Limited; Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report 2020, Kundana, P16/2965 for the period ending 19/03/2020. |
| A130932 | 2022 | Torian Resources Limited | Kundana | <1% | Zuleika Project Annual Report 2018, Kundana, P16/2966 for the period ending 19/03/2018. |
| A130941 | 2022 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report 2020, Kundana, P16/2966 for the period ending 19/03/2020. |
| A129323 | 2022 | Evolution Mining (Mungari) Pty Ltd | Mungari West | <1% | Final Surrender Report - E15/1268 Mungari West for the period 31 October 2011 to 30 October 2021 |
| A129326 | 2022 | Evolution Mining (Mungari) Pty Ltd | Star Dam | 100% | Final Surrender Report - E16/419 - Star Dam for the period 1 November 2011 to 31 October 2021 |
| A129723 | 2022 | Evolution Mining (Mungari) Pty Ltd | Star Dam | 100% | Final Surrender Report - E16/418 Star Dam Project for the period ending 31/10/2021. |
| A129830 | 2022 | Zuleika Gold Limited | Kundana | 100% | Zuleika Project Annual Report 2021, Kundana, P16/2964, for the period ending 17/01/2022 |
| A130521 | 2022 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report Kundana, P16/2966 period ending 20/03/2022 |
| A130522 | 2022 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report Kundana P16/2965 for the period ending 20/03/2022 |
| A130523 | 2022 | Zuleika Gold Limited | Kundana | 27% | Zuleika Project Annual Report, Kundana, P16/2967, for the period ending 20/03/2022 |
| A130930 | 2022 | Torian Resources Limited | Kundana | <1% | Zuleika Project Annual Report 2018, Kundana, P16/2965 for the period ending 19/03/2018. |
| A130946 | 2022 | Zuleika Gold Limited | Kundana | 27% | Zuleika Project Annual Report 2020, Kundana, P16/2967 for the period ending 19/03/2020 |
| A131341 | 2022 | Evolution Mining (Mungari) Pty Ltd | Kundana | 100% | Final Surrender Report - P16/3032 Kundana for the period ending 09/05/2022. |
| A126884 | 2021 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report Kundana P16/2965 for the period ending 20/3/2021 |
| A126897 | 2021 | Zuleika Gold Limited | Kundana | <1% | Zuleika Project Annual Report P16/2966 for the period ending 20/03/2021 |
| A126898 | 2021 | Zuleika Gold Limited | Kundana | 27% | Zuleika Project Annual Report Kundana P16/2967 for the period ending 20/3/2021 |
| A127838 | 2021 | Zuleika Gold Limited | Star Well | 100% | Zuleika Project Annual Report Star Well C132/2020 for the period 4 July 2020 to 3 July 2021 |
| A126436 | 2021 | Zuleika Gold Limited | Kundana | 100% | Zuleika Project Annual Report P16/2964 for the period ending 17/01/2021 |
| A122799 | 2020 | Northern Star (Kanowna) Pty Limited | Kundana | 4.5% | Kundana Annual Report C102/2004 for the period 1 January 2019 to 31 December 2019 |
| A123020 | 2020 | Torian Resources Ltd | Zuleika | 100% | Zuleika Project P 16/2964 Annual Report for the period 18 January 2018 to 17 January 2019 |
| A123026 | 2020 | Evolution Mining (Mungari) Pty Ltd | Mungari | 6.8% | Annual Report C1/2017 Mungari Project for the period 1 January 2019 to 31 December 2019 |
| A123163 | 2020 | Evolution Mining (Mungari) Pty Ltd | Kintore-Kunanalling | 4.7% | Annual Report - C3/2017 - Kintore/Kunanalling - 1 January 2019 to 31 December 2019 |
| A123517 | 2020 | Evolution Mining (Mungari) Pty Ltd | Star Dam | 11% | Fianl Surrender Report P16/2703 and P16/2704, Sar Dam, 7 November 2011 to 6 November 2019 |
| A123626 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2965 Annual Report for the period ending 19/3/2019 |
| A123630 | 2020 | Torian Resources Ltd | Zuleika | <1% | Zuleika Project P 16/2966 Annual Report for the period ending 19/3/2019 |
| A123631 | 2020 | Torian Resources Ltd | Zuleika | 27% | Zuleika Project P 16/2967 Annual Report for the period ending 19/3/2019 |
| A123644 | 2020 | Torian Resources Ltd | Zuleika | 100% | Zuleika Project P 16/3025 Annual Report for the period ending 3/7/2019 |
| A123727 | 2020 | Torian Resources Ltd | Zuleika | 100% | Zuleika Project P16/2964 Annual Report for the period ending 17/1/2020 |
| A124511 | 2020 | Evolution Mining (Mungari) Pty Ltd | Little Hill Dam | 100% | Final Surrender Report - E16/340 Little Hill Dam project for the period 29 April 2008 to 28 April 2020 |
| A124809 | 2020 | Torian Resources Ltd | Zuleika | 100% | Zuleika Project P16/3024, P16/3025, P16/3026 Annual Report for the Period 4/7/2017 to 3/7/2018 |
| A124818 | 2020 | Torian Resources Ltd | Zuleika | 100% | Zuleika Project P16/3024, P16/3025, P16/3026 Annual Report for the Period 4/7/2019 to 3/7/2020 |
| A123636 | 2020 | Torian Resources Ltd | Zuleika Project P 16/3024 | 100% | Zuleika Project P 16/3024 Annual Report 2019 |
| A123647 | 2020 | Torian Resources Ltd | Zuleika | 100% | Zuleika Project P 16/3026 Annual Report for the period ending 3/7/2019 |
| A119624 | 2019 | Northern Star (Kanowna) Pty Limited | Far Kundana West - P Sliver | 75% | Far Kundana West – P Sliver P16/2575 Surrender Report For the Period 3 March 2011 to 18 February 2019 |
| A121569 | 2019 | Evolution Mining (Mungari) Pty Ltd | Broads Dam | 13% | Final Surrender Report Broads Dam E16/360, E16/364, and E16/371 for the period 24 August 2009 to 23 August 201 |
| A121636 | 2019 | Torian Resources Ltd | Zuleika Project P 16/2964 | 100% | Zuleika Project P 16/2964 Annual Report for the period 18 January 2017 to 17 January 2018 |
| A119241 | 2019 | Northern Star (Kanowna) Pty Limited | Kundana | 4.6% | Kundana C102/2004 Annual Technical Report for the period 1 January 2018 to 31 December 2018 |
| A119550 | 2019 | Evolution Mining (Mungari) Pty Ltd | Mungari | 9.4% | Annual Report - Group C1/2017 - Mungari Project For the Period 1 January 2018 to 31 December 2018 |
| A119552 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanalling | 4.7% | Group Annual Technical Report - Kintore Kunanalling - C3/2017 For the Period 1 January 2018 to 31 December 201 |
| A119823 | 2019 | Evolution Mining (Mungari) Pty Ltd | Broads Dam | 100% | Surrender Report E16/359 Broads Dam Project for the period 3 December 2008 to 2 December 2018 |
| A119929 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | 38% | Surrender Report P16/2863-2866 Kunanalling Project for the period 3 February 2015 to 2 February 2019 |
| A119949 | 2019 | Evolution Mining (Mungari) Pty Ltd | Kunanalling | 36% | Surrender Report P16/2604 and P16/2605 Kunanalling Project C3/2017 for the period 4 March 2011 to 3 March 2019 |
| A121557 | 2019 | Evolution Mining (Mungari) Pty Ltd | Star Dam | 54% | Final Surrender Report Star Dam P16/2707 - P16/2710 For the Period 21 July 2011 to 20 July 2019 |
| A116303 | 2018 | Evolution Mining (Mungari) Pty Ltd | Kintore - Kunanulling | 6.7% | Annual Report Kintore - Kunanulling C3/2017 For the Period 1 January 2017 to 31 December 2017 |
| A117262 | 2018 | Evolution Mining (Phoenix) Pty Limited | Croesus | 92% | Final Surrender Report P16/2606 Croesus Project for the period 16 June 2010 to 15 June 2018 |
| A116058 | 2018 | Northern Star (Kanowna) Pty Limited | Kundana | 4.6% | Kundana C102/2004 Annual Technical Report for the period 1 January 2017 to 31 December 2017 |
| A116230 | 2018 | Evolution Mining (Mungari) Pty Ltd | Mungari | 9.8% | Annual Report Mungari Project C1/2017 For the Period 1 January 2017 to 31 December 2017 |
| A117042 | 2018 | Evolution Mining (Mungari) Pty Ltd | Little Hill Dam | 100% | Final Surrender Report E16/339 Little Hill Dam for the period 28/04/2008 - 28/04/2018 |
| A117263 | 2018 | Evolution Mining (Mungari) Pty Ltd | Black Hills | 79% | C3/2017 Final Surrender Report P16/2815 and P16/2816 Black Hills Project for the period 27 February 2014 to 23 |
| A117260 | 2018 | Evolution Mining (Phoenix) Pty Limited | Kunanalling | 13% | Final Surrender Report P16/2598, P16/2600, P16/2601, P16/2602, P16/2603, P16/2608 Kunanalling Project C3/2017 |
| A112192 | 2017 | Northern Star (Kanowna) Pty Limited | West Kundana | 20% | West Kundana EM Anomaly Drilling - Final Report (Co-Funded Drilling Report) C102/2004, M 16/00213, M 16/00073 |
| A112160 | 2017 | Northern Star (Kanowna) Pty Limited | Kundana | 3.9% | Kundana Project C102/2004 Annual Technical Report for the period 1 January 2016 to 31 December 2016, E24/00152 |
| A112431 | 2017 | Evolution Mining (Mungari) Pty Ltd; Hayes Mining Pty Ltd | Kintore - Kunanalling | 6.5% | Annual Report on the Kintore - Kunanalling Project, C3/2017, for the period 1 January 2016 to 31 December 2016 |
| A112440 | 2017 | Cerep Pty Ltd; Evolution Mining (Mungari) Pty Ltd; Hayes Min | Mungari | 9.6% | Annual Report for Mungari Project, C1/2017, for the period 1 October 2015 to 31 December 2016, P16/02244 ....E |
| A107992 | 2016 | Phoenix Gold Limited | Kunanalling | 14% | Kunanalling Project Annual Mineral Exploration Report C153/2006 For the period 1st January 2015 to 31st Decemb |
| A108144 | 2016 | Northern Star (Kanowna) Pty Limited | Kundana | 3.9% | Kundana Annual Technical Report for the Period 1 January 2015 to 31 December 2015 C102/2004 |
| A108735 | 2016 | Evolution Mining (Mungari) Pty Ltd | Mungari | <1% | Mungari Project C145/2013 Annual Report to the Department of Mines and Petroleum for the period 01/01/2015 to |
| A110144 | 2016 | Evolution Mining (Mungari) Pty Ltd | Cutters Ridge | 32% | Cutters Ridge C6/2009 Annual Report for the year ending 27/07/2016, M15/00692, P15/04863, P15/04864, P15/04865 |
| A110055 | 2016 | Evolution Mining (Mungari) Pty Ltd | Kintore | 36% | Annual Report for the period 1st July 2015 to 30th June 2016, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A104845 | 2015 | Phoenix Gold Limited | Kunanalling | 14% | Kunanalling Project, Annual Report for the period 01/01/2014 to 31/12/2014, C153/2006. |
| A104917 | 2015 | Northern Star Resources Ltd | Kundana | 3.9% | Kundana Project C102/2004 Annual Report for the period 1 January 2014 – 31 December 2014, E24/152....P26/3574 |
| A105026 | 2015 | La Mancha Resources Australia Pty Ltd | Mungari | <1% | MUNGARI PROJECT ANNUAL REPORT to the Department of Mines and Petroleum for the period 01/01/2014 to 31/12/2014 |
| A106632 | 2015 | La Mancha Resources Australia Pty Ltd | Kintore | 33% | Annual Report for the period 1st July 2014 to 30th June 2015,C144/2014 Kintore, Kintore East, Carbine, Broads |
| A106792 | 2015 | Evolution Mining Pty Ltd | Cutters Ridge | 32% | Cutters Ridge Project C6/2009 Annual Report to the Department of Mines and Petroleum for the period 28/07/2014 |
| A107613 | 2015 | Phoenix Gold Limited | Broads Dam | 11% | Broad Dam Project C194/2010 Combined Mineral Exploration Report for the period 1st October 2014 to 30th Septem |
| A103169 | 2014 | La Mancha Resources Australia Pty Ltd | Kintore | 33% | Annual Report for the period 1st July 2013 to 30th June 2014, Kintore, Kintore East, Carbine, Broads Dam, Star |
| A101201 | 2014 | Phoenix Gold Limited | Kunanalling | 15% | Kunanalling Project, Annual Report, Reporting Group: C153/2006, For the period 1st Januray 2013 to 31st Decem |
| A101174 | 2014 | La Mancha Resources Australia Pty Ltd | Mungari | <1% | Mungari Project C145/2013 Annual Report for the period 01/01/2013 to 31/12/2013, E15/960......P15/5265-5267 |
| A101284 | 2014 | Barrick (Australia Pacific) Ltd | Kundana | 3.3% | Project 8100 Kundana Project 8101 Kundana Project 8103 East Kundana Project 8104 West Kundana Annual Report P |
| A103181 | 2014 | La Mancha Resources Australia Pty Ltd | Cutters | 32% | CUTTERS RIDGE PROJECT ANNUAL REPORT to the Department of Mines and Petroleum FOR THE PERIOD 28/07/2013 TO 27/0 |
| A103681 | 2014 | Phoenix Gold Limited | Broads Dam | 12% | Broad Dam Project C194/2010 Annual Mineral Exploration Report for Period 1/10/13 to 30/09/14 |
| A96888 | 2013 | Barrick (Australia Pacific) Ltd | Kundana | 3.3% | PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104 WEST KUNDANA Annual Report P |
| A96993 | 2013 | Phoenix Gold Limited | Kunanalling | 17% | Kunanalling Project, Annual Report for the period 1st January 2012 to 31st December 2012, M15/696; M16/15..... |
| A98928 | 2013 | Phoenix Gold Limited | Kalgoorlie West 2 | 17% | Kalgoorlie West 2 Project (C180/2009) Annual Technical Report for Period 1/7/2012 to 30/6/2013, E16/359...... |
| A98985 | 2013 | La Mancha Resources Australia Pty Ltd | Cutters Ridge | 32% | Cutters Ridge Project Annual Report to the Department of Mines and Petroleum for the period 28/07/2012 TO 27/ |
| A100149 | 2013 | La Mancha Resources Australia Pty Ltd | Mungari West Kurrawang | 15% | Mungari West Kurrawang C41/2007 Annual Report to the Department of Mines and Petroleum for the period 15/03/12 |
| A100441 | 2013 | Phoenix Gold Limited | Broads Dam | 12% | Mineral Exploration Report for Period 1/10/12 to 30/09/13 Broads Dam Project |
| A93042 | 2012 | Barrick Gold Of Australia Ltd | Kundana | 3.3% | ANNUAL REPORT Period 1 January 2011 – 31 December 2011 C102/2004 |
| A94095 | 2012 | La Mancha Resources Australia Pty Ltd | Mungari West - Kurrawang | 15% | Mungari West-Kurrawang Project Annual Report to the Department of Mines and Petroleum for the period 15/03/11 |
| A94982 | 2012 | Carrick Gold Ltd | Kalgoorlie West 2 | 17% | Annual report for the period 01 July 2011 to 30 June 2012, Kalgoorlie West 2 Project, C180/2009, E16/359, 360, |
| A92835 | 2012 | Phoenix Gold Limited | Kunanulling | 17% | Kunanulling Project, Annual Report for the period 1st January 2011 to 31st December 2011, M15/696; M16/15..... |
| A95532 | 2012 | La Mancha Resources Australia Pty Ltd | Cutter's Ridge | 32% | Cutter's Ridge Project M15/692 & P15/4863-6 Annual Report to the DMP for the period 28/07/2011 to 27/07/2012 ( |
| A96112 | 2012 | Phoenix Gold Limited | Broads Dam | 1.2% | Broads Dam Project, Annual Report for the period 1st October 2011 to 30th September 2012, M16/19; P16/2244... |
| A89371 | 2011 | Phoenix Gold Limited | Kunanalling | 24% | Kunanalling Annual Technical Report For the period 1st January 2010 to 31st December 2010 |
| A91642 | 2011 | Carrick Gold Ltd | Kundana North - Kalgoorlie West 2 | 17% | Annual report for the Combined Reporting Area C180/2009 Kundana North (Kalgoorlie West 2) Project |
| A90700 | 2011 | La Mancha Resources Australia Pty Ltd | Mungari West Kurrawang | <1% | Mungari West Kurrawang Project, Annual Report to the Department of Mines and Petroleum for the period 15/03/10 |
| A90859 | 2011 | La Mancha Resources Australia Pty Ltd | West Kal | 34% | West Kal JV C8/2009, Annual Report to the Department of Mines and Petroleum for the period 29/04/10 to 28/04/1 |
| A91504 | 2011 | La Mancha Resources Australia Pty Ltd | Cutters Ridge | 32% | Cutters Ridge Project Annual Report to the Department of Mines and Petroleumfor the period 28/07/2010 to 27/07 |
| A91989 | 2011 | Guj A L | North Kundana | <1% | Annual report for the period 23 July 2010 to 22 July 2011 North Kundana Project, E16/342 and P24/4175 |
| A92058 | 2011 | Phoenix Gold Limited | Broads Dam | 1.5% | Annual Technical Report for Period 25/09/10 to 24/09/11 Broads Dam Project (C141/2009). |
| A85972 | 2010 | Barrick Gold Of Australia Ltd | Kundana | 5.8% | PROJECT 8100 KUNDANA PROJECT 8101 KUNDANA PROJECT 8103 EAST KUNDANA PROJECT 8104 WEST KUNDANA E15/256, E15/634 |
| A86386 | 2010 | Cazaly Resources Ltd | Kunanalling | 11% | Combined Annual Report, KUNANALLING PROJECT, For the Period 1 January 2009 to 31 December 2009, C153/2006 |
| A88442 | 2010 | Guj A L | North Kundana | <1% | Annual report for the period 23 July 2009 to 22 July 2010 North Kundana Project, E16/342 and P24/4175 |
| A88446 | 2010 | Cazaly Resources Ltd | Kunanalling | 79% | Kunanalling Annual Technical Report P16/2238, P16/2239 For the period 1st October 2009 – 30th September 2010 |
| A88659 | 2010 | Australian Gold Investments Pty Ltd | Broad Dam | 1.5% | Annual Combined Report for the period ending 24 September 2010 |
| A87884 | 2010 | La Mancha Resources Australia Pty Ltd | CUTTERS RIDGE | 32% | CUTTERS RIDGE ANNUAL REPORT FOR THE PERIOD 28 July 2008 TO 27 July 2009, M15/692 & P15/4863-6 |
| A81372 | 2009 | Barrick Gold Of Australia Ltd | KUNDANA | 5.4% | ANNUAL REPORT Period 1 January 2008 – 31 December 2008 C102/2004, PROJECT 8100 KUNDANA, PROJECT 8101 KUNDANA, |
| A81462 | 2009 | Cazaly Resources Ltd | KUNANALLING | 16% | Combined Annual Report KUNANALLING PROJECT, For the Period 1 January 2008 to 31 December 2008. Exploration |
| A82020 | 2009 | Western Resources Pty Ltd | Willow Dam | <1% | Annual Report for the period 5 March 2008 to 4 March 2009, Willow Dam Project, P16/2540 |
| A84644 | 2009 | Guj A L | North Kundana | <1% | Annual report for the period 23 July 2008 to 22 July 2009 North Kundana Project, E16/342 and P24/4175 |
| A81508 | 2009 | Cazaly Resources Ltd | KUNANALLING | 64% | Final Surrender Report KUNANALLING PROJECT E16/0302, For the Period 5 February 2004 to 8 October 2008, C153/20 |
| A82594 | 2009 | La Mancha Resources Australia Pty Ltd | WEST KALGOORLIE | 34% | ANNUAL REPORT FOR WEST KALGOORLIE PROJECT FOR THE PERIOD 29th APRIL 2008 TO 28th APRIL 2009. Tenement: M15/140 |
| A84626 | 2009 | La Mancha Resources Australia Pty Ltd | Cutters Ridge | 32% | Cutters Ridge Annual Report for the period 28 July 2008 to 27 July 2009, M15/692, P15/4863-6, and PLA 15/5266 |
| A85252 | 2009 | Abm Resources Nl; Australian Gold Investments Limited | BROADS DAM | 1.5% | BROADS DAM Annual Report for the period ending 24 September 2009 (P16/2375, P16/2376, P16/2377, P16/2378, P16 |
| A77532 | 2008 | Cazaly Resources Ltd | Kunanalling | 34% | Combined Annual Report KUNANALLING PROJECT C153/2006 For the Period 1 January 2007 to 31 December 2007 |
| A77536 | 2008 | Barrick Gold Of Australia Ltd | Kundana | 5.4% | ANNUAL REPORT Period 1 January 2007 - 31 December 2007 KUNDANA PROJECT C102/2004 TECHNICAL REPORT No. 1253 |
| A74443 | 2007 | Cazaly Resources Ltd | Kunanalling | 32% | Combined Annual Report, Kunanalling Project, For the Period 1 January 2006 to 31 December 2006. (C87/2004) |
| A74407 | 2007 | Barrick Gold Of Australia Ltd | Kundana | 6.6% | Kundana Project C102/2004 Annual Report 1 January 2006 to 31 December 2006 Technical Report No.1214 (Kalgoorli |
| A72089 | 2006 | Placer Dome Asia Pacific Ltd | Kundana | 6.6% | Kundana Project, Annual Report 1 January 2005 to 31 December 2005 C102/2004, (PDAP Report No. WA06.012, Kalgoo |
| A72502 | 2006 | Cazaly Resources Ltd | Kunanalling | 40% | Combined Annual Report C87/2004, Kunanalling Project, For the Period 1 January 2005 to 31 December 2005, (Kalg |
| A73032 | 2006 | Cazaly Resources Ltd | Kunanalling | 9% | Combined Annual Report, Kunanalling Project P16/2193-2196, P16/2203-2208,2241-2243,2292, For the Period 30 Mar |
| A73040 | 2006 | Stericorp Ltd | Cutters Ridge | 32% | Cutters Ridge Annual Report for the Period 1 January 2005 to 31 December 2005, M15/692,P15/3109-3111,3303, Com |
| A73237 | 2006 | Cazaly Resources Ltd | Kunanalling | 12% | Combined Annual Report for the Period 7 July 2005 to 6 July 2006, Kunanalling Project P16/2197-2198,2224-2231, |
| A70352 | 2005 | Placer Dome Asia Pacific Ltd | Kundana | 6.6% | Kundana Project, Annual report 1 January 2004 to 31 December 2004, C102/2004, E15/256, 634, E16/113, E26/43, M |
| A70402 | 2005 | Cazaly Resources Ltd | Kunanalling | 1.8% | Combined annual report for the period 01/01/04 - 31/12/04 Kunanalling Project, C87/2004, E16/302, M15/692..... |
| A70831 | 2005 | Kinross Gold Australia Pty Ltd | Broads Dam | 1.5% | Broads Dam Project, Combined annual report, 09 June 2004 - 08 June 2005, DOME Reference: C87/1995 Group 1 M369 |
| A68129 | 2004 | Mines & Resources Australia Pty Ltd | Cutter's Ridge | 32% | Cutter's Ridge Project, Annual Report P15/3109-3111, P15/3303, M15/692 for the period 01/01/2003-31/12/2003. ( |
| A68216 | 2004 | Placer Dome Asia Pacific Ltd | Kundana GEM | 15% | Kundana Gem Project ,Annual Report P16/1531-1532,P16/1754-1755, E16/113, M15/993, M16/181-182, M16/213-214, M1 |
| A68966 | 2004 | Kinross Gold Australia Pty Ltd | Broads Dam | 1.5% | Annual report for the period 09/06/2003-08/06/2004 Broads Dam Project (C87/1995), P16/1440-1453 |
| A69153 | 2004 | Placer Dome Asia Pacific Ltd | Kundana | 4.1% | Kundana Operations, Annual Report 01/07/2003-30/06/2004, C433/1994, Tenements: P16/1678-80, P16/1781, P16/1846 |
| A66069 | 2003 | Placer Dome Asia Pacific Ltd | Kundana West | 4.2% | Annual Technical Report 01/01/2002 - 31/12/2002 Kundana West C200/1998 Tenements P15/3917, P16/1781, P16/1846, |
| A66908 | 2003 | Placer Dome Asia Pacific Ltd | Kundana West | 52% | Surrender Report for P16/1858-1859 for the period 21/01/1997 to 09/05/2003 and P15/3917 for the period 19/11/1 |
| A67090 | 2003 | Placer Dome Asia Pacific Ltd | Northlander | 79% | Northlander Project, Final Surrender Report for the period 12/10/1993 to 15/05/2003, P16/1670-1671. |
| A67091 | 2003 | Placer Dome Asia Pacific Ltd | Kunanalling | 4.9% | Kunanalling South Project (White Flag West), Annual Report 06/06/2002 to 05/06/2003, C101/2000 P16/2004-2005,2 |
| A67269 | 2003 | Placer Dome Asia Pacific Ltd | Kundana | 4.8% | Kundana Project, Annual Report for the period 01/07/2002 to 30/06/2003, P16/1678-80; M16/72-75, 87, 97 & 157. |
| A67450 | 2003 | Placer Dome Asia Pacific Ltd | Northlander | 63% | Surrender Report for P15/3262-3263 (12/01/1993-09/07/2003) P15/3726 (15/01/1996-09/07/2003), P15/3824 (19/12/1 |
| A66146 | 2003 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 32% | Cutter's Ridge, Annual Report for the period 1 January 2002 to 31 December 2002, P15/3109-3111, P15/3303, M15/ |
| A66164 | 2003 | Placer Dome Asia Pacific Ltd | Kunanalling | 1.8% | Annual Report 01/01/2002 - 31/12/2002 Kunanalling Project C36/1999: M16/15, 17, 33, 36, 47, 52, 99, 139-40, 17 |
| A66329 | 2003 | Placer Dome Asia Pacific Ltd | Kundana (GEM) | 15% | Kundana (GEM) Project, Annual Report, 01/01/2002-31/12/2002,C22/1999: P16/1531-32, 1754-55, E16/113, M15/993, |
| A66859 | 2003 | Placer Dome Asia Pacific Ltd | Kunanalling | 11% | Surrender report for the period 31/10/1995 to 14/04/2003 P16/1814-1815 PDAP Report No. WA03.034 |
| A66927 | 2003 | Placer Dome Asia Pacific Ltd | Broads Dam | 1.5% | Annual Report for the period 31/07/2002 to 30/07/2003 Broads Dam Project C87/1995 Report No. WA03.037 |
| A66997 | 2003 | Placer Dome Asia Pacific Ltd | Kunanalling | 5.5% | Kunanalling Project, Surrender Report, 14/02/1995 to 13/06/2003, P16/1794 and 19/05/1998 to 13/06/2003 P16/197 |
| A67340 | 2003 | Placer Dome Asia Pacific Ltd | Northlander | 36% | Annual Report for the period 01/08/2002 to 31/07/2003 Northlander Project C410/1994: M15/696 P15/2916,3029,326 |
| A64276 | 2002 | Mines & Resources Australia Pty Ltd | Croesus | 11% | Croesus Joint Venture Annual Report for the period 8 December 2000 to 7 December 2001 tenement: M16/199-200, M |
| A64285 | 2002 | Goldfields Exploration Pty Ltd | Kundana West | 12% | Annual Report Kundana West Project reporting period 01/01/2001 - 31/12/2001 EL(s)/tenements E16/163, E16/164, |
| A64425 | 2002 | Goldfields Exploration Pty Ltd | Kunanalling | 1.7% | Annual Report. Kunanalling Project. Tenements M16/139-40, M16/15, M16/17, M16/178, M16/217, M16/236, M16/306, |
| A65433 | 2002 | Auriongold Exploration Pty Ltd | Northlander | 40% | Northlander Project Annual Reprt 01/08/2001-31/07/2002 C410/1994 Tenements P15/2916, 3029, 3262-3263, 3363, 33 |
| A65458 | 2002 | Auriongold Exploration Pty Ltd | Broads Dam | 1.5% | Broads Dam Project, Annual Report for the period 31/07/2001-30/07/2002 , P16/1440-1453. (C87/1995) |
| A64443 | 2002 | Goldfields Exploration Pty Ltd | Kundana | 15% | Kundana Project Annual Report 2001. Reporting Period: 01/01/2001 - 31/12/2001. Tenements E16/113, M16/181-82, |
| A64542 | 2002 | Mines & Resources Australia Pty Ltd | Cutter's Ridge | 32% | Cutter's Ridge Annual Report For The Period 1 January 2001 to 31 December 2001 PE02/04. Tenements: P15/3109-31 |
| A65387 | 2002 | Auriongold Exploration Pty Ltd | Kundana | 4.8% | Kundana Operations, Annual Technical Report Reporting Period 01/07/2001 - 30/06/2002 M16/72, M16/73, M16/74, M |
| A65530 | 2002 | Auriongold Exploration Pty Ltd | Kundana West | 8.4% | Kundana West Project Surrender Report 08/09/1998-16/08/2002 E16/163-164 |
| A82878 | 2002 | Placer (Granny Smith) Pty Ltd | Kalgoorlie | 1.3% | Kalgoorlie High Resolution Gravity Surveys. |
| A61763 | 2001 | Goldfields Exploration Pty Ltd | Star of Fremantle | 19% | Annual Report, Star of Fremantle Project, P15/3037, P16/1410, P16/1411, and P16/1412. For the period 19 Novem |
| A61924 | 2001 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 32% | Cutters Ridge Joint Venture Project Annual Report 1 January 2000 to 31 December 2000, tenements P15/3109 - 311 |
| A61935 | 2001 | Kundana Gold Pty Ltd | Kundana West | 14% | Kundana West Annual Report 2000 reporting period 01/01/2000 - 31/12/2000, vol 1 of 1. WA D of M & E reference |
| A62264 | 2001 | Goldfields Exploration Pty Ltd | Kundana | 15% | Kundana Project Annual Report 2000 reporting period 01/01/2000 - 31/12/2000 tenements E15/247, E16/113, M16/18 |
| A63329 | 2001 | Hampton Hill Mining Nl | Northlander | 40% | Northlander Project. Reporting Period: 1/08/2000-31/07/2001 Tenements M15/696, P15/2916, P15/3263, P15/3363, P |
| A61827 | 2001 | Mines & Resources Australia Pty Ltd | Croesus | 11% | Croesus Joint Venture Annual Report for the period 8 December 1999 to 7 December 2000. PE 00/34. Tenements M |
| A63101 | 2001 | Kundana Gold Pty Ltd | Kunanalling South | 4.9% | Kunanalling South Project Reporting Period: 06/06/2000 - 05/06/2001. Tenements P16/2004, P16/2005, P16/2059. [ |
| A63189 | 2001 | Kundana Gold Pty Ltd | Kundana | 4.8% | Annual Report Reporting Period: 01/07/00 To 30/06/01. Project: Kundana. Tenements M16/72, M16/73, M16/74, M16/ |
| A63585 | 2001 | Delta Gold Ltd | Broads Dam | 1.5% | C87/1995 Annual Report 31/07/2000 to 30/07/2001. |
| A63919 | 2001 | Heron Resources Ltd | Powder Sill | 96% | Powder Sill Project Mungari West Prospect E16/146, Coolgardie Mineral Field Annual Report 31 October 2000 to 3 |
| A59553 | 2000 | Hampton Hill Mining Nl | Northlander | 50% | Combined Annual Technicl Report, Northlander project, P15/3663,3368,3370-3373,3824,P16/1615-1618,1670-1671, Pe |
| A59799 | 2000 | Hampton Hill Mining Nl | Speargrass | 99% | Annual Report, Speargrass Project, P15/3262 & 3263 for the period 11/01/1997 to 11/01/1998. |
| A59800 | 2000 | Hampton Hill Mining Nl | Gentle Annie | 93% | Annual Report, Gentle Annie Project , P15/3728 for the period 16/01/1998 to 15/01/1999. |
| A59801 | 2000 | Hampton Hill Mining Nl | Gentle Annie | 93% | Annual Report, Gentle Annie Project, Prospecting Licence 15/3728 for the period 16/01/1997 to 15/01/1998. |
| A59807 | 2000 | Hampton Hill Mining Nl | Black Cat North West | 12% | Annual Report, Black Cat North West Project, P15/3725 & 3726 for the period 17/01/1998 to 16/01/1999. |
| A59890 | 2000 | Amx Resources Nl | Kunanalling | 1.8% | Annual Report on Kunanalling Gold Project Progress Report on Exploration carried out on Tenements GML16/1253,M |
| A60227 | 2000 | Gilt-Edged Mining Nl | Kundana | 15% | Kundana Project Western Australia Technical Report E15/247, E16/113,M16/181,M16/182,M16/213-214,M16/218,P16/15 |
| A60333 | 2000 | Goldfields Exploration Pty Ltd | Kundana West | 16% | Annual Report Kundana West Project Tenement P15/3917, P16/1849,P16/1781,P16/1858,P16/1859,E16/163,E16/164 Kund |
| A61148 | 2000 | Delta Gold Ltd | West Black Flag | 1.4% | Broads Dam. M16/88, P16/1440-1453. Combined Annual Report 31 July 1999 to 30 July 2000. DOME Reference C87/199 |
| A59781 | 2000 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 32% | Cutters Ridge Joint Venture Project Annual Report for the period 01 January 1998 to 31 December 1999 PE00/02 P |
| A59798 | 2000 | Hampton Hill Mining Nl | Speargrass | 99% | Annual Report, Speargrass Project. P15/3262 & 3263 for the period 11/01/1998 to 11/01/1999. |
| A59805 | 2000 | Hampton Hill Mining Nl | Black Cat South | 32% | Annual Report, Black Cat South Project (Spinifex Gold NL's Gentle Annie Project) Prospecting Licences 15/2916 |
| A59879 | 2000 | Goldfields Exploration Pty Ltd | Mungari NW | 96% | Annual Report,Mungari NW JV Project, E16/146 for the period 01/01/1999 to 31/12/1999. |
| A60023 | 2000 | Reefton Mining Nl | Star of Fremantle | 19% | Annual Report, P16/1410, P16/1411, P16/1412, and P15/3037. For the period 19 November 1998 to 18 November 199 |
| A60037 | 2000 | Mines & Resources Australia Pty Ltd | Croesus Joint Venture | 11% | Combined Annual Technical Report for the Period 08/12/1998 to 07/12/1999 PE00/10 Tenements P16/1385,1484-1487, |
| A60398 | 2000 | Thiess Bros Pty Ltd | Ubini base | 84% | Progress Report Ubini Mineral Claims Nos 75-80,947, Coolgardie Goldfield Western Australia as at 31/07/1968 |
| A61117 | 2000 | Goldfields Exploration Pty Ltd | Northlander | 40% | Annual Report Northlander Project M15/696,P15/2916,P15/3029, P15/3262-3263,P15/3363,P15/3368,P15/3370-3373,P15 |
| A61246 | 2000 | Kundana Gold Pty Ltd | Kundana | 4.8% | Kundana Project Annual Report July 1999 to June 2000,M16/72, 73,74,75,M16/87,97,157,P16/1678,1679,1680. C443/1 |
| A67175 | 2000 | Goldfields Exploration Pty Ltd | Mungari NW | 30% | Final Report documenting all work carried out on P16/1963 since its grant date@3 March 1998 Mungari NW JV Proj |
| A57311 | 1999 | Heron Resources Ltd | Mungari NW | 36% | Mungari NW Annual Report 1998 01/01/98 - 31/12/98 E16/121, 146, P16/1684-1686, 1696-1697, 1811-1813 |
| A57386 | 1999 | Goldfields Exploration Pty Ltd | Kundana | 20% | Kundana West Project Annual Report 1988 01/01/98 - 31/12/98 P16/1846, 1849, 1781, 1859, 1858, 3917, E16/163 |
| A58868 | 1999 | Goldfields Exploration Pty Ltd | Mungari Northwest | 31% | Partial Surrender Report Mungari Northwest E16/121( period covering 24/06/1996 to 23/06/1999) |
| A59055 | 1999 | Goldfields Exploration Pty Ltd | Northlander | 50% | Annual report Northlander J.V. Project Tenements P15/3363 P15/3368 P15/3370-73 P15/3824 P16/1615-18 P16/1670-1 |
| A56998 | 1999 | Gilt-Edged Mining Nl | East Kundana | 12% | East Kundana Project W.A. 02/12/97-03/12/98 Technical Report:E15/247, 113, M16/181-182, P16/1523-1530, P16/15 |
| A57321 | 1999 | Mines & Resources Australia Pty Ltd | Croesus | 11% | Croesus Joint Venture - PE99/1 08/12/97 - 07/12/98 P16/1385, 1484-1487, 1569, 1607-1614, M16/199, 200 |
| A57576 | 1999 | Gilt-Edged Mining Nl | West Kundana | 33% | West Kundana Project W.A Technical Report M16/213,214,218 P16/1531,1532 Period Reported 1/1/1998 to 31/12/1998 |
| A57698 | 1999 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 32% | Cutters Ridge Joint Venture Project PE 99/6 Annual Report 01/01/98 - 31/12/98 P15/3109-3111, 3303, M15/692 |
| A58889 | 1999 | Kinross Gold Australia Pty Ltd | Broads Dam | 1.5% | Broads Dam Project, Annual report: July 1998 - June 1999, P16/1440 - P16/1453, (Kalgoorlie). |
| A59046 | 1999 | Erdel Research & Development Pty Ltd | Kunanalling Corner Dam | 38% | Annual Technical Report Kunanalling Corner Dam Project (C476/1996) for the period 16/08/98-15/08/99 Tenements |
| A59075 | 1999 | Goldfields Exploration Pty Ltd | Kundana | 2.9% | Kundana Project Annual report 07/98-06/99 Tenements M16/72 M16/73 M16/74 M16/75 M16/87 M16/97 C443/1994 |
| A53310 | 1998 | Heron Resources Ltd | Mungari NW | 31% | Annual Report for the period 24 June 1996 to 23 June 1997. Mungari NW Project E16/121. |
| A54023 | 1998 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 32% | Cutters Ridge Joint Venture Project (PE 98/6) Annual Report, 01/01/1997 - 31/12/1997 P15/3109-3111, 3303, M15 |
| A54527 | 1998 | Hampton Hill Mining Nl | Northlander | 50% | Northlander Project, Combined Annual Technical Report 01/08/96 - 31/07/97 P15/3363, 3368, 3370-3373, 3824, P16 |
| A55096 | 1998 | Kinross Gold Australia Pty Ltd | Camel Dam/ West Black Flag | 1.4% | Broad's Dam Project Annual Report: 07/97 - 07/98 M16/88, P16/1440-1453 |
| A56268 | 1998 | Spinifex Gold Nl | Gentle Annie | 32% | Annual Report from period 01/05/97-30/04/98, Gentle Annie Project, Prospecting Licences 15/2916 & 15/3029 Ref: |
| A53481 | 1998 | Gilt-Edged Mining Nl | East Kundana | 12% | East Kundana Project, Annual Report for theperiod 02/12/1996 to 03/12/1997, E15/247; E16/113; M16/181-182; P1 |
| A53901 | 1998 | Croesus Mining Nl | Croesus JV | 11% | Combined Annual Technical Report for the period 08/12/96- 07/12/97 Tenements P16/1385,1484-1487, 1569, 1607-16 |
| A54040 | 1998 | Goldfields Exploration Pty Ltd | Kundana | 97% | Annual Report, P16/1858. 21/01/1997 - 20/01/1998 |
| A54041 | 1998 | Goldfields Exploration Pty Ltd | Kundana | 100% | Annual Report P16/1859. 21/01/1997 - 20/01/1998 |
| A54836 | 1998 | Reefton Mining Nl | Star of Fremantle | 19% | Annual Report, Star of Fremantle Project, for the period 19 November 1996 to 18 November 1997. P15/3037, P16/ |
| A55763 | 1998 | Pancontinental Gold Operations Pty Ltd | Kundana | 2.9% | Kundana Project, Annual Report 07/1997 - 06/1998 M16/72-75, 87, 97 |
| A55919 | 1998 | Delta Gold Ltd | Kunanalling Corner | 38% | Kunanalling Corner Project, Annual Technical Report 16/08/97 - 15/08/98 PL16/1633-1636 |
| A57996 | 1998 | Reefton Mining Nl | Star of Fremantle | 19% | Annual Report, P16/1410, P16/1411, P16/1412, and P15/3037. For the period 19 November 1997 to 18 November 199 |
| A52228 | 1997 | Spinifex Gold Nl | Gentle Annie | 32% | Annual Report period 01/05/96-30/04/97 Gentle Annie Project Coolgardie Mineral Field Western Australia Prospec |
| A53159 | 1997 | Amx Resources Nl | Kununalling | 3.1% | Kunanalling Gold Project M16/15, 17, 36, 99, 139, 140, 178, 236, etc. 01/11/96 - 31/10/97 |
| A49852 | 1997 | Hampton Hill Mining Nl | Northlander | 52% | Combined Annual Technical Report Northlander Project P15/3363 P15/3368 P15/3370 to P15/3373 P16/1615 to P16/16 |
| A50093 | 1997 | Gold Mines Of Coolgardie Pty Ltd | Speargrass | 99% | Annual report on the Speargrass Project for the year 11/01/1996 to 10/01/1997 Prospecting Licences P15/3262 an |
| A50240 | 1997 | Mines & Resources Australia Pty Ltd | Croesus | 11% | Croesus Joint Venture Project Combined Annual Technical report for Prospecting Licences P16/1385 P16/1484 to P |
| A50356 | 1997 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 32% | Cutters Ridge Project Combined Annual Technical Report on Prospecting Licences P15/3109 to P15/3111, P15/3303 |
| A50881 | 1997 | Coolgardie Gold Nl | Arthur Dam | 91% | Annual Report on P16/1794 Arthur Dam for the period 14/02/1996 to 13/02/1997 |
| A52394 | 1997 | Delta Gold Ltd | Kunanalling | 38% | Annual Technical Report for the Kunanalling Corner Project between 16/08/96-15/08/97 Report No:WA97.046 |
| A52650 | 1997 | Mines & Resources Australia Pty Ltd | Little Hill Dam | 56% | Little Dam Project ,Partial Surrender Report E16/78 for the period 14/09/91-17/04/97 ,E16/78. |
| A52796 | 1997 | Australasian Gold Mines Nl | Broads Dam | 1.4% | Broads Dam Project. Annual Report 07/1996 - 07/1997 M16/88, P16/1440-1453, M3695/2 |
| A53246 | 1997 | Plutonic Operations Ltd | Kundana | 17% | Kundana Project, Annual Report P16/1678, 1679, 1680 09/11/1996 - 08/11/1997. |
| A53472 | 1997 | Horizon Mining Nl | West Kundana | 33% | West Kundana Project, Period Ending: 31/12/91 Coogardie Mineral Field (Kunanalling District) Kalgoorlie M16/2 |
| A50094 | 1997 | Gold Mines Of Coolgardie Pty Ltd | Gentle Annie | 93% | Annual report on the Gentle Annie Project for the year 16/01/1996 to 15/01/1997 Prospecting Licence P15/3728 |
| A51227 | 1997 | Croesus Mining Nl | South Kunanalling | 15% | South Kunanalling Project, Annual Report on Prospecting Licence P16/1344 for the period 17/05/1996 to 16/05/19 |
| A47099 | 1996 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 32% | Cutters Ridge Project Combined Annual Technical Report on Prospecting Licence P15/3109 to P15/3111, P15/3303 a |
| A47281 | 1996 | Coolgardie Gold Nl | Speargrass 1 & 2 | 99% | Speargrass 1 & 2 Project, Annual Report for the period 11/01/1995 to 10/01/1996, P15/3262-3263. |
| A47990 | 1996 | Croesus Mining Nl | South Kunanalling | 15% | South Kunanalling Project, Annual Report for the period 17th May 1995 to 16th May 1996, P16/1344. |
| A48715 | 1996 | Pancontinental Gold Operations Pty Ltd | Kundana Operations | 2.9% | Annual report Kundana Operations M16/72 to M16/75 M16/87 and M16/97 C433/1994 Period covered 7 June 1995 to 30 |
| A49197 | 1996 | Erdel Research & Development Pty Ltd | Kunanalling -Corner Dam | 38% | Annual Technical Report Report for the period 16/08/96 Kunanalling - Corner Dam Prospect P16/1633 to P16/163 |
| A49541 | 1996 | Australasian Gold Mines Nl | Broads Dam | 1.4% | Broads Dam Project Annual report: July 1995 - July 1996 M16/88, P16/1440 - P16/1453. |
| A49626 | 1996 | Plutonic Operations Ltd | Kundana | 17% | Project 575 Kundana Annual report P16/1678 P16/1679 and P16/1680 Period 09/11/95 to 08/11/96 Technical Report |
| A49823 | 1996 | Tribune Resources Nl | Kundana West | 33% | West Kundana joint project Prospecting Licences 16/1531 and 1532 Mining Leases 16/213, 16/214 and 16/218 West |
| A46904 | 1996 | Mines & Resources Australia Pty Ltd | Croesus Joint Venture | 11% | Croesus Joint Venture Project Combined Annual report for Prospecting Licences P16/1385 P16/1484 to P16/1487 P1 |
| A47841 | 1996 | Coolgardie Gold Nl | Arthur Dam | 91% | Annual Technical Report on P16/1794 Arthur Dam for the period 14.02.1995 to 13.02.1996 |
| A48077 | 1996 | Spinifex Gold Nl | Gentle Annie | 11% | Annual report period 1 May 1995 to 30 April 1996 Gentle Annie Project Coolgardie Mineral Field Western Austral |
| A49507 | 1996 | Mines & Resources Australia Pty Ltd | Little Hill Dam | 56% | Little Hill Dam Project Combined Annual Technical Report E16/78 and P16/1466 for the period 14 September 1995 |
| A49822 | 1996 | Tribune Resources Nl | Kundana East | 12% | Exploration Licences E15/247 E15/16/113 Prospecting Licences P16/1339 P16/1375 P16/1523 to P16/1530 P16/1560 t |
| A43746 | 1995 | Mines & Resources Australia Pty Ltd | Cutters Ridge | 32% | Cutters Ridge Joint Venture Project Combined Annual report on Prospecting Licences P15/3109 to P15/3111 P15/33 |
| A45450 | 1995 | Mines & Resources Australia Pty Ltd | Little Hill Dam | 56% | LITTLE HILL DAM PROJECT. PARTIAL SURRENDER REPORT E16/78 FOR THE PERIOD 14 SEPTEMBER 1991 TO 13 FEBRUARY 1995 |
| A43418 | 1995 | Coolgardie Gold Nl | Speargrass | 99% | Annual report on P15/3262 to P15/3263 Speargrass 1 and 2 For the period 11.02.1994 to 10.1.1995 |
| A43429 | 1995 | Broadmeadows Pty Ltd | Arthur Dam | 63% | Arthur Dam project Annual report on prospecting licences 16/1685 & 16/1696 for the 12 months to 13th December |
| A43430 | 1995 | Mines & Resources Australia Pty Ltd | Croesus | 11% | Croesus Joint Venture Project Combined Annual Technical Report for Prospecting Licences P16/1608 to P16/1614 P |
| A43757 | 1995 | Kilkenny Gold Nl | Kunanalling | 11% | Kunanalling Project. Final Surrender Report, Prospecting Licences 16/1700, 1701. Report on exploration during |
All 325 report numbers over this ground
What does the exploration record say about this ground?
NextMaps reads the WAMEX reports over E 16/690 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps, with every claim cited back to its source report. New accounts include a free report (how the reports work). Prefer the raw due diligence? A Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.
Get the free report Full register record on the mapDo you hold E 16/690? Listing is free. A facilitation fee applies only if the ground ends up with a buyer we introduce.
List this tenementTenure data sourced from the DMPE public registers and SLIP WA (© Government of Western Australia, CC BY 4.0), as at 2026-10-07. Compiled by NextMaps. Verify against primary sources before reliance.