E 25/663
Register summary
- Holder
- Amery Holdings Pty Ltd
- Local government
- City of Kalgoorlie-Boulder
- Application received
- 29 Apr 2025
Exploration history on this ground
| Report | Year | Operator | Project | On this ground | Title |
|---|---|---|---|---|---|
| A149126 | 2025 | Black Cat (Kal East) Pty Ltd | Slate Dam | <1% | Final Surrender for the Slate Dam Project E25/556 for the period ending 28/04/2025 |
| A149142 | 2025 | Black Cat (Kal East) Pty Ltd | Slate Dam | 62% | Final Surrender for the Slate Dam Project E25/553 for the period ending 28/04/2025 |
| A138553 | 2024 | Miramar Resources Limited | Glandore | <1% | Final Surrender Report for E25/544 (Glandore) |
| A135921 | 2023 | Black Cat (Kal East) Pty Ltd | Slate Dam | <1% | Partial Surrender Report for the Slate Dam Project E25/556 for the period ending 10/7/2023 |
| A135225 | 2023 | Black Cat (Kal East) Pty Ltd | Slate Dam | 62% | Partial Surrender Report for the Slate Dam Project E25/553 for the period ending 02/04/2023 |
109 more reports
| A131600 | 2022 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Bulong Project (C75/2016) Annual Report for the Period May 4th 2021 to May 3rd 2022.E 27/552,E 27/554,E 27/555 |
| A131651 | 2022 | Lycaon Resources Ltd | Rocky Dam | <1% | Annual Report for C16/2022 "ROCKY DAM" for the period ending 25/04/2022. |
| A127484 | 2021 | Dreadnought Resources Ltd | Rocky Dam | <1% | E25/533 Rocky Dam Project Annual Report for the period 36/04/2020 to 25/04 2021 |
| A127639 | 2021 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Bulong Project (C75/2016) Annual Report for the Period 4th May 2020 to 3rd May 2021 |
| A124158 | 2020 | Aruma Resources Limited | SLATE DAM | 18% | Annual Report for C112/2017 Slate Dam Project for the period ending 02/04/2020 |
| A123427 | 2020 | Dreadnought (Yilgarn) Pty Ltd | Rocky Dam | <1% | Rocky Dam E25/00533 Annual Report for the period 26 April 2019 to 25 April 2020 |
| A124136 | 2020 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Bulong Project (C75/2016) Annual Report for the Period May 4th 2019 to May 3rd 2020 |
| A120323 | 2019 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Annual Report for Bulong Project C75/2016 for the period 4 May 2018 to 3 May 2019, E27/00551, E27/00552, E27/0 |
| A120476 | 2019 | Aruma Resources Limited | Slate Dam | 18% | Annual Report for C112/2017 "Slate Dam" for the period 3 April 2018 to 2 April 2019, E25/00553, E25/00556, E25 |
| A120634 | 2019 | Dreadnought Resources Ltd | Rocky Dam | <1% | Rocky Dam Project Annual Report E25/533 for the period 26 April 2018 to 25 April 2019 |
| A121506 | 2019 | Anglogold Ashanti Australia Limited | Glandore | <1% | Annual Report for the Glandore Project C142/2016, for the period 18/10/2018 to 17/10/2019 |
| A117031 | 2018 | Ironringer (Industrial Minerals) Pty Ltd | Rocky Dam | <1% | Rocky Dam Project E25/00533 Annual Report for the period 25/04/2017 - 25/04/2018 |
| A117189 | 2018 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Annual Report for Bulong Project C75/2016 for the period 04/05/2017 - 03/05/2018, E27/00551, E27/00552, E27/00 |
| A117326 | 2018 | Aruma Resources Limited | Slate Dam | 24% | Annual Report for C112/2017 Slate Dam Project for the period 3 April 2017 to 2 April 2018, E25/00553, E25/0055 |
| A118478 | 2018 | Anglogold Ashanti Australia Limited | Glandore South | <1% | Glandore South Project (C142/2016) Annual Report to the Department of Mines, Industry Regulation and Safety fo |
| A113952 | 2017 | Sumitomo Metal Mining Oceania Pty Ltd | Bulong | <1% | Bulong Project C75/2016 Annual Report for the period May 2016 to May 2017, E27/00551, E27/00552, E27/00554, E2 |
| A114101 | 2017 | Ironringer (Industrial Minerals) Pty Ltd | Rocky Dam | <1% | Rocky Dam Project E25/00533 Annual Report for the period 26 April 2016 to 26 April 2017 |
| A115445 | 2017 | Anglogold Ashanti Australia Limited | Glandore South | <1% | Glandore South Project (C142/2016) Annual Report to the Department of Mines and Petroleum for the period 18/10 |
| A108182 | 2016 | Silver Lake Resources Pty Ltd | Queen Lapage | 7.5% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2014 to 31 October 2015, E25/ |
| A104633 | 2015 | Silverlake Resources Ltd | Queen Lapage | 7.5% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2013 to 31 October 2014, E25/ |
| A104934 | 2015 | Rubicon Resources Ltd | Bulong - Yindarlgooda | 58% | Bulong - Yindarlgooda Project, Final Surrender Report for the period 29/12/2009 to 28/12/2014, E25/392. [C210/ |
| A106214 | 2015 | Silver Lake Resources Ltd | Queen Lapage | 9.1% | Partial Surrender Report on E25/273 (Queen Lapage Project) for the period 23 March 2006 to 20 March 2015 |
| A107604 | 2015 | Rubicon Resources Ltd | Yindarlgooda | 23% | Yindarlgooda Project C210/2007 Combined Annual Report for the period 1 November 2014 – 31 October 2015, E25/35 |
| A106060 | 2015 | Rubicon Resources Ltd | Bulong | 24% | Bulong, Yindarlgooda E25/422 Final Report for the period 24 May 2015 – 23 May 2015 |
| A101170 | 2014 | Silver Lake Resources Limited | Queen Lapage | 7.5% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2012 to 31 October 2013 |
| A104148 | 2014 | Heron Resources Ltd | Little Bulong | <1% | Little Bulong Project C55/2012, Annual Report for the period 29/09/2013 to 28/09/2014, M25/151,187 & 476. |
| A104174 | 2014 | Rubicon Resources Ltd | Yindarlgooda | 20% | Yindarlgooda C210/2007 Combined Annual Report E25/355, 392, 422, E27/425, 430, 443, 449 P27/1949 for the perio |
| A97157 | 2013 | Pioneer Resources Ltd | Juglah Dome | 2.2% | Final Surrender Report for the Juglah Dome Project, E25/452, East Coolgardie Mineral Field, for the period 3 M |
| A98944 | 2013 | Pioneer Resources Ltd | Juglah Dome | 1.5% | Annual report for the Juglah Dome Project, C27/2012 (E25/381 & E25/452), East Coolgardie Mineral Field, for th |
| A99756 | 2013 | Raven Resources | Reef Dam | <1% | Annual Mineral Exploration Report Reef Dam Project E 25/436 For the Period 14th September 2012 to 13th Septemb |
| A99960 | 2013 | Raven Resources | Reef Dam | <1% | Partial Surrender Mineral Exploration Report Reef Dam Project E 25/436 For the Period 14th September 2010 to 6 |
| A100409 | 2013 | Rubicon Resources Ltd | Yindarlgooda | 15% | Yindarlgooda Project, Annual Report for the period 01/11/2012 to 31/10/2013, E25/355, 392, 422 & 456; E27/425, |
| A100909 | 2013 | Heron Resources Ltd | Little Bulong | <1% | Little Bulong Project, Annual Report for the period 29/09/2012 to 28/09/2013, M25/151 & 187; E25/476. [C55/201 |
| A96582 | 2013 | Integra Mining Ltd | Queen Lapage | 7.5% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2011 to 31 October 2012, E25/ |
| A92700 | 2012 | Integra Mining Ltd | Queen Lapage | 7.5% | Combined Annual Report on Queen Lapage Project – C203/2011 for period 1 November 2010 to 31 October 2011, E25/ |
| A94705 | 2012 | Pioneer Resources Ltd | Juglah Dome | 1.5% | Combined Annual report for the Juglah Dome Project, C27/2012 (E25/381 & E25/452), East Coolgardie Mineral Fiel |
| A95636 | 2012 | Raven Resources | Reef Dam | <1% | Annual Mineral Exploration Report Reef Dam Project E25/436 For the Period 14th September 2011 to 13th Septembe |
| A96114 | 2012 | Rubicon Resources Ltd | Yindarlgooda | 16% | Yindarlgooda Project, Annual Report for the period 1st November 2011 to 31st October 2012, E25/355, 392, 422, |
| A88967 | 2011 | St Barbara Ltd | Yindarlgooda - Rocky Dam | 8.1% | Yindarlgooda (Rocky Dam) Project, Annual Report for the Period 1 November 2009 to 31 October 2010,C210/2007 Te |
| A89527 | 2011 | Rubicon Resources Ltd | Lake Yindarlgooda | 58% | Annual Report for the period 29th December 2009 to 28th December 2010, Lake Yindarlgooda Project, E25/392 |
| A91773 | 2011 | Rubicon Resources Ltd | Yindarlgooda | 25% | Yindarlgooda Project E25/316 Kanowna Mineral Field KURNALPI (SH 51-10) 1:250,000 Sheet KANOWNA (3236) 1:100,00 |
| A91935 | 2011 | Raven Resources | Reef Dam | <1% | Annual Mineral Exploration Report Reef Dam Project E25/436 For the Period 14th September 2010 to 13th Septembe |
| A92275 | 2011 | Rubicon Resources Ltd | Yindarlgooda | 13% | Yindarlgooda C210/2007 Combined Annual Report 1 November 2010 – 31 October 2011 |
| A90718 | 2011 | Rubicon Resources Ltd | White Gate Dam | 24% | Annual Report for the period 24th May 2010- 23rd May 2011, White Gate Dam Project, E25/422 |
| A85663 | 2010 | Rubicon Resources Ltd | Wattle Dam | <1% | Final report E25/222 19 Nov 2004 to 18 Nov 2009 |
| A86119 | 2010 | Rubicon Resources Ltd | Wattle Dam | <1% | Wattle Dam, E25/222, Final Report, E25/222, 19th November 2004 to 18th November 2009. |
| A88496 | 2010 | St Barbara Ltd | Yindarlgooda (Rocky Dam) | 25% | Yindarlgooda (Rocky Dam), Partial Surrender Report for the Period 8 August July 2006 to 7 August 2010 |
| A82933 | 2009 | International Exploration Ltd | EAST BULONG | 32% | Final Surrender Report East Bulong Project E25/0296 For reporting period 24th August 2005 to 9th April 2009 |
| A84588 | 2009 | St Barbara Ltd | Yindarlgooda (Rocky Dam) | 25% | Yindarlgooda (Rocky Dam) C210/2007, E25/316, Partial Surrender Report for the Period 8 August July 2006 to 7 |
| A84968 | 2009 | St Barbara Ltd | Yindarlgooda (Rocky Dam) | 8.1% | Annual Report for the Period 1 November 2008 to 31 October 2009 C210/2007, Tenement Numbers E25/273, E25/316, |
| A76906 | 2008 | Rubicon Resources Ltd | Yindarlgooda | 8.2% | YINDARLGOODA PROJECTCOMBINED REPORT C210/2007 ANNUAL REPORT 1st November 2006 to 31st October 2007 |
| A80224 | 2008 | Australasian Resources Pty Ltd | EAST BULONG | 32% | ANNUAL EXPLORATION REPORT EAST BULONG PROJECT E25/296, For reporting period 24th August 2007 to 23rd August 20 |
| A80396 | 2008 | Rubicon Resources Ltd | WATTLE DAM | <1% | WATTLE DAM E25/222, East Coolgardie Mineral Field, PARTIAL SURRENDER REPORT E25/222, 19th Nov 2004 to 18th Nov |
| A80489 | 2008 | Rubicon Resources Ltd | WATTLE DAM | <1% | Annual report for the period 1st October 2007 to 30th September 2008, Wattle Dam Project, C132/2007 |
| A80490 | 2008 | Rubicon Resources Ltd | YINDARLGOODA | 7.9% | YINDARLGOODA PROJECT COMBINED REPORT, C210/2007, E25/273, E25/316, E25/326, E25/335, E27/291, E27/337, E28/15 |
| A80208 | 2008 | Australasian Resources Pty Ltd | East Bulong | 32% | ANNUAL EXPLORATION REPORT For reporting period 24th August 2007 to 23rd August 2008 |
| A74757 | 2007 | Heron Resources Ltd | Bulong-Manor | 8.1% | Bulong - Manor Project C137/1999 Annual Report for the Period 01 Jan 2006 - 31 Dec 2006 (Kurnalpi) |
| A76260 | 2007 | Rubicon Resources Ltd | Yindarlgooda | 25% | Annual report for the period 8th August 2006 to 7th August 2007,Yindarlgooda Project, E25/316 |
| A76393 | 2007 | Australasian Resources Pty Ltd | East Bulong | 32% | Annual Exploration Report East Bulong Project E25/296 For Reporting Period 24th August 2006 to 23rd August 200 |
| A76734 | 2007 | Rubicon Resources Ltd | Wattle Dam | <1% | WATTLE DAM E25/222, E25/241, E25/271, ..............P25/1830, P25/1831, East Coolgardie Mineral Field ANNUAL R |
| A76939 | 2007 | Rubicon Resources Ltd | Wattle Dam | <1% | Partial surrender report for the period 19th November 2004 t o 16th November 2007, Wattle Dam Project, E25/222 |
| A71939 | 2006 | Heron Resources Ltd | Yindarlgooda | <1% | Yindalgooda Project Report E25/222, North East Coolgardie Mineral Field, Kurnalpi, Annual Report, 19 November |
| A73541 | 2006 | Australasian Resources Ltd | East Bulong | 32% | Annual Exploration Report, East Bulong Project E25/296, For Period 24 August 2005 to 23 August 2006, (Kurnalpi |
| A74296 | 2006 | Heron Resources Ltd | Yindarlgooda | <1% | Yindarlgooda Project, Annual Combined Report C69/2006, 01 November 2005 to 31 October 2006, (Kurnalpi). |
| A68050 | 2004 | Bulong Operations Pty Ltd | Bulong | <1% | Combined Annual Report C224/95 1st January 2003 to 31st dece mber 2003 E25/67, E27/72, E27/94 etc |
| A65953 | 2003 | Placer Dome Asia Pacific Ltd | Lake Yindarlgooda | 33% | Annual Report 14/11/2001-13/11/2002 Lake Yindarlgooda Project C9/2002 Tenements E25/226, 228 Report No WA02.08 |
| A66309 | 2003 | Bulong Operations Pty Ltd | Bulong | <1% | Combined Annual Report C224/95 for the period 1 January 2002 to 31 December 2002 E25/67, E27/72,94, L27/55-56, |
| A64757 | 2002 | Bulong Operations Pty Ltd | Bulong | <1% | Combined Annual Report C224/95 1st January 2001 - 31st December 2001 Exploration Licences 25/67, 27/72, 27/94 |
| A64009 | 2002 | Delta Gold Ltd | Queen Lapage | 9.1% | Queen Lapage JV Project C16/1998 Annual Report 01/01/2001 to 31/12/2001 tenements E25/111, 117, 120, 122, 200, |
| A62896 | 2001 | Delta Gold Ltd | Queen Lapage | 4.3% | Queen Lapage Joint Venture E25/111, E25/120 Partial and Final Surrender Report. Delta Report Number: WA01.017. |
| A62925 | 2001 | Delta Gold Ltd | Queen Lapage | 8.7% | Queen Lapage Joint Venture E25/111, E25/117 E25/120 E25/122 E25/190 E25/200 E27/193 GML25/1586 GML/1587 Annual |
| A60112 | 2000 | Croesus Mining Nl | Queen Lapage | 3% | QUEEN LAPAGE PROJECT ANNUAL TECHNICAL REPORT ON EXPLORATION ACTIVITY FOR THE PERIOD 1/1/99 TO 31/12/99. ON EXP |
| A60114 | 2000 | Croesus Mining Nl | Queen LaPage | 19% | Queen LaPage Project, Final Report on E25/78 for the period 14 October 1998 to 13 October 1999 |
| A57919 | 1999 | Croesus Mining Nl | Queen Lapage | 12% | Queen Lapage Project ,Annual Technical Report on Exploration Activity for the period 28/02/1998 to27/02/1999 |
| A59370 | 1999 | Wiluna Mines Ltd | Lake Yindarlgooda | 24% | Exploration Licence E25/132, Lake Yindarlgooda, Surrender Report for the Period 5 August 1996 to 29 July 1999, |
| A59489 | 1999 | Croesus Mining Nl | Queen Lapage | 9.8% | Partial Surrender Report, Queen Lapage project, Tenement E25/111, 24 April 1998 to 23 April 1999. |
| A53990 | 1998 | Croesus Mining Nl | Queen Lapage | 15% | Annual Report to the Dept of Minerals and Energy for the Queen Lapage Prospect E25/122, Prepared for on behalf |
| A54187 | 1998 | Julia Mines Nl | Lake Yindarlgooda | 19% | Lake Yindarlgooda Alluvial Gold Project Annual Report for year ended 14 October 1997 E25/78 |
| A51330 | 1997 | North Ltd | Rocky Dam | 8.4% | Report on E25/63,105, 81; M27/168 & M25/147, Rocky Dam, for the period 01/01/1996 to 30/04/1996. |
| A51447 | 1997 | North Ltd | Rocky Dam | 9.8% | Rocky Dam Project, Annual Report Exploration Licence E25/111for period 1st May 1996 to 30th April 1997. |
| A51220 | 1997 | Titan Resources Nl | Top Swamp | 1.3% | Top Swamp Project, Annual Report E25/130 for reporting period 15th April 1996 to 14th April 1997. |
| A52971 | 1997 | Croesus Mining Nl | Queen Lapage | 21% | Queen Lapage Project, Final Surrender Report for the period 1st May 1996 to 17th November 1997, E25/105. |
| A46957 | 1996 | North Ltd | Queen Lapage | 8.4% | Queen Lapage Project, Annual Report For the period 31/12/1994 to 31/12/1995, E25/81, M27/168, 25/147. |
| A48757 | 1996 | North Ltd | Gundockerta North | 61% | Gundockerta North Project, Annual Report for the period 02/09/1995 to 01/09/1996, P25/1368-1377. |
| A47039 | 1996 | North Ltd | Lake Yindarlgooda - Gundockerta | 19% | Lake Yindarlgooda - Gundockerta Project,Partial Surrender Report for the period ending 13/10/95 E25/78 |
| A47040 | 1996 | North Ltd | Lake Yindarlgooda - Gundockerta | 19% | Annual Report for E25/78 Gundockerta, Lake Yindarlgooda, WA Fourth Year ending 13 October 1995. |
| A49022 | 1996 | North Ltd | Lake Yindarlgooda - Gundockerta | 19% | Annual mineral exploration report for E25/78 Gundockerta, Yindarlgooda, WA, for the period ending 13 October 1 |
| A47480 | 1995 | Western Mining Corporation Ltd | Glandore | <1% | Annual Report for the period 1 January 1995 to 31 December 1995 , Glandore Project, M25/73 M25/74 M25/86 M25/ |
| A44678 | 1995 | Western Mining Corporation Ltd | Glandore | <1% | Annual report for the period 1 January 1994 to 31 December 1994 Glandore Project Mining Leases M25/73 M25/74 M |
| A45677 | 1995 | North Ltd | Gundockerta North | 61% | Gundockerta North Project,(First Year) Annual Report P25,1368-1377 for the period 02/09/1994 to 01/09/1995. |
| A41175 | 1994 | Western Mining Corporation Ltd | Glandore | 1.2% | Annual Report for the period 01/01/93-31/12/93 Glandore Project M25/73,74,86,88,90,95,97,98 |
| A42952 | 1994 | North Mining Ltd | Gundockerta North | 18% | Annual report for the period 27/10/93-27/10/94 Gundockerta North Project M25/116 |
| A40652 | 1994 | Geopeko | Lake Yindarlgooda -Gundockerta | 19% | Annual Report for E25/78, Gundockerta, Lake Yindarlgooda, WA. Second Year ending 13 October 1993. |
| A41998 | 1994 | Croesus Mining Nl | Queen Lapage | 4.3% | Queen Lapage Project, Partial Surrender Report covering period(s) to 5th September 1994, E25/56, E25/63 & E27/ |
| A42953 | 1994 | North Mining Ltd | Gundockerta North | 61% | Gundockerta North Project, (Taurus & Slate), Annual Report for the period 27/10/1993 to 01/09/1994, M25/114 & |
| A43248 | 1994 | North Mining Ltd | Lake Yindarlgooda- Gundockerta | 19% | Annulal Report for E25/78 Gundockerta, Lake Yindarlgooda WA, Third Year ending 13 October 1994. |
| A37705 | 1993 | Western Mining Corporation Ltd | Glandore | 1.2% | Three Year Report for the Period 01/01/90 - 31/12/92 The Glandore Project Mining Leases 25/73-74,86,88,90,95,9 |
| A37809 | 1993 | Geopeko | Lake Yindarlgooda -Gundockerta | 19% | Report for E25/78 Gundockerta, Lake Yindarlgooda, WA. First year ending 13 October 1992. |
| A38321 | 1993 | Cra Exploration Pty Ltd | Queen Lapage | 2.4% | Queen Lapage Project, Annual Report for period to 30/04/1993, GML25/1586-1587, P25/1079-1083, P27/1014, M25/10 |
| A36868 | 1992 | Cra Exploration Pty Ltd | Queen Lapage | 2.3% | Queen Lapage Project, Annual Report for period ending 30th April 1992, GML25/1586-1587, E25/18, 56, 63, 72, 81 |
| A33331 | 1991 | Croesus Mining Nl | Queen Lapage | 3.7% | Queen Lapage Project, Annual Report for the period ending April 30th 1991, E25/18, 56, 63; E27/62; P27/1014; M |
| A11492 | 1982 | Electrolytic Zinc Co | Rocky Dam | 39% | Rocky Dam Project, Final Surrender Report for the period ending 31/07/1978, MC25/1163-1180. |
| A5073 | 1973 | Western Nickel Pty Ltd | Bulong | <1% | Bulong Project, Non-statutory Report: Geological Report for the period 1st January 1972 to 31st March 1973, |
| A1279 | 1970 | Western Nickel Pty Ltd | Bulong | <1% | Bulong Project, Annual Report for the period ending 31/12/1970, TR70/4677H; MC27/60, 232-233, 462-470, 775-777 |
| A2177 | 1970 | Union- Homestake- Hanna Syndicate | Anzac | <1% | Anzac Project, Non-statutory Report: (3) Report(s) covering the period (s) 24/04/1968 TO 12/11/1970, MC25/138- |
| A1277 | 1968 | Western Nickel Pty Ltd | Bulong | <1% | Bulong Project, Annual Report for the period ending 31/12/1968, TR70/4677H; MC27/60, 232-233, 462-470, 775-777 |
| A82549 | 1753 | St Barbara Ltd | ROCKY DAM | 9.1% | ROCKY DAM PROJECT PARTIAL SURRENDER REPORT FOR THE PERIOD 23 MARCH 2006 – 20 MARCH 2009 |
| A5072 | 1753 | Western Nickel Pty Ltd | Bulong | <1% | Bulong Annual Report, Year Ending 31st March 1974 |
| A38751 | 1753 | Inco Australia Ltd | Eastern Goldfields regional mapping | <1% | Eastern Goldfields regional mapping |
Tenure detail Free account
- Current holders & shares
- Holder change history
- Expenditure history
- No expenditure obligation until granted
- Conditions & endorsements
- Native title context
- Combined reporting
- Rent status
Tenement intelligence
Expenditure compliance, expiry and ownership-age signals become available once this application is granted. E 25/663 is a pending application, so it has no expenditure obligation, expiry date or ownership history yet.
What does the exploration record say about this ground?
NextMaps reads every WAMEX report over E 25/663 into a referenced prospectivity assessment: the geology, the historical programs, the drill intercepts and geochemistry, and the untested gaps — every claim cited back to its source report. New accounts include a free prospectivity report. Prefer the raw due diligence? The Tenure Pack bundles the full register record, tenure history and spatial datasets for this ground.